Council archive · source document
10/0916 - Preliminary Building Approvals [As Published] · 172010.916
@
------ upper ceiling 26.80. x7
upper floor_ 24.40 m
Relig Ma 2820
section a
1100
section b
1:100
2400 ceiling
|
2700 ceiling
Spa e
|
_. upper floor 24.40 m
— Bhiag ti. 220m “S
‘GADocuments and Senings\laniMy DocumentsWORK PROJECTStonptani201 013005 mertin\i005 martin 3.11
www.onplan.com.au
gbsa 1123230
acn 125 105 $28 abn 33 658 335 908
J
\
36 ross cresent, sunshine beach.
nN
1204/2010 10:31:13 PM
J
scale (a3)
1: 100
J
\“"
ees Pe |
.
ou
1
'
1
t
i
DESIGN DRAFTI 1 t Itd client revisions date drawn by’ sheet name
ING onpian ply A concept 11/02/10 april 2010 im | “
PAUL GURRIE 0413 998 089 fax 5491 8389 ian & jo martin 8 concept revision 08/03/10 ebro Trost no! not for sections
IAN McKINVEN 0411 524 530 fax 5446 2214 © protiminary auoano | | Pre h | construction
[email protected] [email protected] D preliminary revision 13/04/10 1005 -|—purposes— sua.
“COM 2) -|——po box-215; moffat beach gid 4551
preliminary
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/0916 - Preliminary Building Approvals [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.