Skip to the record
Accept no substitutions.

Council archive · source document

08/0201 - MCU - Duplex Dwelling to be assessed against the superseded planning scheme [As Published] · 132008.201

of 86

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997

Part A, Version 2.4, 29 May 2006

 

Land owner’s consent (if applicable)

Section 3.2.1(3) of the IPA prescribes that an

application must contain, or be supported by, the

written consent of the land owners, if the application

Unvoives:

(i) amaterial change of use;

(reconfiguration of a lot;

(10) work on land below high-water mark & not within a

§ canal as defined under the Coastal Protection and

; Management Act 1995:0r

ity ‘work on rail corridor land defined under the
Transport Infrastructure Act 1994,

Section 3.8.1(2}(a) of the PA provides that

: fandowner’s consent is pot required for a mobile or

Semporary ERA

“For more information refer to Guide 1,

20. Land owner's consent to the.imaking of this application:

eh

 

Name Signature

Date

 

 

 

 

 

 

 

i “Resource entitlement (if applicable)
Section 3.2.1(5) of the IPA requires evidence of
* resource entitiement be glven for applications that

' ' involve a prescribed State resburce.

i Section 3.2.1(10)(a)(il) of the IPA prescribes that an

: 8pplication cannot be taken to be properly made.
+ without evidence of the resource entitlement.

‘Advice for completing Q21 & 22

Refer to schedute 10 of the integrated Planning
Regulation 1996 that prescribes the nature of evidence
tequired by the State in support of the lodging of this
development apptication.

: Advice for completing Q23
The Information in (i) - (v) is mandatory if evidence is
fequired under Q22 (ii) or (lil) above,
The official stamp of the Department of Natural
Resources, Mines and Water is mandatory where the
application involves any water or riverine quarry
material under the Water Act 2000.

” Section 3,2.1(5A) allows the resource manager to limit
the time the evidence may be used. Q23 (vi) must be
completed if the evidence is time limited.

21. Does this application involve a State resource prescribed under a regulation (other than involving :
Ron on State coastal fand under the Coastal Protection and Management Act 1995)?
10 - go to Q24 [J YES - goto 022

development is consistent with an allocation o
to. Q23

Cl (ii) the chief executi executive of the department administering the resouroe
eréiititiement to, the resource — go

 
     
  
 

Satisfied the

 

C7 (iii) the chief executive ine Hees tirient administering the resource is satisfied the e
devel t-apptication may proceed in the absence of an allocation of, or

<Gilllamenttorthe-asousoe ganz

 

23. ~Evidenee-ef-the-resource-ontivement

 

(i) Resource entitlement / authority details _- (vi) Official stamp of the de; nt
administering the ses6urce (if
ya

(ii) Name of “eens officer

(iv) Signature of delegated officer

 
 
 

 

 

 

 

 

(v) Date

 

 

(vr Ex date of evidence (# applicable)

 

 

‘ Assessment triggers

| This checklist does pot apply Ifthe application requires
‘the completion of Parts A and B of the Form only. tt

24, es Assessment Checklist completed and attached to this application?
YES : (INO - the assessment manager may refuse to accept this application on the

 

 

“rust be completed for all other applications. " grounds that the application has not been property made -
\Plans / drawings / reports _ | 28. Plans/drawings/reports accompanying this application:
vane the on shai oe the nie by dete isto Pian / Drawing / Report Number Title Date

} manager, referral agencies and any person viewing
{ the application during public scrutiny or public

- Notification to understand the scope of the proposal
and any potential impact.

 

 

039-09.07 Ol¢ob PLANS

 

 

(iv)

Mn eel ELEVATIONS |.
M30- N= Of... Assermark. Ryprsk.

a al. fof

 

 

 

 

PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1,

 

OFFICE USE ONLY (applicable to assessment manager's)

 

 

 

 

DATE RECEIVING OFFICER'S ‘REFERENCE
[FEO 2550 | ane | '/tler | Maes PD) Aarne me, | miMOERS 8 /ro1 |
Notification of Engagement of Private Certifier (Optional formay”
To. Council. | have been engaged as the private certifier for the building work referred to in this application.

 

Date ofengagement: / / Accreditation Number. _— Name: Signature:

 

 

 

Used in these records

About this file

File size
5.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0201 - MCU - Duplex Dwelling to be assessed against the superseded planning scheme [As Published].pdf · 5.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.