Development Application part 1 of 2 IDAS Forms
25/09 2013 15:10 ~~~ 0754852274 FRALEY I013
to the application.
Applications for building work (including extensions
and assessable
demolition)
Floor plans drawn to an appropriate scale
(1:50.1:100 or 1:200 ara o Confirmed
recommended s<:ales)which show the following:
. the north point [31ijotapplJcable
. the intended use of 88ch area on the floor
plan (for commercial, industrial
or mIxed use developments
only)
. the room layout (for resIdential
development only)with all rooms clearly
labelled
. the existing and the
proposed built form (for extensions only)
. the oross floor area of each
or()gosed floor area.
EleVations drawn to an appropriate scale
(1:100,1:200or 1:000 are oConfirmed
rBcommended scales)which show plans of all
building elevations and
facedes. clearly labelled to Identify orientation QNot applicable
(e.g.north elevation).
Plans showing the size. location,
proposed site cover, propoged maximum
number of storeys, and proposed maximum
height above natural ground level
oConfirmed
of the proposed new
building work. gNot applfcable
Plans showIng the extent of
any assessable d8molltton.
oConfIrmed
Cd’Not appncable
Applications for operational work Involving earthworks
(tJlling and excavating)
drawings showing:
o Confirmed
.
eXisting and proposed contours
.ar BS to be cut and filled
~otapplicable
. the location and level of any
permanent survey mari<s or referer’lce
stations used as datum for the works
. the location of any proposed
retaining walls on the relevant land end their
height
. the defined flood level (tf
applicable)
. the defined fJllleveljif
~Icabl~
AppUcatrons for operatIonal work Involving roadworks
Drawings I5howlng:
eConfirmed
. existing and proposed contours
. the centreline or construction line ,wNotappJlcable
showing chainages. bearings, off$ets if
the construction line is not the centrellne
of the road and all Intersection
points
.information for each curve Including tangent
point chalnages and offsets,
urve radii, arc length,
tangent lengfh. supere(evatlon (if applicable) and
curve widening (if applicable)
.kerb lines
Inoluding kerb radII (where not parallel to centreline) and
tangent point changes (where not parallel to oentreUne)
.
edge of pavement where kerb Is not constructed
.
position and extent of channellsation _
. location and details of all traffic sIgns,
guideposts, guardrail and other
street furniture
.
pavement markings including details on raised pavemant markers
.
catohplt, manhore and prpeline locations
.
dralnage delails (if applicable}
.
cross road drainage culvElrn. (if
applicable)
.
concrete footpaths and cycle paths
. location end details for access points,
ramps and Invert crossings
3
IDAS (orm a-Building or ope/srlonal IYOI}( assess/lble
g inst (’J pl8niling scllem&
Vsrs;on 2 0 17 December 2012
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.