Skip to the record
For the highest quality transcripts.

Original source · versioned page text

07/1531 - Operational Works - Landscaping Stage 1 [As Published]

of 21

Page text read automatically using OCR, there may be inaccuracies

 

NeekeKywe Checklist - Applications Involving Land
Development & Land Use Sections

Sa

 

IDAS APPLICATION

This checktist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.

1. APPLICATION FORMS ~~ _ ue a : ,
1.1. Form PartA

1.1.1 Ensure that the form is fully completed.

 

 

 

 

1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required.
1.1.2.1 If there are multiple owners, the consent of each owner is required. ot A
1.1.2.2 ifthe owner of the land is a company, either ACN No. or Company Seal required.
1.2 Form Part B-O Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached.
1.1.2.1. Ensure that each of Forms B-O which are attached are fully completed.
2. REFERRAL INFORMATION ae .
2.4. Ensure that items 1-23 have been checked and/or completed with regard to referrals.
3. ENVIRONMENTALLY RELEVANT ACTIVITIES, vo
3.1. Ensure that Part G is completed if EPA referral is required.

tne i we : : mans mere

JNA

 

 

 

3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.

‘4. | FORM 2-REQUEST.TO CHANGE APPROVAL

4.1 Ensure that items 1-28 have been checked and/or completed including information regarding
applicant details and owners consent.

 

 

 

5. PLANS , 2. 2 Na
5.1 Ensure that at least 6 sets of the Plan ‘of Development (5 for Reconfiguration and Operational
Works) accompanies the application. In addition ensure that each set is complete.

5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is
unbound.

6. - SUPPORTING:INFORMATION wm ” - owe

6.1. Ensure that at least 6 copies of any report accompanies the application 6 for Reconfiguration
and Operational Works). If the application is accompanied by a covering letter, ensure that itis
capable of reproduction.

6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.

Te EE ee ca ee mie s
7.1. Ensure that the application fee, as determined from the Council's adopted scale of fees,
accompanies the application or has been paid.

7.2 Ensure that the fee which has been paid is recorded on the application form.

 

 

 

 

 

weet mm me tee et

«

vi

 

pan ge ete eR exam AN Shame Mn een 7 mea

   

®

 

 

We tld

 

 

 

 

 
 

Having completed this form and accepte

trays:-

¢ Ifthe application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section.

« Ifthe application is for an Material Change of Use & Reconfiguration - AOP1's desk in the Land Use Section.

¢ — {f the application is for Operational Works (for parking, access, sewerage or drainage) exclusively — AOD2 in the
Land Development Section.

¢  Inall other circumstances - AOP1’s desk in the Land Use Section.

Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.

application, please deliver both to the following IDAS Application Receiving

 

 

SEP! g:\ant\forms\application checklist.doc

 

Log in to download the original (07_1531 - Operational Works - Landscaping Stage 1 [As Published].pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.