Council archive · source document
RFI - Attachment B - Stormwater Quality Engineering Response · 132008.1128.04
Original PDF page 5, section 1. The text section number identifies this passage in the reader.
Memorandum
18-001942 - Sunrise Beach Interim RAC Water Quality
Calibre has undertaken the above investigations in consultation with Noosa Shire Council to assess the risk of the
development to the surrounding environment and has concluded that the water quality treatments proposed are adequate
for the site. In addition to this, it is noted these reductions have been achieved to a much higher standard than other SEQ
Councils at the request of Council Officers and also completed in accordance with the Girraween Stormwater
Management Plan, which again has meant a much higher water quality outcome has been achieved.
Should you have any further queries please don’t hesitate to contact the undersigned,
Lance May (RPEQ 19400)
Senior Engineer – Water and Environment
ATTACHMENTS
1. Bore Hole Logs
2. Engineering Drawings
Turning Knowledge
Into Value
Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment B - Stormwater Quality Engineering Response.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.