Council archive · source document
10/0916 - Preliminary Building Approvals [As Published] · 172010.916
Caloundr Lh -) A.B.N: 46 108 575 239 a Building Approvals_ 155 Bulcock Street Caloundra QLD 4551 PO Box 135 GOLDEN BEACH QLD 4551 Phone: (07) 54914866 Fax: (07) 54914877 Email: [email protected] Supplier : Sunshine Coast Regional Council Locked Bag 72, Sunshine Coast Mail Centre, QLD 4560. Order Date: Sales Person : Purchase Order : P07163 14-07-2010 Sue Bryan ur B. A. Reference No: 00004119 Site Address : 6 36 Ross Cres SUNSHINE BEACH QLD 4567 ® me Ban Number @ Lot & Plan No: Lot Type Lot No: Plan Type Current 565 R 48112 Description Rate es Price Qty Tax % Total Coastal Protection Overlay 14-07-2040 $7214 00 1.00 » 0.00 $721.00 Purchase Amount: $721.00 GST: $0.00 Total Inc GST: $721.00 PLEASE FORWARD A TAX INVOICE/RECEIPT BY RETURN MAIL Method of Payment MasterCard Pay To: : Name on Card: Deborah K Bryan lu Ce Card No: 5163 4990 0017 6053 Expiry Date: 05/12 E & O Excepted Page I of i
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 45 pages
Page 2
Application Details - IDAS form 1
m= | | Deere ene eN ete cece
{Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
¢ complete this form (Application details - IDAS form 1)
e¢ — complete any other forms relevant to your application
. provide any mandatory supporting information identified on the forms as being required to accompany your
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.
Please note: if there is more than one applicant, provide additional applicant details by clicking the “Add another
applicant” button below.
>
Namels (individual or company name in full)
For companies, contact name
Postal address
Contact phone number
Mobile number (non-mandatory)
Fax number (non-mandatory)
e-mail address (non-mandatory)
Andrew Stewart
Caloundra Building Approvals
PO Box 135, Golden Beach, QLD., 4551
07-54914866
0439777299
07-5491 4866
[email protected]
he.natuire of development proposed? (ti
(| material change of use of premises
BX] building work
{[]_ operational work
(J) reconfiguring a lot
Page 3
{] development permit
preliminary approval
both - provide details below
Cj &l
Table B - street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises
Street Address noton pian
P Local government area
Unit | Street Street name and official Post |) ot No,| Plan type (e.g. Logan,Cairns)
No. | No. “suburb/locality name code |". ‘| and plan no.
4 36 Ross Crescent, 4567 | 565 | RP48112 | Sunshine Coast Regional
Sunshine Beach - fe +
X] Street address / lot on plan .
g Street address / lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
water e.g. jetty, pontoon) .
Table C - premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g.
channel dredging in Moreton Bay)
(Coordinates (note: place each set of . :
coordinates in a separate row) Zone Local government
- reference Datum area (If applicable)
Easting Northing | Latitude | Longitude
(J spae4
1 L] wese4
{_] other
4 Dwelling
partrnent building,:30.lot residential subdivision ett):
7; Provide a brief description of the proposal (e.9.
Dwelling Additions
Application Details - IDAS form 1
Version 1.0 18 December 2009
Page 4
OO
(J No
Yes - complete either table D, table E or table F as applicable
Table D (note: do not complete this table if lodging the application on-line using Smart eDA)
Name of owner/s of the fand lan James Gifford Martin
We, the above-mentioned owner/s of the land, consent to the making of this application.
Signature of owner/s of the land See, stood ,
Date .
Table E
Name of owner/s of the land
(J The owner's written consent is attached or will be provided separately to the assessment manager
Table F 4
Name of owner/s of the land
g By making this application, |, the applicant, declare that the owner has given written consent to the making of
the application.
9."Does the application involve.a state resource?:(e.9- the application involves state land,
2 the notes at, the end of this form forr more informatis in)
taking:quarry
No [Yes - complete table G
10. Identify If any of the following apply to the premises (tick applicable. box/es) .
{ _ adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) - complete table H
(J __ onstrategic port land under the Transport Infrastructure Act 1994 - complete table |
LJ ._ ina tidal water area - complete table J
jents on the premises?. (e.g. for, vehicular acc
{XJNo []Yes - ensure the type, location and dimension of each easement is included in the plans submitted
Application Details - IDAS form 4
Version 1.0 18 December 2009
Page 5
OI
uveNnnresel
{] Ne
&) Yes - coinplete either table D, table E or table Fas applicable
Table D (rote; do not complete this fable if lodging the application ondine using Smart eDA)
Name of owner/s of the land Jan James Gifford Martin
We, the above-mentioned owner/s of theta land, corset to the making of this application.
=,
Signature of owners of the land Mnitc.
Date 31t [Qom
Table E
Name of owner/s of the land
(CI The owner's written cansent is attached or will be provided soparately to the assessmont manager
‘rable F
Name of owner/s of the land
oO By making this application, |, the applicant, declare that the owner has given written consent to the making of
the application.
pepe tear eee ANG
Reus Topeka alt
[2] Ne (Yes - complete table G
ake ae Ta ae Tea a Cy PTET
VERTIS TS LoWenieauuy ae Bro ase Un au RIGHNS
() adjacent to a water body, watercoures or aquifer (e.g creek, Hiver, lake, carl) » complete table H
(I onstrategic port land under the Transport Infrastructure Act 1994 - complete table |
(0 __ ina tidal water area - complete table J
GaNo []Yes - ensure tha type, location and dimension of each easement is included in the plans submitted
a Roplication betelle- INAS Torm 7
. Version 1.6 18 Decembar 2009
RIT END NIT ECACAT ICL) TO *7OT aTAyTseasen
Page 6
ipplication.uride
{X] No
" [Method of jodgement to
Description of attachment or title of attachment assessment manager
Architectural Plans job no. 1005 sheets 0 - 5, 8, 9, 11, 17, 18
by onplan mail
x By making this application, | declare that all information in this application is true and correct (note: it is
unlawful to provide false or misleading information). ,
Application Details - IDAS form 1
Version 1.0 18 December 2009
Page 7
ooo. oo ; a _ - Notes for completing this form Question 8: ¢ Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is required under section 263, then an application must contain, or be accompanied by, the written consent of the owner, or include a declaration by the applicant that the owner has given written consent to the making of the application. © Owner's consent is not required for a mobile and temporary ERA. Question 9: © Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a regulation may require the application to be supported by certain evidence prescribed under the regulation. Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is required to be given, and the evidence required, to support the application. Question 13: « The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable long service leave levy is payable. . ¢ The portable long service !eave levy amount and other prescribed percentages and rates for calculating the levy e@ are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002. Question 14: * The portable long service leave levy need not be paid when the application is made, but the Building and Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development permit is issued. ¢ Building and Construction Industry Notification and Payment Forms are available from any Queensland post office or agency, on request from QLeave, or can be completed on the QLeave website at www.qleave.qid.gov. au. Fos further information gontact QLeave on 1800 803 481 or www.qleave.qid.gov.au. Privacy -the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in accordance with the processing and assessment of your application. Your personal details will not be disclosed fora purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act * 2009) or as required by Parliament. This information may be stored in a departmental database. The information collected will be retained as required by the Public Records Act 2002. OFFICE USE ONLY Date received | . Reference numbers NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER To: Council. | have been engaged as the private certifier for the . building work referred to in this application. : Date of N OS |BSA Certification [Building ame . . . engagement license number classification/s Application Details - IDAS form 1 Version 1.0 18 December 2009
Page 8
OO QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable) Description of the work QLeave Project Number Amount paid ($) Date paid Date receipted form sighted by|Name of officer who assessment __ |sighted the form manager . 1 The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This form and all other required application materials should be sent to your assessment manager and any referral agencies. Application Details - IDAS form 1 Version 1.0 18 December 2009
Page 9
Building or operational work assessable
against a planning scheme - IDAS form 6
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
This form must be completed for development applications for building works or operational work assessable against
a planning scheme. ,
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
* complete Applicant details - IDAS form 4
. complete any other forms relevant to your application
* provide any mandatory supporting information identified on the forms as being required to accompany your
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.
This form can also be used for development on strategic portland under the Transport Infrastructure Act 1994.
[XJ building work - complete table A LC operational work - complete table B
Table A
What is the nature of the building work made assessable in the planning scheme (é.g. building, repairing, altering,
underpinning, moving or demolishing a building)?
Dwelling Additions in Coastal Protection Overlay
What type of approval is being sought? (if you have indicated multiple works in the above question, please generate
another Table A to.detail each approval request)
{[] development permit [X] preliminary approval
Are there any current approvals associated with this application? (e.g. material change of use)
{J No (Yes - provide details below
2: What is the ‘dolla ‘value of the:pre joged bullding ork? (inc. GST, materials and labauir)| $ 480000. 0
Page 10
porting inform Confi rmation Method of lodgement relevant to the application of lodgement All applications for operational works site plans drawn to scale which show the following: @ the location and site area of the land to which the application relates (relevant land) the north point the boundaries of the relevant land * the allotment layout showing existing lots, any proposed lots (including the dimensions of those lots), existing or proposed road reserves, (J confirmed building envelopes and existing or proposed open space (note: : numbering is required for all lots) . any existing or proposed easements on the relevant land and their function any access limitation strips all existing and proposed roads and access points c on the relevant land a statement about how the proposed development addresses the local government's planning schemes and any other planning documents (confirmed | ’ [Applications for operational works involving earthworks (filling and excavating) drawings showing: ¢ existing and proposed contours > * areas to be cut and filled ® the location and level of any permanent survey marks or reference stations used as datum for the works e the location of any proposed retaining walls on the relevant land and their-height the defined flood level (if applicable) the defined fill level (if applicable) [confirmed Applications for operational works involving roadworks drawings showing: ° existing and proposed contours « the centreline or construction line showing chainages, bearings, offsets if the construction line is not the centreline of the road and all intersection points e information for each curve including tangent point chainages and offsets, curve radii, arc length, tangent length, superelevation (if applicable) and curve widening (if applicable) © kerb lines including kerb radii (where not parallel to centreline) and tangent point changes (where not parallel to centreline) ¢ edge of pavement where kerb is not constructed ® position and extent of channelisation location and details of all traffic signs, guideposts, guardrail and other street furniture pavement markings including details on raised pavement markers catchpit, manhole and pipeline locations . drainage details (if applicable) cross road drainage culverts (if applicable) concrete footpaths and cycle paths location and details for access points, ramps and invert crossings - changes in surfacing material " |[ | confirmed Building and operational work assessable against a planning scheme ~ IDAS form 6 Version 1.0 18 December 2009
Page 11
LIC
Confirmation
of lodgement
Method of lodgement
Applications for operational works involving stormwater drainage
drawings showing:
existing and proposed contours
drainage locations, diameters and class of pipe, open drains and
easements :
manhole location, chainage and offset or co-ordinates and inlet and
outlet invert levels
* inlet pit locations, chainage and offset or co-ordinates and invert and
kerb levels .
(|confirmed
Applications for operational works involving water reticulation
drawings showing:
¢ “kerb lines or edge of pavement where kerb is not constructed
e location and levels of other utility services where affected by water
reticulation works |
pipe diameter, type of pipe and pipe alignment
water main alignments
water supply pump station details (if applicable)
minor reservoir details (if applicable)
conduits
tocation of valves and fire hydrants
location of house connections (if applicable)
location of bench marks and reference pegs
{1 confirmed
Applications for operational works involving sewerage reticulation
drawings showing:
location of all existing and proposed services
location of all house connection branches
kerb lines or edge of pavement where kerb is not constructed
chainages
design sewer invert levels
design top of manhole levels
. type of manhole and manhole cover
pipe diameter, type of pipe and pipe alignment
location of house connections {if applicable)
sewer pump station details (if applicable)
location of all existing and proposed sewer lines and manhole locations
[jconfirmed
Applications for operational works involving street lighting
drawings showing:
tocation of all light poles and service conduits
location of all other cross road conduits
type of wattage and lighting
any traffic calming devices
additional plans for roundabouts and major roads (if applicable)
details of any variations to normal alignment
details of lighting levels
(confirmed
Building and operational work assessable against a planning scheme - IDAS form 6
Version 1.0 18 December 2009
Page 12
OO
Confirmation
of lodgement
Method of lodgement
Applications for operational works invoiving public utility services
eee
drawings showing:
any existing light poles and power poles
any existing underground services
details of proposed services :
alternation to existing services
[Jconfirmed
Applications for operational works involving landscaping works
drawings showing:
the location of proposed plant species
a plant schedule indicating common and botanical names, pot sizes
and numbers of plants
planting bed preparation details including topsoi! depth, subgrade
preparation, mulch type and depth, type of turf, pebble, paving and
garden edge
the focation and type of any existing trees to be retained
construction details of planter boxes, retaining walls and fences
the proposed maintenance period
irrigation system details
{]confirmed
Notes for completing this form:
© This form can also be used for development applications for building works or operational works assessable
against the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is
mentioned, take it to mean the land use plan for the airport land.
Privacy -please refer to your assessment manager for further details on the use of information recorded in
this form. :
OFFICE USE ONLY
Date Received Reference Numbers }
The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and
all other required application materials should be sent to your assessment manager and any referral agencies.
Building and operational work assessable against a planning scheme - IDAS form &
Version 1.0 18 December 2009
Page 13
Trish Sweeney From: Trish Sweeney Sent: Friday, 2 July 2010 5:03 PM To: ‘[email protected]’ Subject: 36 Ross Cres Hi Andrew, this application was lodged with Building Services for the relaxation and has been passed to Planning Assessment. It is ina Coastal Protection Overlay therefore needs assessment as a Preliminary Building Works application assessable against the Planning Scheme. This requires Forms 1 & 6 and the fees is $721 (pre 1 July fees). . Regards, Trish Trish Sweeney | Administration Officer Planning Assessment - North [ Tewantin Office Sunshine Coast Regional Council Ph: (07) 5449 5293 | Fax: (07) 5447 1062
Page 14
10_Edridige st, Shelly Beach QLD 4551 __
Ph: 0418 757 061
Fax: 07 54918761
Email: [email protected]
A&S Blue Date
P.O Box 1862 25-Apr-10
New Farm 4005
$84 Apis G1, SuNsttine Bercdl ~
We are about to commence renovating 36 Ross crescent Sunshine beach, for
clients lan & Jo Martin. Before we can proceed we will be requiring a relaxation of the
ront boundary. In doing so we will require permission on your behalf . You will note
from the plans provided that there would be minimal to no impact on your behalf.
Could you please review & initial the plans and when satisfied sign the document
below confirming your agreement for the changes to 36 Ross Crescent to take place.
if you require further details to this matter please contact Lindsay Woods of
Beachwood Projects on 0418757061.
Name: SUSAN Blue
Signatures: Awmagin > Woe
LINIK CONSTRUCTIONS Pty Ltd.t/as Beachwood Projects
Page 15
Sem
ee
10 Edridge st, Shelly Beach QLD 4551
Ph: 0418 757 061
Fax: 07 54918761
Email: [email protected]
Mr & Mrs Johnson Date
13 binyara St, Chapel Hill 25-Apr-10
Brisbane 4069
k 3% boy Wes. Andis bercy
@Vve are about S commence renovating 36 Ross crescent Sunshine beach, for
, ‘ee lan & Jo Martin. Before we can proceed we will be requiring a relaxation of the
ront boundary. In doing so we will require permission on your behalf . You will note
from the plans provided that there would be minimal to no impact on your behalf.
Could you please review & initial the plans and when satisfied sign the document
~,. below confirming your agreement for the changes to 36 Ross Crescent to take place.
If you require further details to this matter please contact Lindsay Woods of :
Beachwood Projects on 0418757061.
a
Name: :
Robekt Wheran Vounsow Fowy Helene Johason
Signature: HNbsod Tern Nolo.
C4 \
LINIK CONSTRUCTIONS Pty Ltd.t/as Beachwood Projects
Page 16
existing site plan
1: 200
RPD
lot 565
rp 48112
parish of weyba
county of ---
locality:
sunshine coast
regional council
area: 506m?
ja
i
a
3
8
~~
178° 10.00"
= Oo
r6s8s |
i
' |
\ 7
be \ \ S| |
\
\ ross _—_scresent .
. x
'
}
‘existing areas proposed areas
lower floor 182.81 m?| entry 4.48 m?|,
entry 4.48 m2 laundry/oath 15.99 maf.
lower patio 16.91 m? lower floor 166.90 me||
upper floor 160.34 m? lower patio 16.91 m2|}
upper patio 40,57 m? proposed alterations 117.41 mI,
tear patio 3.29 m? upper floor 55.23 m2
Grand total 408.39 m? upper north patio 18.04 m?
upper rear patio 3.29 m?}]
upper south patio 19.44 m?|
Grand total 417.68 m?
existing site cover 204.20m? (40.35%) total site cover 213.49m? (42.19%)
proposed site plan
1: 200
18 2 Se AES a
_——
i i
1000mm exposed \ , I 4
aggregate path \ -V ‘ &
around house: \ vo 7 !
Noe \ \ |
~ the 09d | \ have sal
> 4 | (
of Liat. 4
AS > *
& & south dock Ia
\ KS)
Se & § 3
2 Slo
? 2) 2
2
2/3
1285545. 2/3
1 . é
\ 6649 178° 1000"
\ 16886 |
Rew exposed aggrogate ,
concrete driveway to replace
existing
{
ross _—cresent .
general notes *
1. Figured dimensions take preceden
2. All work to comply with BCA, QLD Building Act and Local Authority Regulations.
3. Site to be cut and filled in accordance ith Geotechnical Engineers specifications. all
levels to be confirmed on site proir to construction.
4. Excavations to be in accordance with BCA 3.1.1 and Engineers design.
5. Drainage work to comply with Geotechnical Engineers recommendations and the
Siructural Engineers details. Ap
6. All timber framing to comply with AS 1684.2.
7. All plumbing and drainage work to be carried out in accordance with AS/NZS 3500 and
Council Regulations. i
8. All earthworks , footings and slabs in ac€ordance with Engineers design and details.
9. Termite protection to AS 3660-1. (Termimesh or equal)
10. Driveway and crossovers to be in accordance with Councils standard drawing details.
11. Consulting engineers details and specifications are to take precedence over these
drawings.
12. Landscape works to be confirmed by client
er scaled dimensions.
ADocuments end Setings Vanity DocumentsWORK PROJEGTSonptan 20011005 marimit005 marin 3.04}
; /
DESIGN DRAFTING onplan pty Itd clam revisions (dato drawn by sheet name »Y
Pp Pp y A concept 14/02/10 april 2010 im A . tf site lans
PAUL CURRIE 0413 998 089 fax 5491 8389 i i i B concept revision 08/09/10 aoa honk not tor
IAN McKINVEN 0411 524 530 fax 5446 22 ian & jo martin c 21/03/10 ep no. sheet i} | | | construction ple
[email protected] [email protected] o 19/04/10 1005, a purposes issue
box 215, motfat beach qld 4551 . 7 .
ee roa) Z 36-ross-cresent, sunshine_beach.. - scale (89) preliminary
www.onpian.com.au L acn 125 105 928 abn 33 658 335 908 ) y J 12042010 10:30:47 PM _) \ 1: 200 > \ iv) 7 . ; S
q
Page 17
a“
a
a
a
a
1812 aw,
a“
1812 aw,
t
a
1812 aw.
bedroom 4
games room
jower patio
bathroom
TT
2426 pane! lit
612 aw
Bi2aw
612 ew
garage
2730 panel it
— a
{ existing areas
t lower floor 182.81 m?!
entry 4.48 m?|
, lower patio 16.91 m?|
{ upper floor 160.34 m?
i upper patio 40.57 m2
4 rear patio 3.29 m2?
Grand total 408.39 m?
a
3
|
CaDocuments and SetlingstlaniMy Documents\WORK PAQJECTSionptan'20 1011 005 mestin\ 4008 martin 3.rvt
~
DESIGN DRAFTING
www.onplan.com.au
onplan pty ltd
PAUL CURRIE 0413 998 089 tax 5491 8389
IAN McKINVEN 0411 524 530 fax 5446 2214
[email protected] [email protected]
absa 1123230
acn 125 105 928 abn 33 658 335 908
client
ian & jo martin
{
36 ross cresent, sunshine beach.
4
revisions date | drawn by ame *)
oo cavare | | ye = existing lower
D petty rovison varo410 1005 b construction | |
scale (a3) initial “| purposes +e
L spowror0 048M | (° 1:100 J (" J lt preliminary J
sheet n:
i '
sheet no., { not for
Page 18
XW
1206 aw
bathroom
bedroom 2
ensuite
fireplace
720 cav.sd
master bedroom
dining
t
upper patio
1506 aw
bedroom 3
1506 aw
1218 aw
eee ae
CADocuments and Setlingstlen\My Documents\WORK PROMECTSionplan2010\1005 martin 1005 martin 3.04
/
a
— ~
( j revisions date drawn by sheet name
DESIGN DRAFTING onplan pty ltd client A concept 11/0210 april 2010 im isti
PAUL CURRIE 0413 998 089 fax 5491 8389 ian & jo martin B concept revision 08/03/10 oon. Shoot no. not for existing upper
1AN McKINVEN 0411 524 530 fax 5446 2214 C preiminary 217030 1005 c construction
[email protected] [email protected] D preliminary revision wwosta | | +|-|—purpeses issue,
— <cOomm.au | [Pe bor?5: olla seeras551 36 ross cresent, sunshine beach. seat (eS) 0 ["" | J J L preliminary
\ www.onplan.com.au cn 125 105 928 abn 33 658 335 908 42R472010 10.20.49 PM : . _/
\
Page 19
2400 1: 100 1: 100 + | upper oor 24.40 m — = = “Ghagin 220m existing north CADecuments and Setinge¥en'My DocumentstWOAK PROJECTStonplan\ZO10it O05 marin\t005 marta 3.4} 1: 100 2 — — - revisions date drawn by f sheet name onplan pty Itd ( client A concept 4102/10 april 2010 im ‘ - . . PAUL CURRIE 0413 998 089 fax 5491 8389 ian & jo martin B concept revision ssoao | | not for existing elevations IAN McKINVEN 0411 524 530 fax 5446 2214 J C preliminary avoano | | iP no sheot mf construction _ [email protected] [email protected] 9 preliminary revision 1aoana 1005 dq —]| — po box 2157 motfat beach gid 4551 qbsa 1123230 aon 125 105 928 abn 33 658 335 908 J 36 ross cresent, sunshine beach. 12042016 10:30:57 PM Jt cale (a3) 1: 100 J [“" | [ern ~~ preliminary
Page 20
ee
bedroom 4
bathvlaundry
SS
games room
Te
Ny
es ———
garage
7
| |
a
LG, a
CADocuments and Setings VaniMy Documents WORK PROJECTSionplan\201i1005 martin\1005 matin 3.rvt
ve
|
|
|
|
XY
( on DRAFTING onplan pty ltd client revisions date ‘) drawn oy) sheet name »
p Pp ly A concept 11/02/10 april 2010 {
PAUL CURRIE 0413 998 089 fax 5491 8389 ian & jo martin B concept revision oseano } | Shoct no? not for proposed lower
JAN McKINVEN 0411 524 530 fax 5446 2214 © preliminary 2voa'io ren. 4005 e { construction OO
[email protected] [email protected] : © preliminary revision 13/040 | rareses issue.
Comm.au | | PoPor216: mots ogerraaassr 36 ross cresent, sunshine beach. seale (a3) ii iy preliminary
\ www.onplan.com.au aon 125 105 928 abn 33 658 335 908 4 1249472010 10:30:58 PM 1: /f a
Page 21
2. all skirting 93 x 19 pine painted
3. all louvres to be white aluminium blades
a “ 2 as , bedroom 3 i
a 4 | I
\
\
_
a , J { bedroom 2 (
Z
commarical hood over
=
—_—
x
build ou! pantry,
hood & ref to
TEST
C2700 tu jan ror mat i
\ c 2 \ .
V3 > z master bedroom a \
1 Br
fixed aluminium
Z Laas ZF / louvre panels
\ Y p26 stockors bene’
4 1 | seat
‘ 4 north deck © |
rae
+) 4
tN hb — comm i
; ] B | . . { it galvanised shs |,
Ss . sliding aluminium {
| sail aver q touvre panel
sail over \
| .
=o (TO TS “ei iE r eT — - = $4) i
~~~. | ato utnjoin_ 2709. _ 2 7ay | Z0oW,_ 27091. __2700butt join | _. custom handrail & stainless balustrade
south deck
en ‘ |
custom handrail & stainless balustrade hy
se =
CADocuments and Setings¥anMy Oocuments\WORK PROJECTSionplan'201011 005 matis005 martin 3.1vt
Ne
DESIGN DRAFTING onplan pty ltd client ‘ revisions date drawn by" sheet namo
PAUL CURRIE 0413 998 089 fax 5491 8389 i j i 3 concopt oanane apie m4 t f roposed upper
jax B t revision 8/03/10 ial + not for
IAN McKINVEN 0411 524 530 fax 5446 2214 ian & Jo martin : c prolninary 21/03/10 pene. sheet re: construction prop PP
[email protected] [email protected] : D pretiminary revision 19/0410 1005 ty purposes Issue.
| po box 218; mottat beach'qid 4551 . intial ~~ ] 1s
-com.au oan 1123200 36 ross cresent, sunshine beach. scale (23) mm | preliminary
www.onptan.com.au acn 125 105 928 abn 33 658 335 908 _J s2~042010 1031:01 PM 1: 100
Page 22
roposed front 1:100 proposed south 1:100 XX ( DESIGN DRAFTING onplan pty Itd PAUL CURRIE 0413 998 089 fax 5491 8389 LAN McKINVEN 0411 524 530 fax 5446 2214 [email protected] [email protected] client ian & jo mart conm-au tT www.onplan.com.au onolan Po-box 215, mofal beach aid 45511 _ 36 ross Cresent, SUNS acn 125 105 928 abn 33 658 335 908 in proposed north 1: 100 CADecuments and Settingsitan My Documents\WORK PROVECTSIonpIani20 1011005 marin O05 mario sxlon.At hine beach: revisions date drawn oy sheet name *) Bconeoptrviion oata® ope ssh not for proposed elevations © protiminary 2108/0 job no. sheet no. construction . O preliminary revision 130410 1005 g — purposes _ issue —_ : scale (a3) initial relimina L 1504/2010 8:33:57 PM } 1:100 J " U | L Pp ry _
Page 23
ee ee EE ae nega | TE
CADecuments and Settingstiamiy Documents\WORK PROJECTSanptan201011006 martinit005 martin skint)
eee NR
pa a eee
purposes.
DESIGN DRAFTING onplan pty Itd ofient ] A. concep revisions svar oe antl so10 sheet name
PAUL CURRIE 0413 998 089 fax 5491 8389 i j i t B isi 08/02/10 oo n i
IAN McKINVEN 0411 524 830 fax 5446 2214 ian & jo martin , c win pucano | | Beno. cont tion perspectives
[email protected] [email protected] ° imi 19/04/10 1005
coma || ee 36 ross cresent, sunshine beach.
acn 125 105 926 abn 33 658 335 908
scale (a3)
www.onpian.com.au
preliminary
1504/2010 9:34:04 PM
Page 24
wee ore = x pecan, Se — APPEL DESIGN DRAFTING onpla onplan pty ltd PAUL CURRIE 0413 998 089 fax 5491 8389 (AN McKINVEN 0411 524 530 fax $446 2214 [email protected] [email protected] www, yonplan. com.au acn 125 105928 abn 33 658 335 908 la! aur]_| —setne2is, matat each 5|—|_| 36 rose cresent, sunshine beach. 5 CADocuments and Settingstlan'My Documenns WORK PROJECTStonpian201031006 martin\t 006 martin skifior. vt client revisions a drawn by, A concept im 4 . ian & jo martin 8 srott vn 3d view D_ preliminary revision 15/04/2010 9:34:12 PM scale (a3) date 1102/10 april 2010 08/09/10 ‘ob 21/03/10 job no. 13/04/10 1005 sheet name sheet no. not for j ] construction | |= _—purposes__| issue initial 4 preliminary
Page 25
@
------ upper ceiling 26.80. x7
upper floor_ 24.40 m
Relig Ma 2820
section a
1100
section b
1:100
2400 ceiling
|
2700 ceiling
Spa e
|
_. upper floor 24.40 m
— Bhiag ti. 220m “S
‘GADocuments and Senings\laniMy DocumentsWORK PROJECTStonptani201 013005 mertin\i005 martin 3.11
www.onplan.com.au
gbsa 1123230
acn 125 105 $28 abn 33 658 335 908
J
\
36 ross cresent, sunshine beach.
nN
1204/2010 10:31:13 PM
J
scale (a3)
1: 100
J
\“"
ees Pe |
.
ou
1
'
1
t
i
DESIGN DRAFTI 1 t Itd client revisions date drawn by’ sheet name
ING onpian ply A concept 11/02/10 april 2010 im | “
PAUL GURRIE 0413 998 089 fax 5491 8389 ian & jo martin 8 concept revision 08/03/10 ebro Trost no! not for sections
IAN McKINVEN 0411 524 530 fax 5446 2214 © protiminary auoano | | Pre h | construction
[email protected] [email protected] D preliminary revision 13/04/10 1005 -|—purposes— sua.
“COM 2) -|——po box-215; moffat beach gid 4551
preliminary
Page 26
existing areas
~
=
6
g
é
t lower floor 182.81 m2? g
| entry 4.48 m? 3
i lower patio 16.91 m2 g
= : upper floor 160.34 m2 z
aA. ' upper patio 40.57 m2? 8
— rear patio 3.29 m? é
’ Grand total 408.39 m? ;
:
\ proposed areas 3
i entry 4.48 m? 5
' laundry/bath 15.99 m? a
. lower floor 166.90 m? 3
see meee 1 lower patio 16.91 m? %
lower floor: proposed alterations 117.41 m2 :
il 66.90 m2 | qi upper floor _ 55.23 m?' 2
- i) upper north patio 18.04 m? é
2 upper rear patio 3.29 m2 g
. upper south patio 19.44 m? °
t Grand total 417.68 m?
1
lower floor y @
'
1: 150 |
I
j
. i]
j i
: 1
yy
upper rear patio :
3.29 m?
1 +
\
upper floor |
1: 150
| |
i it
DESIGN DRAFTING onplan pty Itd client 7 revisions date shoot name ~»)
PAUL CURRIE 0413 998 089 fax 5491 8389 ian &j i ® 3 conopt canara april 2010 im ot f area plans
fax B concept revision 08/03/10 oo i not for
IAN McKINVEN 0411 524 530 fax 5446 2214 ian & Jo martin | C preliminary 21/0310 job no. 4005 mee construction __area plans
[email protected] [email protected] © preliminary revision 1304/10 _ -|-|—purposes—|- “ _
.cOm.au Fe ne toe eet 36 ross cresent, sunshine beach. scale (69) inital reliminar
\. www.onplan.com.au aon 125 105 928 abn 33 658 335 908 fi J 12042010 10:31:90 PM 1: 150 p y
t 13% SS
|
|
Page 27
__ : $ l} PE ps FD oo Building Approvals— ‘ 155 Bulcock Street 4 SCRC CORRESPONDENCE ‘ Caloundra QUD 4551 Ley At _ $0058526 Phone: (07) 54914866 Fax: (07) 54914877 Email: [email protected] A.B.N: 46 108 575 239 Supplier : Sunshine Coast Regional Council Locked Bag 72, Sunshine Coast Mail Centre, QLD 4560 Purchase Order: 07116 Order Date : 29-06-2010 Sales Person : Andrew Stewart & 6 Our B. A. Reference No; 90004119 Site Address ; 36 Ross Cres @ SUNSHINE BEACH QLD 4567 . G Lot & Plan No: Lot Type Lot No: Plan TN lan Number 48112 Current $65 Ri Description S Price Relaxation 29-04-21 $410.00 3.0 JUN 2010 Maranehyvdara Witt omar = L__——Pychase Amount; $410.00 GST: $0.00 Total Inc GST: $410.00 PLEASE FORWARD A TAX INVOICE/RECEIPT BY RETURN MAIL Method of Payment Visa Pay To: Name on Card: Andrew Stewart Mf Card No: 5163 4990 0017 6053 \ Expiry Date: 05/12 E & O Excepted : Page | of 1
Page 28
. imo
Sunshine Coast Teeth Avon Caloundra Open Sect Tewantn
i i PO Box 117, Caloundra QLD 4551 PO Box 141, Tewantin QLD 4565
Regional Council 75420 8611 F 5420 8622 5449 5260 F 5447 1062
Maroochydore Office Nambour Office
.] 11-13 Ocean Street, Maroochydore Cnr Currie & Bury Streets, Nambour
y PO Box 76, Nambour QLD 4560 PO Box 76, Nambour QLD 4560
T 5475 8501 F 5441 8338 T 5475 8501 F 5441 8338
REQUEST FOR REFERRAL AGENCY RESPONSE FOR BUILDING WORK
Property Description
Address: 36 Ross Crescent, Sunshine Beach
Postcode: 4567 [Lot No.:565 Plan No.: RP 48112
Assessment Manager Building Development Application No.
[ CALOUNDRA BUILDING APPROVALS | [4119 |
Contact Person Phone
| Andrew Stewart | 07-54914866 ]
Postal Address
PO Box 135
Golden Beach | Postcode: 4551
Request type
O For development on a local heritage place
The following—
(a) IDAS code in the Queensiand Heritage Regulation 2003, schedule 2;
(b) the relevant provision of any planning scheme
O Amenity and aesthetic impact of particular building work
Building work for a building or structure if it is—
(a) a single detached class 1 building or a class 10 building or structure; and
(b) in a locality and of a form for which the local govemment has, by resolution, declared that the form may—
{i) have an extremely adverse effect on the amenity, or likely amenity, of the locality; or
(il) be in extreme conflict with the character of the locality.
0 Whether particular buildings may be occupied for residential purposes
Building work for a building, other than a class 1,2, 3 or 4 building, for residential purposes,
v Design and siting
if—
(a) the Queensland Development Code, part 1.1 or 1.2 applies for building work; and
(b) under the part, the proposed building or structure does not include an acceptable solution for a relevant performance
¢riteria under the part
it—
{a) under the Building Act 1975, section 33, an altemative provision applies for the building work; and
(b) under the provision, the proposed building or structure is not of the quantifiable standard for a relevant qualitative
Statement under the provision
t—
(a) under the Building Regulation 2006, section 10, a planning scheme makes a provision about a matter provided for under
performance criteria 4, 5, 7, 8 or 9 of the Queensiand Development Code, part 1.1 or 1.2; and
(b) the provision applies for building work; and
(c) under the provision, the proposed building or structure is not of the quantifiable standard for a relevant qualitative
statement under the provision
O Fire safety in particular budget accommodation buildings
Building work required to ensure a building complies, under the Building Act 1975, section 220 with the fire safety standard
under that Act
C1 Higher risk personal appearance services
Building work if—
(a) the Queensland Development Code, part 5.2, applies to the work; and
(b) the work does not comply with an acceptable solution stated in the part.
O Building work for residential service
Building work for premises in which a residential service under the Residential Services (Accreditation) Act 2002, Section 4, is
conducted, or is proposed to be conducted,
0 Building work relating to removal or rebuilding
Whether the local goverment requires security and the amount and form of security.
Page 1
\\server\CompanyShare\AndrewsDocs\Desktop\Relaxation Applications\36 Ross Crescent, Sunshine Beach.doc 9
Page 29
Description of Proposal To construct a dwelling on a corner allotment with setback to front street being 4.508m minimum To Ross Crescent, and side setback of 1.807m at a height of approximately 6.0m to the northern side boundary. Vite hae oo ye: oe The reasons for and justification of this request (eg how the proposal complies with the performance criteria) 1. The site is 506m2 in area and falling to the street, and has a wedge shaped configuration. 2. The existing dwelling has a street frontage setback of 6.008m minimum at present. 3._ The owner is wanting to carry out extensive renovation to the existing aged dwelling and extend the front of the dwelling to provide a usable deck and living area, in the direction of views. The existing siting of the dwelling restricts the area on site for additions to be to the frontage only and the minimal size of the addition is considered reasonable with the site coverage only 42%. 4. The Noosa Shire Plan has performance criteria that requires siting provisions be attractive and consistent with the character requirements of the neighbourhood, retain natural landscape and provide high levels of amenity, safety and security. 5. The proposed siting is consistent with the character of the area and the renovation will provide a greater amenity and upgrade the local values of the area. 6. Other corner sites in the locality have varying setbacks such that the proposal will not look dissimilar in distance from the front boundary, and the corner siting further limits the intrusion. 7. The adjoining dwellings will have very minimal effect from the proposal and views and outlooks should not be effected. Both adjoining dwellings do not outlook towards _the proposal and both owners have provided letters of agreeance to the additions. 8. The proposal wilt not be of a bulk to be unacceptable to the streetscape and will provide no decrease in safety or security to the occupants. 9. The size and bulk of the building will be in keeping with the area. 10. Light and ventilation to adjoining dwellings will not be compromised. It is considered that the dwelling siting meets the performance criteria of the Noosa Shire Plan and the adjoining neighbours have provided letters of support. Please enclose the following documentation with request: Three (3) copies of plans, current title search and any other material relied upon in support of the submission. Plan/Drawing/Report Number Title Date job no. 1005 sheets 0 — 5, 8, 9, 11, 17, 18 Existing & Proposed Site Plan, | April 2010 Floor Plan & Elevations, by onplan Perspectives NOTE: This request is accepted on the basis that the proposed development is not inconsistent with earlier development approvals or with other aspects of the planning scheme (not the subject of this request) Office Use Only Date Received | Receiving Officer Reference Number : (D# Receipt Number | Fee | Comments Page 2 \\serveACompanyShare\AndrewsDocs\Desktop\Relaxation Applications\36 Ross Crescent, Sunshine Beach.doc 9
Page 30
CURRENT-TFFLE- SEARCH
OF
. ENVIRONMENT AND RESOURCE MANAGEMENT, QUEENSLAND
Request No; 9117106
Search Date: 29/04/2010 14:41 Title Reference: 12363161
Date Created: 15/10/1947
Previous Title: 11955054
REGISTERED OWNER
Dealing No: 711795456 16/07/2008
IAN JAMES GIFFORD MARTIN
ESTATE AND LAND
Estate in Fee Simple
LOT 565 REGISTERED PLAN 48112
County of MARCH Parish of WEYBA
Local Government: SUNSHINE COAST
BASEMENTS, ENCUMBRANCES AND INTERESTS
1. Rights and interests reserved to the Crown by
Deed of Grant No. 11805207 (POR 28)
2. MORTGAGE No 711795458 16/07/2008 at 09:36
WESTPAC BANKING CORPORATION A.8.N, 33 007 457 141
3. MORTGAGE No 711856384 13/08/2008 at 15:18
JOHN WILLIAM KRIMMER
ADMINISTRATIVE ADVICES - NIL
UNREGISTERED DEALINGS - NIL
CERTIFICATE OF TITLE ISSUED - No
Caution - Charges do not necessarily appear in order of priority
** End of Current Title Search **
COPYRIGHT THE STATE OF QUEENSLAND (ENVIRONMENT AND RESOURCE MANAGEMENT) {2010}
Requested By: D APPLICATIONS CITEC CONFIRM
Page 1/1
Page 31
Transmittal Document - 30/6/10
{Sunshine Coast -
Council
Sy New Item |Cededit Item | Alert Me
Reference Number TFR-GW0630M
Date: 30/6/10 ,
To: Tewantin
Section: (Extasy
From: Maroochydore
e@ Section DASP Counter
Officers Full Name: Glenys Ward
Actions (If Relevant): Please receipt at Processing Office
Payment Method: Credit Card Authority
Total Amount $: 410.00
Details of Document Fwd: RAB for 36 Ross Cres Sunshine Beach lot 565 RP48112
Signature of Council
Officer:
Created at 30/06/2010 9:16 AM by MSC\GZW
Last modified at 30/06/2010 9:16 AM by MSC\GZW
Close
http://scrcintranet/custserv/Lists/Transmittal%20Document/ DispForm.aspx?ID=3605&Source=http%3... 30/06/2010
Page 32
Transmittal Document - 30/6/10 Page 2 of 2 http://sercintranet/custserv/Lists/Transmittal%20Documenv/DispF orm.aspx?ID=3605&Source=http%3... 30/06/2010
Page 33
; eo
ae ot ro
pay qa PS
SHE cas lL tty e Mu 2
(cas f i ; Ag <8
<a ne , = PR
a Ngo (PATHWAY) _ Pe zu g i
HE Gap KL. “Ba moe pes Pees Bel:
%OF55 ale Se i
> . SA? a 1
. =z
un " 3 vf
roP Sey.
nn ~~ :
' Lue & | SS vi
a Nt = t | 2 ‘
Ro 8 |; | =};
‘23 he* :
Po. BB,
RS a 15 ‘ cee
ey :
j i
a L
a ‘
THWAY) g :
J cern Rg See8 S3al)
e739" . . . . :
(i 2HmE Bz ab |
wn a < oO}:
3f PRES Bssl
) SP=z | Mz<e 8h {
* “ans Pa 2oP
uy Monod es “9
: rSSa x Ro
5 -eer {Q4 a7
S aa BLez mill!
g Fe SRaa <ll
= Au
in in tgs | BS
g@ gig | gee ER
YF 9
75 32 Lae eh
&@ Sig Sizer Si
Ss 2 8 8o Bel,
2 ; Ppa >Hi
~~ 7 i VW
|
\
% =
a, :
23 gy :
3¢ as :
Sig 8 :
Se as i.
“eg |
is S :
FRR
tz |
> 3* z
si Be OF
~~ zs
He $3 . :
Bi» Sz 8 by
3 Rs & 1
as ae OF |
23 Sx ui
3“ 38 :
2 BE
Re
F
1132578"
Page 34
L 36 ross cresent, sunshine beach CADocuments and Setiings\ianiMy Documents\WORK PROJECTSionplach201 0.1005 martin\l005 marin skiOn.nvt } X a revisions date drawn by sheet name DESIGN DRAFTING onplan pty ltd cent A concopt 112110 april 2010 im . PAUL CURRIE 0413 998 089 fax 5491 8389 ian & jo martin 8 _conceptrrevislon oansio | | Shona issued for cover an J c 2103/1 job no. sheet no. IAN MCKINVEN 0411 526 630 fax 5446 2214 6 brsiminary cube 4005 0 construction ° [email protected] au [email protected] E a revision a1aio ——_—. purposes tesue a — * - "215, 4 . — +] —- = -— —_ - , ; -4 ~ . <= - — iy scom.au} | PP0r?10, neiwmee 36 ross Cresent, sunshine beach. ef fesatoteay fp fintuas PP approval: [email protected] aon 125 105 928 abn 33 658 335 908 90/04/2010 6:12:49 PM a:4 '
Page 35
~
_
~
. ,
w ws 2
_ P|
g
Ss
Tr 1918 |
| g | 8 i
8 2 Bs
g \5 i # {5 4
‘ |
. \
ud / \ % 016 \ y \ °
\ \ \
‘ \ 1000 ed |
i / \ aggregate path \. p= - ° ! i
/ & \ around house ‘\ s i \
pa freed : ‘ shade eal | 1 shade at
. aN Loe |
° 1807 7 south da 7] 1807 |
/ = existing
2 | , ' . 3 j . |
: 2/28 :
; 8 Ae
~~ |
178° 10'.0' ™478° 10' 00"
ress. | . i ‘ese Panes
+
exposed \t0
| cae
existing
| |
. !
og . ! . 4 . t '
existing site plan aan \ proposed site plan = ''-~, \
7 ‘ N
. N ‘.
1: 200 ~N ross__cresent \. 1:200 \. ross__cresent \
Ny \ . \ . \
RPD existing areas proposed areas t general notes
. lower floor 182.81 m2 entry 7.48 me : 1. Figured dimensions take precedence over scaled dimensions.
lot 565 entry 4.48 m2 laundyibath 15.69 m? 2. All work to comply with BCA, QLD Building Act and Local Authority Regulations.
lowar patio 16.91 m2 jl > 3. Site to be cut and filled in accordance with Geotechnical Engineers specifications. All
ro 48112 - lower floor 166.90 mi levels to be confirmed on site proir to construction.
arish of weyb upper floor 160.34 m? lower patio 16.91 m? 4. Excavations to be in accordance with BCA 3.1.1 and Engineers design.
p f yba upper patio 40.57 m?| upper floor 172.72 me 5. Drainage work to comply with Geotechnical Engineers recommendations and the
county of --- rear patio 3.29 m@ ipoernorth patio 18.04 mi Structural Engineers details.
locality: Grand total 408.50 mt pp or ella 6. All timber framing to comply with AS 1684.2.
: . upper rear pal io 3.29 mi 7. All plumbing and drainage work to be carried out in accordance with AS/NZS 3500 and
sunshine coast upper sauth patio 19.44 m2 Council Regulations.
regional council : Grand total 417.76 m2 . 8. All earthworks , footings and slabs in accordance with Engineers design and details.
area: 506m? 4 9. Termite protection to AS 3660-1. (Termimesh or equal)
. i 10. Driveway and crossovers to be in accordance with Councils standard drawing details.
existing site cover _204.20m? (40.35%) total site cover 213. gm? ( 42.19%) a woe engineers details and specifications are to take precedence over these
OT "| ‘ 12. Landscape works to be confirmed by client
\ \
. i. 1
i nplan client 1 revisions date ‘drawn bi hoot name
PAUL connie oe Ose 8389 i ‘ot i i 8 caato serie “in _ it I
fax 8 t revisor 08/09/10 a ——_—
JAN McKINVEN 0411 524 530 fax 5446 2214 ian & Jo martin c protminary " 21/08/10 job no. sheet no. issiied for Site plans
[email protected] [email protected] D preliminary revision sadn 1005 1 { oo) in ruction issue ,
= | , y Aetens jE mova) BIO = __
eee 36 ross cresent, sunshine beach. eee — Sete amar — a purposes Approval
wi Wwww.onplan.com.au aon 125 105 928 abn 33 658 335 808 i 3004/2010 5:1250 PM 1: 200 J) ( Pp
|
Page 36
XN
2606 aw 0606 aw
: bedroom 4)
lower patio
2426 panel itt
existing areas
lower floor 182.81 m?|
entry 4.48 m?|
lower patio 16.91 m2
upper floor 160.34 m?
upper patio 40.57 m?|
rear patio 3.29 m?
Grand total 408.39 m?
_—
O12 aw
eam —
2730 panet tit
"
\.
DESIGN DRAFTING 2
rr Bs
&
.conrauy
www.onplan.com.au
«
onplan pty Itd
PAUL CURRIE 0413 996 089 fax 5491 8389
TAN McKINVEN 0411 524 530 fax 5446 2214
[email protected] [email protected]
|| ——po.box 215, moifat-beach.qid-4551.
qhsa 1123230
acn 125 105.828 abn 93 658 335 908
client
ian & jo martin
CADocuments and Settings\lentMty Documents\WORK PROJECTS onrptarh2010 1005 marti1005 martin skint}
7 36 ross cresent, sunshine beach. -
30/04/2010 5:12:51 PM
| reaieea y “inital : j [ J ( approval
_/
revisions date drawn by sheet name )
A concept 11020 ril 2010 im Ceti
concept revision canara | | SP | issued for existing lower
C preliminary 210310 * .
D_ preliminary revision 13/04/10 1005 2 construction issue
E_approval 31/040 purposes _
Page 37
head
- | bedroom 2
pe
bathroom
106 ew = 1506 aw
ADocuments and Setingstiartity DocumenstWVORK PROJECTSanplant 2011005 martht00s mastn skint}
upper patio i
4
‘ J
DESIGN DRAFTING onplan pty Itd tient A revisions date drawn by sheet name »
PAUL CURRIE 0413 998 089 fax 5491 8389 ia i i concent i Sie april 2010 im
IAN McKINVEN 0411 524 530 fax 5446 2214 ian & Jo martin é petra, ‘sen oynato job no. sheet no. issued for existi _existing upper upper
Pepoben 218, mala beaeh SSS OO D_pretminay evison taparo 1005 ay | | construction | | ave
—| ——po.box. motiat. qld 4551. ef _ _ ee . _ E_ approval 3104/10 7 urpose:
——————cornay ese 1123230 36 ross cresent, sunshine beach: -|-seato-ea) -| nite purp ] |
www.onplan.com.au aon 125 105 928 abn 39 658 335 908 i onss2010 6:12:52 PM J 1: 100 JL approva J
4
4
t
Page 38
sz 24.40. _upper foot
i
existing south
CADocuments end Setingsttartity DooumantsWORK PROSECTSonptarh201 1006 martrAt O06 marin skiTonvt }
ro a te ,
PRAY SKN ENS,
, Ie VP NRO
BRR RLS L
existing north
4
‘
1: 100 12100
\ f <
3
. . ~
{f. DESIGN DRAFTING onplan pty Itd oitent . : A cancopt revisions sanano on orl 2010 rawn ey sheet name . .
gg 5, | JPAUL CURRIE 0413 998 089 fax S401 8389 ian & jo martin , B concept revision oeaeig | | jobro. sheet no. issued for existing elevations
a . J E al 31/04/10 _ |
a] | ne — | 36 ross cresent, sunshine beach: — seale es) pew approval
J L non 125 105 928 abn 39 658 335 908 t L sow eisco Pet 1: 100 ‘ ~
Page 39
CADocuments end Settings\izrty DocunentsWORK PROJECTS\onplerh201 Ik 1006 martin DOS martin ekilion.ret )
rear of games room
it!
entry foyer laundry upper roof structure
\
/
rc
DESIGN DRAFTING onplan pty Itd alient : 2 vsIOns ue ) {eo 2010 drawn by sheet name »
PAUL CURRIE 0413 998 089 fax 5491 8389 j j i _Bpril 2010, im isting i
IAN BcKINVEN 0411 524 530 fax Saas 2014 ian & jo martin job ho. chestne” Issued for existing images
[email protected] [email protected] 1005 5 construction —
coos _—— 0 box 215, moffat beach qld 4551 j—_ eee, —; ehinah;, 4 _- —— a —~ fe see _ -
rcom.aus ina 23000 36 ross cresent, sunshine beach. scale 62) ina purposes i
Si www.onplan.com.au aon 125 105928 abn 33 658 335 908 i sa42010 6:13:02 PM approva >)
{
Page 40
ee! x oe 3411 + CxDocuments end SettrgeartiMly DocumientsiWOAK PROJECTStonplark20 11005 marthii005 marth skilion.rt 7 2400 site measure required : entry door \ ' 1:50 \ aN | \ i NS. \ _/ ( DESIGN DRAFTING onplan pty Itd drawn by sheet name ) S hy, PAUL CURRIE 0413 998 089 fax 5491 8389 i j i i f r lower : c OR IAN McKINVEN 0411 524590 fac seas 224 ian & jo martin sheet no, cota P oposed o i a ei [email protected] [email protected] ‘ Preliminary revision * purposes issue =COM a | ene a eo ae 36-ross-cresent; sunshine-beac - nit} 4 ‘www.onplan.com.au aon 125 105 908 fbn 83 658225 008 J ° se , 80/04/2010 5:13:00 PM As indicated i" J J approval ) }
Page 41
note:
1. all windows and doors add cedar reveals and
architraves
2. all skirting 93 x 19 pine painted
! 3. all ouvre blade finishes to be confirmed
4. 3mm x 1 x 19 arcuswire with sea rig fittings with
custom stainless steel balustrade and 125 x 125 polished
hwd handrail. design to be confirmed
oe’
stainless grate drain
use existing shower floor waste
bedroom 3
) =a DANSE
a
* custom Stainless stee! balustrade and 125 x 125
polished hwd handralt
design to be contirmed
CADocumnents and Setfingsartwy GoaumentsWORK PROJECTSionptarh201 (1005 merit 005 martin ekiMon.rv4 J
L (
- {
revisions date d by heet name
DESIGN DRAFTING oa oonPlan pty Itd . lent . ‘A. concept 1102/10 april 2010 on ” ed f “wn roposed upper
See . 0413 998 089 fax 5491 8389 . B concept revisio 0803/10 ————_ issu ‘or
Be IAN McKINVEN 0411 524 530 fax 5446 2214 ian & jo martin © preliminary " 210910 feb no. mee mi construction Proposed’ upper
a [email protected][email protected] c popmeval i : suoane __ 1005 [ome issue
SEO a eee eae 1 | 36 ross Cresent, sunshine beach. to | | eae ey Ty approval —
. wwe. onplan.com.au aen 125 105928 abn 33 658 335 908 $0/002010 5:13:11 PM 1:100 -
Page 42
proposed front
1:100
proposed south
1:100
7.50°roof pitch
7.50°roaf pitch
—
materials fegend
S0shs {duragal ‘90mm shs post to engineers specifications
aw {aluminium framed doors/windows
cs ‘concrete slab to anginears specifications & details.
cwb. "3mm x 1X 19 arcuswire with sea rig fittings with custom balustrade and handrail
dp pdownpipes to plumbers/engineers spacifications
hb handrails & balustrading to bea 3.9.2 min. 1000mm above fff
tb! —_-concrete block with applied render finish
sl -solar tube or similar skylight install to manufacturers speciticatlons
custom aluminium sr ~sheet metal roofing fixed to manufacturers specifications & details
louvre panels wo joatect wall cladding fixed to manufacturers specifications
proposed north
‘CADocuments and SettingsilaniMy Oocuments\WORK PROJECTS ionpisni20 10.1005 mastini005 mastn skint 7
! : 1:100 ‘
XN } A
( revisions date ~
+ oli i drawn by ! sheet name
DESIGN DRAFTING onplan pty Itd \ atont . A concept 110210 april 2010 im . . :
PAUL CURRIE oats 998 089 fax 5491 8389 ian & jo martin B concept revision oa/oa10 joo ne Shosrnet issued for proposed elevations
cl 11 524 530 fax 5446 2214 © pretiminary 210w10 . -
[email protected] [email protected] O preliminary revision 13/04/10 1005 11 \ construction issue .
po box 215, mofiat beach qld 4551 E approval 3104/10 | purposes
yy sCOM-aU
_ www.onplan.com.au. ) L
qosa 1123230
acn 125 105 928 abn 33 658 335 908
)
36 ross cresent, sunshine beach, — 7
9000472010 5:18:24 PM
J
J
approval]
scale (a3) ‘initial t
1:100 J) L ‘J
Page 43
CDocuments and SetingstiniMy DocumertsWORK PROVECTS\onpiarh2010\1005 martrky 005 marth ekltoruvt— /
L <
; :
f = revisions date drawn by, heet name +
DESIGNORAFTING =f onplan pty itd ‘ ; A concopt 1meno april 2010 me TT one .
> Fi PAUL CURRIE 0413 998 089 fax 5491 8389 ian & jo martin B concept revision 98/3/10 one Sostne issued for perspectives
IAN McKINVEN 0411 524 530 fax 5446 2214 C preliminary 2103/10 [pb no. eet no. construction ——
; [email protected] [email protected] e mo seat 1005 74 purposes Issue
s box 215, motfat beach ql i ;
ss -com.au|_| Poder 216, motes pogmate as5t cresent,-sunshine_ h: —|-seel.c28) jo approval
q www.onplan.com.au cn 125 105 928 abn 33 658 335 908 ) 1 042010 5:13:40 PM ) ) : J Gi J) L J
|
é
Page 44
DESIGN DRAFTING
- onplan pty itd
PAUL CURRIE 0413 998 089 fax 5491 8389
UAN McKINVEN 0411 524 530 fax 5446 2214
[email protected] [email protected]
po box 215, moftat beach qld 4551
dient
ian & jo martin |
“™ qbsa 1123230
aon 125 105 928 abn 33 658 335 808
36-ross cresent, sunshine beach:
tevisions
concept 11/02/10
concept revision O8/03/10
preliminary 21030
preliminary revision 12/04/10
approval 31/04/10
30/04/2010 6:13:47 PM
date
april 2010
job no.
1005
—[seale{a3}
—pointtiar ~~
|
i
t
(CADocumeints and SetingsttariMy Documents WORK PROJECTSorptnk201 (1006 mertrA1 005 marth skifen.vt
shest name
issued for
construction
purposes
3d view
approval
Page 45
{Su nshine Coast LAND USE SECTION FEES
Regional Council
: cIVICA TYPE RECEIPT TYPE
SALE OF DOCUMENTS
Superseded Planning Scheme Documentation 520:
Copy of Permit/Approval Letter 410
The Noosa Plan Documentation | 111
APPLICATION FEES
. Material Change of Use - - Code/Impact MCU
Consistent ~ 521
Inconsistent 621
Assessment under Superseded Planning Scheme 521
’ Modification to a Development Permit MOD DP 521
Extension of a Currency Period 521
Lot Reconfiguration RECONFIG 521
Bldg Work assessable against the Planning Scheme 7 A 521
e LODGEMENT REVIEW
Half Hour §22
One Hour * 522
ADVERTISING ‘
+ Purchase Advertised Applications 523
JETTIES
" Jetty Application Fee - 524
- Jetty Bond < . oe st :
oo . (Category 4)
BONDS _ . .
Performance Bond 51
: (Category 9)
SEARCH FEE :
. Search of Land Use Section file 112
@ Liquor Licensing Request 113
TOTAL $ “721
NAME: _ Debora K basa
ADDRESS: fo_Bax 1 3F
: __ Goupen b6rcet beSS)
FILE NO: Vf MWe pate: ¥ 72 fro
RECEIPTNO: 2s SK Hohe 0: Signature of TP Officer:
AUTHORITY NO:
IT (tore/9 (Cf;
Page 46
CALCULATION OF FEES APPLICATION FEE TOTAL FEES MCU - CODE ASSESSMENT Details of Development Consistent 1.0 Inconsistent 3.0 FEE CALCULATION MCU - IMPACT ASSESSMENT Details of Development Consistent 1.0 Inconsistent 3.0 > FEE CALCULATION 74 . « a ny OPERATIONAL WORKS Details of Development / FEE CALCULATION FOTAL FEES
Used in these records
10/0916 - Preliminary Building Approvals [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.