Council archive · source document
OPW25/0012 - Fauna Management Plan
Plans and drawings: the text below has words only, no drawings.
Very large file (18.3 MB): may take a few minutes to open.
Original PDF page 3, section 1. The text section number identifies this passage in the reader.
Fauna Management Plan 3-7 Serenity Close, Noosa Heads CONTENTS 1 Introduction 2 2 Development 6 3 Construction and Clearing Impacts 7 3.1 Clearing Impacts 7 3.2 Construction Impacts 8 4 Management Measures 9 4.1 Pre-clearing Management Measures 10 4.2 Clearing Management Measures 15 4.2.1 Activities and Management Procedures 15 4.2.2 Equipment and Removal Techniques 19 4.2.3 Equipment and Removal Techniques - Koalas 20 4.2.4Fauna Scenario and Appropriate Responses 21 4.3 Construction Management Measures 28 4.4 Post-construction Management Measures 30 5 Compliance and Monitoring 32 5.1 Compliance 32 References 33 Appendix 1: Approved Development 34 Appendix 2: Personnel Register 35 1 | 35
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW25/0012 - Fauna Management PlanRelated documentApplication case desk ↗
About this file
- File size
- 18.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.