Council archive · source document
08/0201 - MCU - Duplex Dwelling to be assessed against the superseded planning scheme [As Published] · 132008.201
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007 WATERWAY BARRIER WORKS; WILD RIVER AREA 4.42 sa of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994? No Yes . If yes, is any of the proposed operational work to be carried out in a wild river area declared under the Wild Rivers Act 2005? LJ No If no, is all of the operational work for constructing or raising waterway barrier works - « — intended to exist for no more than 28 days; and © built or raised in freshwater; and * no more than 20m in length and no more than 3m in height from the lowest point on the stream bed? OYes CINo If no, is all of the operational work for constructing or raising waterway barrier works - * more than 100km from the coastline; and e inthe smallest unbranched tributary of a catchment or a stream into which that tributary flows oO Yes oO No - (Complete Form 1, Part O3) This application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). if DPI&F is not the Assessment Manager for the application. the agency has jurisdiction as Concurrence Agency. Yes lf yes, is any of the proposed operational work to be carried out in a wild river high preservation area? oO No - Untess the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to receive it (Complete Form 1, Part Os) This application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). and, Subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. If OPI8F is not the Assessment Manager for the application. the agency has jurisdiction as Concurrence Agency. oO Yes - An application for the operational work would be taken fo be not properly made and the Assessment Manager must refuse to receive it. PA scnedu'e & pat t table 4 tars 6 IPA schedue & pat2 tobe 4 ten 2 'P Ragustar scheoue 2 tabie 2 tem 28 F Regularoa schedule 1 part? tame 4 vem 6 Fisheves Act 1994 secton 16D (wid uver area} Wud Rivers Act 2005 section 434 DECLARED FISH HABITAT AREA; WILD RIVER AREA 4.13 |\s any gf'the proposed operational work to be carried out completely or partly within a declared fish habitat area under the Fisheries Act 1994, . lo D Yes If yes, indicate what the operational work is reasonable necessary for (Tick applicable box/es) « — The maintenance of existing structures, including for example the following structures, if the structures Ono 0 Yes were constructed in compliance with all the requirements, under any Act, relating to a structure of that type — « Boat ramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming enclosures & weirs; « Existing powerlines or associated powerline infrastructure ¢ — Educational or research purposes relating to the fish habitat area CINo (1 Yes ¢ — Monitoring the impact of development on the declared fish habitat area [] No [J Yes © Other purposes LINo (Yes If yes to Other purposes’, is that proposed operational work to be carried out in a wild river area declared under the Wild Rivers Act 2005? oO No - (Complete Form 1, Part 0.) This application requires assessment by the Department of Primary industries and Fisheries (DPI&F). if DPI&F is not the Assessment Manager for the application, the agency will have jurisdiction as Concurrence Agency. OD Yes If yes, is alt of the proposed operational work for specified works under the Wild Rivers Act 2005? oO Y@s - Unless the application is consistent with any properly development pian applying to the land, the Assessment Manager must refuse to receive it. (Complete Form 1. Part O2} This application requires assessment by the Department of Primary industries and Fisheries (DPI&F) and assessment for the purposes of the Wild Rivers Act 2005. If DPI&F is not the Assessment Manager for the application. the agency has jurisdiction as Concurrence Agency. LNo If no, is any of the proposed operational work to be carried out in a wild river high preservation area? | No - Uniess the application is consistent with any property development plan applying to the land. the Assessment Manager must refuse to receive it. (Complete Form 1, Part Oz This application requires assessment by the Department of Primary Industries and Fisheries (DPI&F) and, subject to the declaration for the relevant wild river area. assessment for the purposes of the Wild Rivers Act 2005. If DPI&F és not the Assessment Manager for the application. the agency has jurisdiction as Concurrence Agency. o Yes - An application for the operational work would be taken to be not properly made and the assessment manager must refuse to receive the application. Hh ote eh por eae d ter” PA se edue & pate n0C eo ten FP agator sree 2 tate? tem 2h Recs, 4098 Sectors 454 Fsnenes Act sete 76DC ewld aver ave. oT Sede Lats teow dt nee Wid eye pt Page 29
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0201 - MCU - Duplex Dwelling to be assessed against the superseded planning scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.