Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

2017-11-07 Planning & Environment Committee Agenda

of 65

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                           7 NOVEMBER 2017


Ordinary Meeting, 21 September 2017, Item 8, Page 7
That Council note the report by the Infrastructure Assessment Coordinator to the Planning &
Environment Committee Meeting dated 12 September 2017 regarding the remaining
requirements for the Schedule of Works (SOW) Model for the new Local Government
Infrastructure Plan (LGIP) under The Noosa Plan 2006 and approve:
A.   The methodology used to determine existing trunk infrastructure network items from
     Council’s Geographic Information System (GIS) and current replacement costs obtained
     from Council’s Financial Asset Register;
B.   The Generic Land Valuation prepared by CBRE Valuations Pty Limited dated
     February2012 provided in Attachment 1 to the report and indexed to the LGIP June 2014
     base date as the basis for applying a uniform generic land cost in the Schedule of Works
     Model (SOW) for all existing and future land;
C.   A minor amendment to the Schedule of Works (SOW) future items for the Public Parks&
     Land for Community Facilities Network provided in Attachment 2 to the report noting that
     the cost estimates will be refined following completion of the excel SOW Model;
D.   The LGIP Briefing Note provided in Attachment 3 to the report providing the basis for the
     Infrastructure Network Demand Assumptions and Conversions; and
E.   Note that following completion of the SOW model, draft LGIP and Independent Reviewer’s
     first review, a further report on the complete draft LGIP will be presented for Council’s
     consideration and adoption to proceed to the Minister’s first State review.


Finance & Risk
Council needs to have amended its current Priority Infrastructure Plan (PIP) to a Local
Government Infrastructure Plan (LGIP) by 30 June 2018 in order to continue issuing
infrastructure charges and impose conditions about trunk infrastructure on development.
Since January 2014 to September 2017, $8,779,704 has been collected in infrastructure charges
equating to a current average of $195,105 per month or $2,341,254 per annum. The 2017/2018
budget has conservatively estimated the infrastructure charges revenue at $1,867,359.
A long term risk of LGIPs is the commitment ultimately made to provide future infrastructure at
the desired standards of service to meet development growth.


Consultation
External Consultation - Community & Stakeholder
Unitywater;
Department of Transport and Main Roads;
Integrated Infrastructure Planning (Independent Reviewer).
Internal Consultation
The Draft LGIP has been prepared with input from Directors, Managers, Coordinators and
Officers within the Environment & Sustainable Development, Infrastructure Services, Community
Services and Corporate Services Departments.




                                                                                Page 18 of 65
Log in to download the original file

2017-11-07 Planning & Environment Committee Agenda(PDF, 5MB).pdf · 5.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.