Memorandum
18-001942 - Sunrise Beach Interim RAC Water Quality
Figure 1 - MUSIC Model Set Up
2.2 Treatment Strategy
The onsite treatment strategy proposed for the RAC site and currently included as part of the OPW design package
(extract attached) is as summarised generally follows:
1. All built ground areas are collected within an internal pipe drainage system and conveyed towards the treatment
devices at the northern boundary of the site;
2. A minimum one quarter of the roof area from the building will be diverted to a 30,000L tank with captured
rainwater being plumbed in for internal and external reuse;
3. Flows from the pipe system and rainwater tank overflow are directed to a 50m 2 bioretention basin. The inlet of
the bioretention basin includes an appropriately sized coarse sediment forebay;
4. Overflow and treated flows from the bioretention basin is directed to an infiltration basin with a floor area of
45m2.
It is noted that only within this interim MUSIC model was the infiltration basin also modelled alongside the bioretention
basin. Typically infiltration basins aren’t modelled in MUSIC within SEQ for a number of reasons including:
Turning Knowledge
Into Value
Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment B - Stormwater Quality Engineering Response.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.