08/0201 - MCU - Duplex Dwelling to be assessed against the superseded planning scheme [As Published] · 132008.201
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
TAKING OR INTERFERING WITH WATER; WILD RIVER AREA
4.5 | ts ap¥of the proposed operational work to allow, under the Water Act 2000. for taking or interfering with artesian water?
No
oO Yes - (Complete Form 1, Part Ky) This application requires assessment by the Department of Natural Resources and Water (NRW). if NRW is not
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
Be abe? err FB mato 32 eh ter Waves arte NOR Me ue Bde ON!
woe larrpe dvth amen ot wa'er
46 Isao o the proposed operational work to allow, under the Water Act 2000, for taking overland flow water?
No C1 Yes - Answer (a) and (b) below
{a) Are the operations mentioned as assessable development in the following?
* — Awater resource plan under the Water Act 2000 CINo = CO)Yes
* A tegulation under the IPA or another Act [LNo 01 Yes
If yes to either or both - (Complete Form 1. Part Ke). This application requires assessment by the Department of Natural Resources and Water
{NRW). if NRW is not the Assessment Manager for the application. the agency has jurisdiction as Concurrence Agency.
(b) Is any of the proposed operational work mentioned as assessable in a wild river declaration and to be carried out in a wild
tiver area declared under the Wild Rivers Act 2005?
oO No oO Yes - Depending on the purpose of the operational work and its proposed Jocation in the wild river area, assessment may be required for
the purposes of the Wild Rivers Act 2005. Also. in certain circumstances an application for operational work is taken to be not
properly made and the Assessment Manager must refuse to receive &. (Complete Form 1, Part Ksif an application is made.)
PA schvowe 8 part tane 4 ten. Fe 'P Regu'ator schedule 2 table 2 tea"h (P Reguiavon ycheduié 1 part3 cable 4 ter 2 Water Act 2000 sector 966A ‘wid river area, We'd
Rivers Act 2009 section 434,
47 sapfof the proposed operational work to allow, under the Water Act 2000, for taking or interfering with subartesian water?
No
CL Yes
If yes, are the operations mentioned as assessable development in the following?
* — Awater resource plan under the Water Act 2000 No (Yes
¢ — Areguiation under the IPA or another Act CNo O Yes
If yes to either or both- (Complete Form 1, Part K:) This application requires assessment by the Department of Natural Resources and Water
(NRW). if NRW is not the Assessment Manager far the application, the agency has jurisdiction as Concurrence Agency.
PE cue crt” tae dn, 264, JP Raguinnar sohedue 2 tate 2 nem & YH Regu “ion suveduie 1 part 2 tale ¢ tues Wate: Aut 2900 serbon 964 war iver wea Kote fe ater An's
Mier decaratinr weities tatig OF mterfenng wilh subartesian' water as assessabie, Wid River Lode Note te Code Goes tut Lue ny Gohan appuCabre pr. as.0ns for subartes a7 Weer,
48 Rewer the proposed operational work to allow, under the Water Act 2000, for interfering with overland flow water
lo Yes - Answer both (a) and (b) below
(a) Is the proposed operational work to be carried out in a wild river area declared under the Wild Rivers Act 2005?
oO Yes - Depending on the purpose of the operational work and its proposed Jocation in the wild river area, assessment may be required for the
purposes of the Wild Rivers Act 2005. Also, in cartain circumstances an application for operational work is taken to be not properly made
and the Assessment Manager must refuse to receive it. (Complete Form 1, Part Kroif an application is made.)
Ono
If no, are the operations mentioned as assessable development in the following?
« Awater resource plan under the Water Act 2000 (No Yes
« A regulation under the IPA or another Act LI No (Yes
If yes to either or both - (Complete Form 1, Part Kio) This application requires assessment by the Department of Natural Resources
and Water (NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
(b) Is the interfering with overland flow water proposed in an area declared under the Water Act 2000 to be a drainage and
embankment area (other than a wild river floodplain management area) and declared to be assessable under that Act?
oO No oO Yes - (Complete Form 1, Part Kia) This application requires assessment by the Department of Natural Resources and Water
(NRW), If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
PA sctoewe 8 pat t fae d tens Juasand ta. P Regust or scneduie 2 tabe 2 cen. $F Reguuton schedue ? pet tated ten G4 Wate Act 200 secu 9665 a dyer area,
4.9 [is the proposed operational work for the following?
e For the construction of a referable dam as defined under the Water Act 2000 pat, 0 Yes
* Toincrease the storage capacity of a referable dam by more than 10% lo OC Yes
If yes to either or both - (Complete Form 1, Part Ks) This application requires assessment by the Department of Natural Resources and Water (NRW). If NRW
Js not the. Assessment Manager for the application. the agency has jurisdiction as Concurrence Agency.
FA ee oot tebe dt nod PRequetion scteece 7 lanes ten
Page 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0201 - MCU - Duplex Dwelling to be assessed against the superseded planning scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.