2016-04-26 General Committee Meeting Notes

of 3

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING                                                   26 APRIL 2016


                9.1. Stormwater system designed and constructed in accordance with
                     Council’s Planning Scheme Policy 5 – Engineering Design Standards –
                     Roads, Drainage and Earthworks
                9.2. No adverse impact on other properties and the road’s footpath and
                     grassed verge (eg by diverting flows and/or blocking flows and causing
                     additional ponding)
                9.3. Where applicable, extension of the site stormwater system to
                     accommodate stormwater from external site, including registration of
                     drainage easements
                9.4. The use of gravity stormwater drainage only and not surcharge pits or
                     pumps.
          10.   Stormwater runoff from the development must be disposed of without causing
                scour or damage to the subject site or any adjoining property.
          Water & Sewer Connections
          11.   An underground connection to reticulated water and sewerage must be
                provided to each lot in accordance with the standards and requirements of
                Northern SEQ Distributor–Retailer Authority (Unitywater).
          12.   A Certificate of Completion from the Northern SEQ Distributor–Retailer
                Authority (Unitywater) must be submitted to Council that certifies an
                underground connection to reticulated water and sewerage has been provided
                to each lot.
                                                                                  Carried.
    Cr Pardon voted in favour of the motion.

    Cr Jackson re-joined the meeting.




2   OPERATIONAL PLAN PROGRESS REPORT -3RD QUARTER 2015-16
    Committee Recommendation
    Moved:            Cr Pardon
    Seconded:         Cr Stockwell
    That Council note the report by the Chief Executive Officer to the General Committee
    Meeting dated 26 April 2016 providing an update on progress with the implementation of
    the Operational Plan to 31 March 2016 and details of Council’s Key Performance
    Indicators.
                                                                                   Carried.




                                                                               Page 3 of 3
Log in to download the original file

2016-04-26 General Committee Meeting Notes(PDF, 246KB).pdf · 252 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.