Response to Issues- 8.04.2015

Attached to the e-mail MCU14/0056 Additional information from applicant.

of 4

Page text shows just the words. Original shows the document exactly as it was published.

Our reference: 6520
Your reference: MCU14/0056

8 April, 2015

Noosa Council
PO Box 141
TEWANTIN QLD 4565

Attn Dean Wallace

Dear Sir

RE: Proposed Mixed Use Development 125 Myall Street, Cooroy- MCU 14/0056

I refer to our recent telephone discussion on 23 March. During that conversation you raised three items
that you were specifically considering-

    1. Instance where no signage was available on the Bruce Highway to make motorists aware of
       services available, thereby impacting on the likely need for the development servicing passing
       highway traffic.
    2. Water Quality impacts having regard to the location of the site within the Lake Macdonald
       catchment.
    3. Traffic issues associated with the intersection of Elm St and Myall St.

To assist Council with their deliberations on these matters we provide the following-

    1. Please see attached photos of existing signage at the northern and southern approaches to the
           Myall St exit for Cooroy. This signage is sufficient to indicate the existence of such services
           available to motorists should they use the exit. The development subject of consideration by
           Council will require no additional highway signage with only possible caravan and information
           symbols sought to be included to the existing signage. These will be sought, if required, as a
           separate request to DTMR. The existing signage clearly advises motorists should they take the
           Myall St exit that such services exist within the Cooroy township or as will be available upon the
           approval and development of these services on the subject site. The need for the development is
           documented within the planning report and the Needs Assessment Report dated July, 2014
           prepared by Foresight accompanying the application and subsequent Response to Information
           Request Report dated December, 2014 prepared by Foresight. An extract from the December
           report confirms the unique nature of the site –
Log in to download the original file

Response to Issues- 8.04.2015.pdf · 325 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 3 pages

Page 2

    We ask that Council have regard to all information previously submitted with regards to the need
    for the development.


2. Matters related to water quality impacts of the development have been addressed in detail
   within the original reports and response to information requests by SHG, vT Consulting Engineers
   and the Ecological response report by Saunders Havill Group. The report by vT Consulting
   Engineers, including response to SPP and SEQ Water Development Guidelines demonstrates that
   the development will not adversely impact on the quality of water entering Lake Macdonald. SEQ
   Water, the authority responsible for the management of Lake Macdonald and its function as a
   water supply, has reviewed the report by vT Consulting Engineers, including the detailed
   response to the SEQ Water Development Guidelines, and has provided the following advice -
   “SEQ Water are satisfied that stormwater management, setbacks to the minor watercourse and
   general treatment of the riparian corridor are in accordance with the Seqwater Development
   Guidelines”. SEQ Water’s advice included the following recommendations that can be
   incorporated as conditions of approval by Council-
   a. “It is recommended that a Rehabilitation and Weed Management Plan is prepared by a qualified
   professional at the appropriate stage of development and approved / endorsed by Council prior to
   development commencing on the site”
   b.” Seqwater recommends the preparation of an Inspection and Maintenance Schedule and an
   Emergency Response and Contingency Plan for the pump station. This should be endorsed / approved
   by the relevant authorities (Council, DEHP). Seqwater requests a copy of any such plan for review when
   available”.
   c. “Should the location of the proposed on-site sewerage pump station change, Seqwater requires that
   this facility maintains at least a 50m setback from the surveyed high bank of the watercourse on the
   site”.
   d. “Seqwater strongly supports provision of at least 25% and up to 50% more emergency storage
   capacity at the pump station, than that required by the SEQ Sewer and Water Code”.
   e. “Seqwater requests to be included on a notification register in the event of any overflow / spill / other
   sewage discharge event”.



    Further, the SPP Part D, “making or amending a planning scheme “with regards to State Interest
    Water Quality, specifically refers to development complying with the Seqwater Development
    Guidelines. This is a matter of State Interest that must be addressed by Council when preparing
    or amending a planning scheme.
                                                    2

Page 3

To the extent that the Noosa Plan suggests measures to the alternative, the current planning scheme
has been overtaken by events. Specifically the development meets the Seq Development guidelines
as confirmed within the above advice from Seqwater. Grounds exist to approve the development
despite any conflict as outlined within the report accompanying the application and as outlined
below-

    There is a demonstrated need for the proposed mixed use development and it is well located to
     serve residents, visitors and highway traffic in the region. The development is not anticipated to
     affect the function and viability of the Cooroy Town Centre or existing service stations and the
     benefits to the community are expected to outweigh any negative impacts.
    The proposal expects to benefit the residents of the local area by providing complementary
     facilities such as the fuel retailing, the convenience retail and the fast food retailing. There is a
     clear gap in the distribution of fast food/takeaway outlets in the area, with the Cooroy
     community having to travel to one of the higher order centres such as Tewantin or Noosaville for
     greater choice of such facilities.
    The proposed development would provide a service to highway motorists in the form of service
     station and drive-thru fast food option and rest area about half way between the Matilda Fuels
     service station at Kybong (to the north) and the BP at Forest Glen (to the south)- approx. 60km.
    Having regard to its location to nearby urban development, its part urban designation under the
     Noosa Plan Strategy map, Urban Footprint classification in the SEQ Regional Plan and land
     attributes, the development will not impact on rural amenity nor agricultural productivity ,nor
     scenic and environmental values nor impact on water quality to an extent to warrant refusal of
     the application;
    The Noosa Planning Scheme 2006 with regards to the subject site and the intended form of
     development is out of date and does not adequately provide for development of the nature
     proposed.

3.    Myall Street is a road under the control of DTMR. In their response to the application, SARA
     (DTMR) did not place a condition regarding the intersection of Myall St / Elm St. The traffic report
     prepared by TTM accompanying the application and the related information response, clearly
     identifies that the proposed development will not have significant impact on the subject
     intersection. The response to the Council’s information request states-




     Notwithstanding, conditions may be imposed on an approval pursuant to S 345 of SPA. Matters
     relating to the operation of the intersection and having regard to the nature of the development
     and its traffic impacts are not such to warrant refusal of the application.



                                                   3

Page 4

Should you require any further information or wish to discuss, please contact me on (07) 3251 9421 or
email: [email protected] faithfully

Saunders Havill Group




Eddie Venturini
Principal Town Planning

Attachments

    1. Photos of existing signage
    2. SARA response
    3. SEQ Water Response




                                                   4

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.