2020-01-13 GC Agenda - Item 6 - Attachment 1 - Noosa District Sports Complex Master Plan

of 48

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
8.     Development Staging Plan
Once finalised the master plan will guide the future development of the Noosa District Sports Complex. This
section outlines the proposed staging of development.

In addition to this staged development, it is recommended that the master plan is reviewed and updated
after years three (3) and six (6) with a full review and update (new 10-year master plan) in year nine (9).

Table 6: Proposed Staging
 Priority/ Year       Zone                     Works Description
 Short                Netball                  Upgrade netball courts, include
 Year 2 - 3                                    • Replace fittings (as required) with (min) 100 lux LED lights
                                               • Resurface 1 x grass courts to hardcourt surface
                                               • Resurface 4 x asphalt courts to hardcourt surface
                                               • Install solar panels
 Year 1               Softball                 Upgrade lighting to diamonds
                                               • Replace fittings (as required) with 200 lux LED lighting
 Year 1- 3            Whole complex            Internal road connections:
                                               • Relocate internal north-south road from east of the rectangular fields
                                               to the west of these fields (running along the edge of the vegetation)
                                               (road corridor width to be 14m)
                                               • Connect eastwards to current road north of the rugby league clubhouse
                                               • Include new road connection north of tennis centre joining current
                                               western access road

                                               Formalise carpark south of Touch clubhouse

                                               Formalise new access from Butler St to northern rugby league overflow
                                               carpark for temporary use during permitted events

                                               Design safe pedestrian and cycle movement into and throughout the site:
                                               • From the two entrances to each car park node
                                               • From entrances to external path network, including to connection to
                                               underpass at Butler/ Poinciana junction
                                               • From car park to clubhouse/ amenity and activity zones
                                               • Safety lighting (LED) along paths and at all site entries

                                               Signage:
                                               • Update entrance signage
                                               • Update site map signage
                                               • Incorporate internal directional signage within internal road network
 Year 1               Rugby League &           • Realign/ rebuild 1x rugby league and 2x touch fields (western) to
                      Touch                    accommodate pedestrian and roadway realignment, Irrigation and
                                               improved field drainage, sow surface to high-wear turf species
                                               • Replace fittings (as required) with 150 lux LED lights (RL)
                                               • Replace poles with new fittings (as required) with150 lux LED lighting
                                               (local standard competition) (Touch)
                                               • Relocate scoreboard
                                               • Install perimeter fencing to Touch fields

                                               Upgrade stormwater infrastructure to reduce failures and improve
                                               drainage of site (eastern side of fields)
 Year 2               Tennis                   • Reconfigure tennis centre clubhouse to incorporate new amenities




Noosa Council  Noosa District Sports Complex Master Plan 2020-2030  Final                                       Page 37
Log in to download the original file

2020-01-13 GC Agenda - Item 6 - Attachment 1 - Noosa District Sports Complex Master Plan(PDF, 8MB).pdf · 8.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.