Council archive · source document
Part 21 of 37 Appendix 19 - Electrical and Telecommunication Services MCU12/0208
Place Barcode here
iiii~I~~~ii
80602708
THIS IS THE NEXT PART OF A
MULTIPLE PART RECORD
Part d.\ Of "5l
Application number: MG’-.J \ ~ I 0~0~
C:\Documents and Settings\eje\Desktop\M.ulti Part Record Cover Sheer NEXT PART (3).doc
:Jcvc’ ,
I
20 (’>/,-r
-,-L.. 2f)1) (,
"vI’~"..O".
j, ’~I ""’"
’\
.,
,,’
~
I
."
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 6 pages
Page 2
111 MDA CONSULTING ENGINEERS PTY LTD
ACN 010926093
ABN 16997612233
)tsa
on weyba
Concept Master Planning Stage
Northbrook Corporation Pty Ltd
Electrical and Telecommunication
Services
PROJECT NUMBER: 12059
DATE: 23 October 2012
ISSUE: Revision 2
MDA Consulting Engineers Pty Ltd
Suite 40, Level 4
46 Cavill Ave.
SURFERS PARADISE QLD 4217
Telephone: (07)5592 0222
Facsimile: (07)5592 0279
Email: [email protected]
Page 3
DOCUMENT CONTROL RECORD
File Reference: S:\Projects\2012\2012-0059\Elec Report
Project Number: 2012-0059
Original Date of Issue: 22nd October 2012
Author Vaughan Oxenford
Signed
~
Checked Vaughan Oxenford
Signed
~
Functionality Statement Details
Title Electrical and Communication Services
Client Northbrook Corporation Pty Ltd
Client Contact Mr Steve Macrae
Revision History
Issue No. Date Description Distributed To No. Of Copies
1 22/10/12 Original Issue SMDS 1 (email)
2 23/10/12 Incorporated SMDS comments Project 1 uploaded to
Consultancy team projects FTP
site
Noosa on Weyba Rev 2 23/10/2012
-
Electrical and Communication Page 12 Project No:12059
Page 4
Table of contents
Table of contents 2
1 Introduction 4
2 Electrical Services Infrastructure 4
3 Communication Services Infrastructure 5
Noosa on Weyba Rev 2 23/10/2012
-
Electrical and Communication Page 13 Project No:12059
Page 5
1 Introduction
This report discusses the concept master planning of the electrical and communication
infrastructure services for the proposed community title scheme development called Noosa on
Webya.
The concept master planning for the electrical and communication services has been completed in
consultation with the relevant supply authorities for each service. The project concept master
planning has been designed based on the latest standards and specification provided by the relevant
authorities.
2 Electrical Services Infrastructure
Based upon the ML Design concept master plan for Noosa on Weyba, MDA consulted with the
electrical supply authority for the region being Energex. From the consultation with Energex it has
been advised that the existing network within the area has the capacity to provide a total of 4MVA.
Energex advise that this 4MVA spare capacity is shared over two (2)existing 11,000 volts (l1kV)
feeders. The first feeder with Energex identification number TWT12A is located along Hollet Road
and the second feeder with Energex identification number TWT15A and is located at the corner of
Eumarella Road and Walter Hay Drive.
From these points of connection a concept master underground 11kV high voltage plan has been
designed including location of the padmount transformer for the proposed development. For these
layouts refer to MDA Consulting Engineers drawings listed below:
Drawing Title
12059-HV-URD01 HV CONCEPT SHEET 1 OF 12
12059-HV-URD02 HV CONCEPT SHEET 2 OF 12
12059-HV-URD03 HV CONCEPT SHEET 3 OF 12
12059-HV-URD04 HV CONCEPT SHEET 4 OF 12
12059-HV-URD05 HV CONCEPT SHEET 5 OF 12
12059-HV-URD06 HV CONCEPT SHEET 6 OF 12
12059-HV-URD07 HV CONCEPT SHEET 7 OF 12
12059-HV-URD08 HV CONCEPT SHEET 8 OF 12
12059-HV-URD09 HV CONCEPT SHEET 9 OF 12
12059-HV-URD10 HV CONCEPT SHEET 10 OF 12
12059-HV-URD11 HV CONCEPT SHEET 11 OF 12
12059-HV-URD12 HV CONCEPT SHEET 12 OF 12
At each pad mount transformer there is a maximum of four (4)415 volt (LV)underground circuits
being distributed. These LV circuits are reticulated to each lot within the development and provide
the point of supply to Energex’s network for each respective lot.
Noosa on Weyba Rev 2 23/10/2012
-
Electrical and Communication Page 14 Project No:12059
Page 6
For further details on the LV circuit reticulation refer the MDA Consulting Engineers drawings listed
below:
12059-LV-URD01 LV CONCEPT SHEET 1 OF 5
12059-LV-URD02 LV CONCEPT SHEET 2 OF 5
12059-LV-URD03 LV CONCEPT SHEET 3 OF 5
12059-LV-URD04 LV CONCEPT SHEET 4 OF 5
12059-LV-URD05 LV CONCEPT SHEET 5 OF 5
Both the HV and LV Concept Master Plan drawings have been submitted to Energex. Energex have
reviewed the concept and has accepted the concept master planning for both the HV and LV for the
proposed development.
3 Communication Services Infrastructure
For the reticulation of the communication network NBN where consulted in relation to their latest
standards and specifications along with the roll out of the NBN Fibre network within the local area.
NBN advised that even though there are no current project that are on the books for the rollout of
the NBN fibre network with the local area a development ofthis size and nature would definitely
meet the criteria for fibre rollout.
NBN also advised that they do not require any input at the development application stage, however
as the proposed development was of a significant size NBN were of the opinion that it was in their
best interest to review any concept master planning of the communication infrastructure for the
development. NBN advised that for the concept master plan of the communication infrastructure an
underground pit and pipe system would be required to be design in accordance with their standards
and specifications. The future point of connection for the NBN system was determined by NBN to be
on the corner of Eumarella Road and Walter Hay Drive.
As the proposed communication infrastructure pit and pipe system will be able to share the trench
with the Energex network the majority of the proposed communication. For the full details on the
pit and pipe reticulation for the communication infrastructure refer the MDA Consulting Engineers
drawings listed below:
12059-NBN01 NBN CONCEPT SHEET 1 OF 8
12059-NBN02 NBN CONCEPT SHEET 2 OF 8
12059-NBN03 NBN CONCEPT SHEET 3 OF 8
12059-NBN04 NBN CONCEPT SHEET 4 OF 8
12059-NBN05 NBN CONCEPT SHEET 5 OF 8
12059-NBN06 NBN CONCEPT SHEET 6 OF 8
12059-NBN07 NBN CONCEPT SHEET 7 OF 8
12059-NBN08 NBN CONCEPT SHEET 8 OF 8
It must also be noted that the NBN pit and pipe specification is of industry standards which means
that once installed if any other service provider i.e. Telstra, Opticom etc wishes to enter into a
Noosa on Weyba Rev 2 23/10/2012
-
Electrical and Communication Page 15 Project No:12059
Page 7
agreement with the developer/body corporate for the development then the pit and pipe system
will be to specification for use with their network.
Noosa on Weyba Rev 2 23/10/2012
-
Electrical and Communication Page 16 Project No:12059
Used in these records
Part 21 of 37 Appendix 19 - Electrical and Telecommunication Services MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 2.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.