DERM Referral Agency response 132006.1168.02
ecoaccess
Calibration
(A7) All instruments and devices used for the measurement or monitoring of any parameter under any
condition of this development approval must be calibrated, and appropriately operated and
maintained.
Release of Visible Light
(A8) Any visible light released from the approved place must not, in the opinion of an authorised person,
cause an environmental nuisance at or beyond the boundary of the approved place.
Site-Based Environmental Management Plan
(A9) The registered operator must implement an effective and appropriate Site-based Management Plan
which details how the registered operator will manage the actual and potential environmental impacts
resulting from the carrying out of the environmentally relevant activity.
(A10) The Site-based Management Plan must address at least the following matters:
(i) Routine operating procedures to prevent or minimise environmental harm, however
occasioned or caused during normal operations;
(ii) Maintenance practices and procedures;
(iii) Contingency plans and emergency procedures to deal with foreseeable risks and hazards
including corrective responses to prevent and mitigate environmental harm (including any
necessary site rehabilitation);
(iv) Monitoring of the release of contaminants into the environment including procedures,
methods, record keeping and notification of results;
(v) Assessment of the environmental impact of any releases of contaminants into the
environment including procedures, methods, record keeping and notification of results;
(vi) Handling of environmental complaints;
(vii) Keeping and production of environmental records and reports;
(viii) Lines and methods of communication to be utilised for communication of procedures, plans,
incidents, potential environmental problems and results, including a feedback mechanism to
ensure that management is made aware of potential environmental problems and any failure
of procedures adopted; and
(ix) Staff training and awareness of environmental issues related to the operation of the
environmentally relevant activities, including responsibilities under the Environmental
Protection Act.
(x) Investigation and evaluation of alternative treatment options which shall include at least the
following:
(a) cleaner production technologies including nutrient removal;
(b) disposal and/or reuse of effluent and stockpiled dried sludge; and
(c) reporting the results of any investigation and evaluation to the administering
authority.
(Al 1) A copy of the Site-based Management Plan must be kept at the approved place and be available for
examination by an authorised person on request.
(A12) The registered operator must not implement a Site-based Management Plan or amend a Site-based
Management Plan where such implementation or amendment would result in a contravention of any
condition of this approval.
Annual Monitoring Report
(A13) An annual monitoring report must be prepared each year and presented to the administering
authority when requested. This report shall include but not be limited to:
1 Permit includes licences, approvals, permits, authorisations, certificates, sanctions Page 4 of 21
or equivalent/similar as required by legislation administered by the
Department of Environment and Resource Management
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
DERM Referral Agency response 132006.1168.02Related documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.