DERM Referral Agency response 132006.1168.02

of 44

Text shows just the words. Original shows the document exactly as it was published.

 ecoaccess
 Calibration

 (A7)     All instruments and devices used for the measurement or monitoring of any parameter under any
          condition of this development approval must be calibrated, and appropriately operated and
          maintained.

 Release of Visible Light

 (A8)    Any visible light released from the approved place must not, in the opinion of an authorised person,
         cause an environmental nuisance at or beyond the boundary of the approved place.

Site-Based Environmental Management Plan

(A9)     The registered operator must implement an effective and appropriate Site-based Management Plan
         which details how the registered operator will manage the actual and potential environmental impacts
         resulting from the carrying out of the environmentally relevant activity.

(A10)    The Site-based Management Plan must address at least the following matters:

         (i)      Routine operating procedures to prevent or minimise environmental harm, however
                  occasioned or caused during normal operations;
         (ii)      Maintenance practices and procedures;
         (iii)     Contingency plans and emergency procedures to deal with foreseeable risks and hazards
                   including corrective responses to prevent and mitigate environmental harm (including any
                   necessary site rehabilitation);
         (iv)      Monitoring of the release of contaminants into the environment including procedures,
                   methods, record keeping and notification of results;
         (v)      Assessment of the environmental impact of any releases of contaminants into the
                   environment including procedures, methods, record keeping and notification of results;
         (vi)      Handling of environmental complaints;
         (vii)     Keeping and production of environmental records and reports;
         (viii)   Lines and methods of communication to be utilised for communication of procedures, plans,
                   incidents, potential environmental problems and results, including a feedback mechanism to
                  ensure that management is made aware of potential environmental problems and any failure
                  of procedures adopted; and
         (ix)     Staff training and awareness of environmental issues related to the operation of the
                  environmentally relevant activities, including responsibilities under the Environmental
                  Protection Act.
         (x)      Investigation and evaluation of alternative treatment options which shall include at least the
                  following:
                  (a)      cleaner production technologies including nutrient removal;
                  (b)      disposal and/or reuse of effluent and stockpiled dried sludge; and
                  (c)      reporting the results of any investigation and evaluation to the administering
                           authority.

(Al 1)   A copy of the Site-based Management Plan must be kept at the approved place and be available for
         examination by an authorised person on request.

(A12)    The registered operator must not implement a Site-based Management Plan or amend a Site-based
         Management Plan where such implementation or amendment would result in a contravention of any
         condition of this approval.

Annual Monitoring Report

(A13)    An annual monitoring report must be prepared each year and presented to the administering
         authority when requested. This report shall include but not be limited to:




1 Permit includes licences, approvals, permits, authorisations, certificates, sanctions           Page 4 of 21
or equivalent/similar as required by legislation administered by the
Department of Environment and Resource Management

Used in these records

About this file

File size
2.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

DERM Referral Agency response 132006.1168.02.pdf · 2.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.