Original source · versioned page text
07/1531 - Operational Works - Landscaping Stage 1 [As Published]
INTEGRATED PLANNING ACT 1997
Integration of land use and public
transport
For more information refer to Guide 23, schedule
8A of the IPA, & schedute 2 of the JP Regulation.
Unless you answered “none of the above’, the
application tiggers referral to QT as a
concurrence agency.
IDAS Assessment Checklist, Version 20, 2 April 2007
22. The application involves: (tick the applicable box/es}—
UO (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedute 13C of the IP Regulation and exceeding the thresholds set by that
schedule.
Li (ii) reconfiguring a lot—
CJ (a) ontand that is completely or partly within a public transport corridor, and the
total number of lots increases;
(1 (b) on land that is completely or partly within a future public transport corridor or
an airport's public safety area;
(1c) _ on land that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m2 or greater;
(1 @) _ for aresidential purpose within the 25 ANEF contour for an airport;
(1 (e) _ for a residential purpose resulting in 100 or more allotments.
LC (il) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that—
(a) _ is completely or partly within a public transport corridor or a future public
transport corridor;
[1 (b) _ will result in work that encroaches into an airport's operational airspace.
EX (iv) none of the above.
Raitway safety and efficiency 23, The application involves: (tick the applicable box/es}—
For mare information refer to Guide 23, schedute i) a material change of use assessable against the planning scheme for a purpose
BA ofthe IPA & schedule 2 of the ERenulaton, Oe mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
Unless you answered “none of the above’, the schedule.
application triggers referral to QT as a
concurrence agency. 0 (ii) reconfiguring a tot—
C1 (a) _ onland that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;
(1) (b) on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m2 or
greater;
(©) _ onland that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases;
CJ (d) — on land that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;
CH (e) on tand that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;
(CO (f) for a residential purpose resulting in 100 or more allotments.
LD (ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i} above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50mé, on land that—
(a) _ is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
{J (b) is completely or partly within future railway land, or a railway tunne! easement;
[LJ (c) abuts rail corridor land, commercial corridor land or future railway land, and
the work is within 25m of the railway boundary.
LX] {iv) none of the above.
Moonie to Brisbane pipeline 24. The application involves the easement for the construction or operation of the Moonie to
For more information refer to schedule 2of the IP
Requiation.
Unless you answered “none of the above’, the
application triggers referral to the holder of
pipeline licence No 1 issued under the Petroleum
Act 1923, currently Santos QNT Pty Ltd, for
advice.
Brisbane strategic pipeline, and involves: (tick the applicable box/es)—
C1 (i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement.
(J (ii) reconfiguring a lot
1 (iti) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.
(iv) none of the above.
Page 8
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.