OPW25/0012 - Fauna Management Plan
Plans and drawings: the text below has words only, no drawings.
Very large file (18.3 MB): may take a few minutes to open.
Original PDF page 19, section 1. The text section number identifies this passage in the reader.
Fauna Management Plan 3-7 Serenity Close, Noosa Heads Action Task Responsibility Timing 5) The limb and/or compensatory habitat / nest box will then be placed in a cool, quiet location until translocation to the recipient habitat site, when at dusk the hollow entrance is re-opened to allow the fauna to emerge of its own accord. Directional 1) Directional vegetation clearing is to be Contractor, During vegetation employed guide fauna towards retained Fauna Spotter, vegetation clearing vegetation at the south of the site, allowing Site Manager clearing fauna to leave the site and access retained habitat without human intervention. Refer to Figure 4 for clearing areas and direction of clearing. 2) Habitat trees of high importance should be felled last, after surrounding less important vegetation has been cleared to allow easy access of special plant and equipment (such as cherry pickers), and to allow unhindered lowering of hollow-bearing limbs. It is not acceptable to fell or push over hollow‐ bearing trees without first removing wildlife, due to the high risk of severe deceleration and/or crushing injuries to wildlife inhabiting such trees. 1) Retained trees are to be protected in accordance with Australian Standard 4970- 2009 Protection of trees on development sites as outlined in the approved Vegetation Management Plan. 2) The approved Vegetation Management Plan is to be provided to all contractors and personnel involved in clearing and construction activities on the site. All machinery 1) Visually check all the machinery for the Fauna Spotter, Immediately is to be presence of fauna before the start of Site Manager prior and checked for construction. during fauna before 2) Visually check all the routes for the presence vegetation the beginning of fauna before allowing construction to clearing of operations start. Restrict vehicle 1) No vehicle access to areas of vegetation yet Site Manager During access to be cleared. vegetation 2) Access is prohibited to vehicles outside of clearing construction machinery. 3) Set lower vehicle speeds around the site so that motorists have a longer response time 17 | 35
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW25/0012 - Fauna Management PlanRelated documentApplication case desk ↗
About this file
- File size
- 18.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.