Original source · versioned page text
Appendix B. Forms, Searches & PLM Minutes
Attached to the e-mail Retail Bus Type 5 & Type 2 & Op Works Cover Letter, Planning Report, Owners consent & Forms -MCU17/0572 & OPW17/0611.
Noosa Council documents
PLM Document(s)/Plan(s) Title
Supporting 10615-DA10 REV 1 SITE PLAN BY
Information NETTLETONTRIBE
(Provided by Applicant)
415191 V4 05.04.2017 SITE PLAN
41591 V4 03.01.2017 STORE FLOOR PLAN
4. ADVICE & INFORMATION
Civil Engineering Officer Name Mark Lewis
Any application would need to include:
A Traffic Management Plan. The plan must be prepared by a suitably qualified person and
include but not be limited to:
• Heavy vehicle movements. Detail to demonstrate that the access and exit of heavy
vehicles does not adversely affect the functionality of Eumundi Noosa Road.
• The impacts of the proposed access/exit on existing infrastructure (bus stop,
carparking, services) and any necessary modifications or relocations. It is noted
that the aces driveways indicated on the submitted concept plans appear to be
excessive and it is recommended that the driveways be kept to the minimum width
required. It is also noted that the exit driveway may restrict access to the adjoining
carparking area to the west of the site. No easement exists through the adjoining
property to 1 Rene Street, we are currently investigating the Development
Approval for 1 Rene Street to further clarify potential access arrangements.
• Detail to demonstrate that heavy vehicle movements within the site for servicing
and deliveries are functional with reversing movements kept to an absolute
minimum. Waste collection must be in accordance with Council’s waste collection
requirements
• Carparking requirements
A Stormwater Management Plan. The plan must be prepared by a suitably qualified person
and include but not be limited to:
• Detail to demonstrate how stormwater runoff from the buildings and hardstand
areas will be collected, treated and discharged. This includes any specific
requirements for the proposed use.
• Demonstrate a lawful point of discharge and that any downstream drainage system
has the capacity to cater for the additional runoff from the site. It is noted that there
is no obvious downstream drainage system noted on Council’s mapping system
This document is a record of prelodgement discussions and will not be made available for public viewing. Prelodgement
discussions are conducted to explore development options and requirements, identify issues and provide guidance to prospective
applicants about Council’s policies for development. The recorded discussion items and outcomes in no way imply or commit to an
approval of the proposal on the part of Council or Council officers, nor guarantee that all potential issues associated with a
development proposal have been raised / identified. When a formal development application is lodged, the proposal will be
assessed on its planning merits in accordance with Council’s policy framework existing at the time of the assessment.
FM6082/8-18/04/2013 Page 2 of 4
Document Set ID: 20428661
Version: 5, Version Date: 29/09/2017 Print Date: 29 September 2017, 1:30 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.