PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 NOVEMBER 2017
d. the realignment of the existing vehicle track to join to the end of the southern half of
the new road;
e. the removal of the redundant sections of the existing vehicle track and the areas
turfed or grass seeded;
f. the construction of the vehicle access to proposed Lots 7 and 8.
Stormwater Quantity
7. The new stormwater works must be constructed in accordance with the approved plans
and the works must be undertaken in accordance with an Operational Works approval.
8. The stormwater elements of the development, including the basin at 14 Eagle Drive, are to
be built in accordance with the BSM stormwater report Detailed Design of Stormwater
Detention Volume dated 18.09.2017, letter from BSM dated 13.10.2017, letter from Haynes
Consulting Engineers dated 11.10.2017 and accompanying plans. Where design elements
will be finalised at a later stage, these will be in accordance with the relevant codes,
standards, guidelines and Council’s requirements.
9. All basin retaining structures are to be structurally certified to Council’s design life as part of
operational works design and certification is to be provided to Council prior to plan sealing.
10. Appropriate protection will be provided against scour at basin inflow and outflow points.
Stormwater Quality
11. Prior to Council accepting water quality treatment device assets “Off Maintenance”, the
applicant must provide Council with a Schedule of Maintenance Costs for all activities
undertaken to maintain the bio retention basins in accordance with the most current version
of Healthy Waterways Bio-retention Basin Maintaining Vegetated Stormwater Assets
Guidelines. The schedule shall include records of actual costs of maintenance work
undertaken.
12. Existing native trees on the site and in the road verge must be retained in accordance with
an Arborist Report for the development and referenced in a Development Permit for
Operational Works. The existing native trees to be retained must be located clear of
proposed services, not present a nuisance to neighbouring properties and generally
suitable for the proposed location.
13. Vegetation must only be removed or disturbed in accordance with a Fauna Management
Plan (or part thereof) and endorsed through an Operational Works approval.
Landscaping Works
14. The development site must be landscaped. The works must be undertaken in accordance
with an Operational Works approval and the Noosa Plan for that specific area and must
include in particular:
a. Provision of 1 native street tree within the road reserve for every 8 metres of new
road.
b. 100mm deep mulching and landscaping to any batter within road reserves that
exceed 1 in 4 slope (25%).
c. Turf and garden beds to road reserve, including retained trees.
d. Retaining walls within the bio-basin must be constructed or permanently faced with
materials which provide for a natural appearance such as sandstone, bluestone,
granite or the like.
Page 27 of 65
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.