2017-11-07 Planning & Environment Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 NOVEMBER 2017
Electricity and Telecommunication Services
23. Underground reticulated electricity and telecommunication services must be provided to
each lot in accordance with an approval for Operational Works and the standards and
requirements of the relevant service provider.
24. Unless otherwise stipulated by telecommunications legislation at the time of construction,
the development must be provided with all necessary conduits, pits and pipes to
accommodate the future connection of optic fibre technology telecommunications.
25. Certification must be submitted to Council from all relevant service providers which certifies
that the development has met the requirements of this Decision Notice and all applicable
legislation at the time of construction.
Easements
26. A minimum 1.5 metre wide easement for drainage purposes must be registered against the
title/s of the burdened properties in favour of the benefitted properties over the proposed
easements identified on the Approved Plans. The easements must of sufficient width to
wholly encompass the drainage structures and the associated overland flowpaths.
27. An easement for access and service purposes must be registered against the titles of
proposed Lot 21 in favour of proposed Lot 20
28. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
29. All easements must be designed in accordance with the planning scheme and granted at
no cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
30. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
31. All fill and associated batters must be undertaken in accordance with an Operational Works
approval, and contained entirely within the subject site unless written permission from the
respective landowner(s) is provided to Council.
32. All fill and associated batters must be contained entirely within the subject site unless
written permission from the respective landowner(s) is provided to Council. All earthworks
must be undertaken in accordance with the provisions of Australian Standard AS3798:
Guidelines on Earthworks for Commercial and Residential Developments.
REPORT
1. PROPOSAL
This application seeks to reconfigure 2 existing residential lots into 21 residential house lots. The
other two lots which form part of the application are to be used for the purpose of stormwater
management.
The two lots to be reconfigured are 35A Tait Street and 20 Eagle Drive, Tewantin.
A stormwater easement is proposed for 29 Tait Street and 14 Eagle Drive is proposed to be
utilised for the purpose of a detention basin (drainage reserve).
The first stage of the reconfiguration will result in the creation of 10 lots with an additional 11 lots
to be created in the second stage. All new lots are at least 600m 2 and two of the three proposed
battle-axe lots are in excess of 800m2.
Page 29 of 65
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.