Council archive · source document
Decision Notice - Approved by Delegation of Authority MCU22 0007 · MCU22/0007
Officer: Mark Lewis Direct Telephone: 07 53296290 Our Reference: MCU22/0007 & OPW22/0024 Your Reference: . 12 May 2022 TC St Baker & JK St Baker C/- The Jetty Specialist 18 Ron Parkinson Cres CORBOULD PARK QLD 4551 [email protected] Dear Sir Decision Notice Planning Act 2016 I refer to your application and advise that on 11 May 2022, Council decided to approve the application subject to conditions. Details of the decision are as follows: application details Application No: MCU22/0007 & OPW22/0024 Street address: 7 Witta Cir Noosa Heads Qld 4567 Real property description: Lot 92 N 21846 Planning Scheme: Noosa Plan 2020 (25 September 2020) Decision details Council decided to issue the following type of approval: Development Permit for Material Change of Use - Landing – Residential and Development Permit for Operational Works – Prescribed Tidal Works – Pontoon System. CURRENCY PERIOD of approval The currency period for this development approval is stated in the conditions below. assessment manager conditions Approved Plans Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date JSP-SJ-35590 C Site Plan, Layout Plan & Water Allocation prepared by Edge Consulting Engineers 10 February 2022 JSP-SJ-35591 B Elevation prepared by Edge Consulting Engineers 25 November 2021 JSP-GW-006 M Standard Catwalk Construction prepared by Edge Consulting Engineers 14 January 2021 JSP-SD-045 E Concrete Insitu Pile Construction 315 & 400 Diameter Reinforced prepared by Edge Consulting Engineers 9 September 2020 JSP-SD-040 E Headstock & Catwalk Connection prepared by Cardno 6 October 2010 JSP-SD-102-1 A Pile Bracket Constriction to Suit 315 Piles & 6 Roller Bracket prepared by Edge Consulting Engineers 17 September 2020 JSP-SD-206/8 A 3m wide Aluminium Deck Pontoon 5m to 12m length prepared by Edge Consulting Engineers 11 August 2021 Currency Period The Currency Period for this development approval lapses if all conditions have not been complied with, and the plan of survey lodged with Council for endorsement by 11 May 2024, unless an application to extend the currency period is approved by Council. General Conditions The maximum number of vessels that may be berthed, moored, attached or stored on the structure(s) must not exceed 2. The use of the jetty/pontoon must not cause any adverse effects on the amenity of the surrounding area including changes to light, views, air quality and noise. Vessels berthed/moored at the pontoon must be located a minimum of 1.0m from the prolongation of the property boundary of 9 Witta Cr (Lot 93 N21846) and the property boundary of 5 Witta Cr, (Lot 1 N12845). Vessels and boatlifting devices must be connected directly to the pontoon, and not located side by side or in tandem with another vessel. All structures must be designed and constructed such that they are free standing within the waterway and are not connected to or behind the revetment wall All structures must have no detrimental effects on stormwater drains and/or easements. A rigid handrail must be fitted on at least one side of the walkway. No posts or vertical supports of the proposed jetty section are to extend vertically from the structure unless they provide necessary support for the handrail. No boatlifting devices are to be attached or moored at the structure for the purpose of elevating a vessel above the water without Council approval. There must be no electrical reticulation system carrying electricity in excess of 24 volts beyond the revetment wall unless all switches and power outlets are positioned above the 1%AEP flood level. Lighting associated with the use must be designed, installed, operated, and maintained in accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting. The pontoon is to be used for private purposes only with no commercial operations to be undertaken. Boat repair activities are not permitted on site. Wastewater and sullage must only be disposed of at approved pump out facilities. The mooring facility must not be utilised for live-aboard purposes. Any construction and post construction activity is not to impact on the condition of the waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA (1994) and the Environmental Protection (Water) Policy 2009. Certification by a Registered Professional Engineer of Queensland that states that the jetty, gangway and pontoon are constructed in accordance with best practice methods and are structurally sound must be submitted to Council. This certification must be submitted to Council within three (3) months of the completion of the works. A final inspection and approval of the structure by Council’s Inspector is also required. Please contact Council’s Development Assessment Branch on 5329 6500 to arrange the inspection. This approval lapses where the construction of the jetty has not commenced within two (2) years of the date of issue of the approval, unless application is made and approved by Council for an extension. After completion, the proposed works must be maintained in a sound state of repair in accordance with the approved plans referral agencies The referral agencies applicable to this application are: Referral Status Referral Agency and Address Referral Trigger Response Concurrence SARA at DILGP SARA at DILGP Via MyDAS2 at https://prod2.dev-assess.qld.gov.au/suite/ (for assistance, contact DILGP at 5352 9701 or email:[email protected] Planning Regulation 2017 Schedule 10, Part 17 – Tidal Works or Works in a Coastal Management District The agency provided its response on 21 March 2022 (Reference No. 2202-27419 SRA). A copy of the response is attached Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: General Advisory Notes Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works. A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of the engineering design. Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent. The approval or conditions do not absolve the owner of the land from complying with all the conditions of this approval and/or relevant Council By-Laws and Policies and/or relevant statues and/or statutory regulations in the execution and/or performance of said works. Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time. Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Planning Act 2016 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees. Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act). The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Unit to discuss any obligations under the ACH Act. property notes Not applicable. VARIATION approval details Not applicable. further development permits required Not applicable. submissions Not applicable. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. OTHER DETAILS If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. Yours faithfully Mark Lewis Coordinator-Engineering Enc: Appeal Rights Referral Agency Response Approved Plans/Documents cc. [email protected] Referral Agency Response PLANNING ACT 2016 & PLANNING REGULATION 2017 Appeal Rights PLANNING ACT 2016 & PLANNING REGULATION 2017 Chapter 6 Dispute resolution Part 1 Appeal rights 229 Appeals to tribunal or P&E Court (1) Schedule 1 of the Planning Act 2016 states – (a) Matters that may be appealed to – (i) either a tribunal or the P&E Court; or (ii) only a tribunal; or (iii) only the P&E Court; and (b) The person- (i) who may appeal a matter (the appellant); and (ii) who is a respondent in an appeal of the matter; and (iii) who is a co-respondent in an appeal of the matter; and (iv) who may elect to be a co-respondent in an appeal of the matter. (2) An appellant may start an appeal within the appeal period. (3) The appeal period is – (a) for an appeal by a building advisory agency – 10 business days after a decision notice for the decision is given to the agency; or (b) for an appeal against a deemed refusal – at any time after the deemed refusal happens; or (c) for an appeal against a decision of the Minister, under chapter 7, part 4, to register premises or to renew the registration of premises – 20 business days after a notice us published under section 269(3)(a) or (4); or (d) for an appeal against an infrastructure charges notice – 20 business days after the infrastructure charges notice is given to the person; or (e) for an appeal about a deemed approval of a development application for which a decision notice has not been given – 30 business days after the applicant gives the deemed approval notice to the assessment manager; or (f) for any other appeal – 20 business days after a notice of the decision for the matter, including an enforcement notice, is given to the person. Note – See the P&E Court Act for the court’s power to extend the appeal period. (4) Each respondent and co-respondent for an appeal may be heard in the appeal. (5) If an appeal is only about a referral agency’s response, the assessment manager may apply to the tribunal or P&E Court to withdraw from the appeal. (6) To remove any doubt. It is declared that an appeal against an infrastructure charges notice must not be about- (a) the adopted charge itself; or (b) for a decision about an offset or refund- (i) the establishment cost of trunk infrastructure identified in a LGIP; or (ii) the cost of infrastructure decided using the method included in the local government’s charges resolution. 230 Notice of appeal (1) An appellant starts an appeal by lodging, with the registrar of the tribunal or P&E Court, a notice of appeal that- (a) is in the approved form; and (b) succinctly states the grounds of the appeal. (2) The notice of appeal must be accompanied by the required fee. (3) The appellant or, for an appeal to a tribunal, the registrar must, within the service period, give a copy of the notice of appeal to – (a) the respondent for the appeal; and (b) each co-respondent for the appeal; and (c) for an appeal about a development application under schedule 1, table 1, item 1 – each principal submitter for the development application; and (d) for and appeal about a change application under schedule 1, table 1, item 2 – each principal submitter for the change application; and (e) each person who may elect to become a co-respondent for the appeal, other than an eligible submitter who is not a principal submitter in an appeal under paragraph (c) or (d); and (f) for an appeal to the P&E Court – the chief executive; and (g) for an appeal to a tribunal under another Act – any other person who the registrar considers appropriate. (4) The service period is – (a) if a submitter or advice agency started the appeal in the P&E Court – 2 business days after the appeal has started; or (b) otherwise – 10 business days after the appeal is started. (5) A notice of appeal given to a person who may elect to be a co-respondent must state the effect of subsection (6). (6) A person elects to be a co-respondent by filing a notice of election, in the approved form, within 10 business days after the notice of appeal is given to the person. 231 Other appeals (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless the Supreme Court decides a decision or other matter under this Act is affected by jurisdictional error, the decision or matter is non-appealable. (2) The Judicial Review Act 1991, part 5 applies to the decision or matter to the extent it is affected by jurisdictional error. (3) A person who, but for subsection (1) could have made an application under the Judicial Review Act 1991 in relation to the decision or matter, may apply under part 4 of that Act for a statement of reasons in relation to the decision or matter. (4) In this section – decision includes- (a) conduct engaged in for the purpose of making a decision; and (b) other conduct that relates to the making of a decision; and (c) the making of a decision or failure to make a decision; and (d) a purported decision; and (e) a deemed refusal. non-appealable, for a decision or matter, means the decision or matter- (a) is final and conclusive; and (b) may not be challenged, appealed against, reviewed, quashed, set aside or called into question in any other way under the Judicial Review Act 1991 or otherwise, whether by the Supreme Court, another court, a tribunal or another entity; and (c) is not subject to any declaratory, injunctive or other order of the Supreme Court, another court, a tribunal or another entity on any ground. 232 Rules of the P&E Court (1) A person who is appealing to the P&E Court must comply with the rules of the court that apply to the appeal. (2) However, the P&E Court may hear and decide an appeal even if the person has not complied with the rules of the P&E Court [word/footer1.xml] Page 4 of 4 [word/footer2.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 4 [Attachment: image10.png (image text)] Domerad over do oor sTv9s 26 LOT NVig LA0av1 cae ont Ts NOLLWOOTIV WaLVL Y NVId BUS 1 1 1 ' TOL) WLLL Sy co uot over @ overex a : ji 2s am Vor 870M) VILL a samaaniws best [Attachment: image11.png (image text)] ee) NOOSA COUNCIL [Attachment: image3.png (image text)] Queensland Sonernment SARA reference: 220227419 SRA CCounci eference: — MCU22/0007 & OFW22/0024 ‘Applicant reference: 04014 21 Mareh 2022 Chief Executive Officer ‘Noosa Shire Council POBox 141 Tewantin Qld 4565 ‘[email protected] Attention: Mark Lewis Dear Sir/Madam, SARA response—7 Witta Circle, Noosa Heads (Referral agency response given under section 58 ofthe Planning Act 2016) ‘The development application described below was confirmed as property referred by the State Assessment and Referral Agency (SARA) on 16 February 2022. Response ‘Outcome: Referral ageney response — with conditions, Date of responce: 21 March 2022 Conaitions “The conditions in Attachment 1 must be attached to any development approval Advice: ‘Advice tothe applicants in Attachment 2 Reasons: “The reasons forthe referral agency response are in Attachment 3. Development details Description: Development permit Operational work for prescribed tidal works (pontoon) ‘SARA role: Refer Agency ‘SARA tigger: Sau 10, Pat 17, Don 3, Tele 2 tem 1 (Panning Reason ‘Tidal works or works in a coastal management district ‘South East Queensland (Nor) regional oe Hike Aer Buicng Level 3, 12 Fist ‘Averae Martyr Page 1087 POBox 1128, Maroochydore QLD 4555 [Attachment: image4.png (image text)] ‘SARA reference: Assessment Manager: ‘Street address: Real property description: ‘Applicant name: ‘Applicant contact details: Representations me27410 SRA 2202.27419 SRA ‘Noosa Shire Council ‘7 Witta Circle, Noosa Heads Lot 92 on N21846 ‘Trevor & Judith St Baker Cl. The Jetty Specialist, 118 Ron Parkinson Cres. CCorbould Park QLD 4551 [email protected] “Bn applicant may make representations fo a concurrence agency, at any tme betore the application = decided, about changing a matter in the referral agency response (s.30 Development Assessment Rules) Copies ofthe relevant provisions are in Attachment 4. ‘A copy of ths response has been sent to the applicant for their information. For further information please contact Ruth Creffild, Senior Planning Officer, on 5352 9775 or via email ‘[email protected] who will be pleased to assist. ‘Yours sincerely Mol. Manager ce Trevor Jucith St Baker, steve@tamarine com au lene Attachment 1 - Rafer ageney conditions ‘Astachmant 2-Advies tothe pplieant ‘Astachmant 3- Reasons for efaral agency response: ‘tachment 4 - Representaions provisions ‘Atachment 5 - Approved plans and specfestions ‘State Aasessment an Refer Agnoy Page 207 [Attachment: image5.png (image text)] Attachment 1—Referral agency conditions zna.a7410 SRA ‘Under section €6(1b)i) of the Planning Act 2076 the folowing conditions must ba tached to any development ‘approval eating to this application) (Copies of he plans and specications referenced below are found at ‘tachment §) No. | Conditions ‘Condition timing (Operational works ‘approval relates for the administration and enforcement of any matte relating conditions: 10.17.3.2.1 — Tidal works or works in a coastal management district - The chief executive administering the Planning Act 2016 nominates the Director-General of the Department of Transport ‘and Main Roads to be the enforcement authority forthe development to which this development to the folowing 7. ] The development must be carried out generally n accordance with the folowing plans: a) Site Pian, Layout Plan & Water Allocation, prepared by The Jetty Specialist, dated 10/02/22, reference JSP-SJ-35590, revision C. For the duration ofthe works, 2 | Allvessels, structures, plant and equipment associated with the Construction of the approved works must be timarked in accordance vith the folowing specications and requirements such that Undertaking the construction works does not cause a risk tothe safe navigation of ships: 8) any anchors deployed must be marked with yellow buoys ‘and fited with FL yellow lights fited Lighting provided must not obscure, disguise or otherwise interfere with the effectiveness of navigational lighting, While the works are occurring. 3.__ | The structure must be itimarked in accordance with the folowing ‘specifications, such that it does not cause a risk to the safe Navigation of other ships: ')Jety piles to be fitted with retro reflective tape or pedestrian ‘style lighting on pontoon Lighting provided must not obscure, disguise or otherwise interfere with the effectiveness of navigational lighting, ‘Atal times. “4 | The construction, operation or maintenance of the structure, and any ‘ship moored at this structure, must not impede the safe navigation of ‘ther ships of restrict safe access to or from neighbouring structures. ‘Atal times. ‘State Aasessment an Refer Agnoy Page Set? [Attachment: image6.png (image text)] zna.a7410 SRA Attachment 2—Advice to the applicant General advice 7. _] Terms and phrases used in this document are defined in the Planning Act 2076 its regulation or the State Development Assessment Provisions (SDAP) v6. Ifa word remains undefined it has its ordinary meaning, ‘State Aasessment an Refer Agnoy Page dof7 [Attachment: image7.png (image text)] mamea7410 SRA Attachment 3—Reasons for referral agency response (Given under secon 257) ofthe Panning Act 2076) ‘The reasons for SARAs decision are: ‘+The proposed development is for operational work for prescribed tidal work (pontoon), ‘+ The proposed development is located in a canal ‘+ SARA finds that the proposed development meets State code 7: Maritime safety ofthe State Development Assessment Provisions (SDAP), version 2.6, subject to conditions to: ‘© ensure the development is carried out generally n accordance with the plans of development submitted withthe application ‘© ensure that at all times, al ights on or above the development site do not interfere with safe navigation in surrounding waterways (© ensure the development does not adversely impact the safe navigation of other ships or safe access toffrom neighbouring structures, ‘Material used in the assessment of the application: “The development application material and submitted plans Planning Act 2016 Panning Regulation 2017 ‘SDAP, as published by SARA “The Development Assessment Rules ‘SARA DA Mapping system ‘State Aasessment an Refer Agnoy Page Sof7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Approved by Delegation of Authority MCU22 0007Related documentApplication case desk ↗
About this file
- File size
- 826 KB (small file)
- File type
- DOCX
No other editions are linked here.