Council archive · source document
DERM Referral Agency response 132006.1168.02
ecoaccess
envifanmenta/ iicennns and permits
SCHEDULE H - MONITORING AND REPORTING
Complaint Recording
(H1) All complaints received by the registered operator relating to releases of contaminants from
operations at the approved place must be recorded and kept in a log book with the following details:
(i) time, date and nature of, complaint;
(ii) type of communication (telephone, letter, personal etc.);
(iii) name, contact address and contact telephone number of complainant (Note: if the
complainant does not wish to be identified then "Not identified" is to be recorded);
(iv) response and investigation undertaken as a result of the complaint;
(v) name of person responsible for investigating complaint; and
(vi) action taken as a result of the complaint investigation and signature of responsible person.
Sampling and Monitoring Point Details
(H2) Determinations of the quality of contaminants released to waters to check conformity with the release
quality characteristics specified in the Water Schedule of this development approval must be
undertaken at the sampling and measurement point described as:
Sampling Point S3 - effluent from the wetwell downstream of the UV contact channel at the
Noosa Coastal Sewage Treatment Plant.
Quality Determinations
(H3) All determinations of the quality of contaminants released to waters must be made in accordance
with methods prescribed in the Environmental Protection Agency's Water Quality Sampling Manual
1999, or more recent additions or supplements to that document as such become available.
(H4) All determinations of the quality of contaminants released must be performed by a person or body
possessing appropriate experience and qualifications to perform the required measurements.
Monitoring Of Volume of Release
(H5) The daily quantity of contaminants released must be determined by an appropriate method.
(H6) Records must be kept of the results of all determinations of the daily quantity of contaminants
released to waters.
Noise Monitoring
(H7) The method of measurement and reporting of noise levels must comply with the Environmental
Protection Agency's Noise Measurement Manual March 2000, or more recent additions or
supplements to that document as become available.
(H8) The measurement and reporting of noise levels must be undertaken by a person or body possessing
appropriate experience and qualifications to perform the required measurements.
(H9) The results of the noise monitoring required by condition H8 must be submitted to the administering
authority in a report within 14 days of the monitoring occurring.
1 Page 17 of 21
Permit includes licences, approvals, permits, authorisations, certificates, sanctions
or equivalent/similar as required by legislation administered by the
Department of Environment and Resource Management
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
DERM Referral Agency response 132006.1168.02Related documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.