Original source · versioned page text
07/1531 - Operational Works - Landscaping Stage 1 [As Published]
INTEGRATED PLANNING ACT 1997 Part E, Version 2.1, 18 June 2007 coro rn Operational &/or building work ~3, —-. Moy Ss assessable against a local government's planning scheme <2: —--+ Completion of all question on Part E is mandatory for all applications involving the assessment of operational work and/or building work assessable against a local govemment’s planning scheme (including detailed engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual design plans for engineering & building work when the application does not involve assessment of a material change of use of premises at the same time). Nature of the works The types of work that are assessable against; a planning scheme are determined by the scheme for a particular local govemment and will vary across the State. To determine the types of work that are assessable under a particular planning scheme, contact the relevant local government. The information in Q2 is necessary for Statistical and planning purposes. Nature of the application A development pemit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur. Portable Long Service Leave levy (if applicable) Prior to issuing a development penmit for the works, the assessment manager is required by law to “sight” an approved form, issued by Qleave, which signifies that the PLSL levy has been paid. For further information refer to http/Awww. gleave.qid.gov.au 1, "This application is for: (tick one (1) or both teppicabie) The application is seeking approval of (tick one (1) or both if applicable): oO Building work assessable against a planning scheme - provide details of the aspects of building work (e.g. building height greater than 8.5m; building work on high landsiip risk area) KX] Operational work assessable against a planning scheme - provide details of the nature of the operational work (e.g. roadworks; landscaping; drainage works; stormwater, water infrastructure; sewerage infrastructure; earthworks; clearing vegetation; signage) [ LANDSCAPING Is the application for operational work involving the creation of new lots? No (71 YES - specify number of new lots to be created below [ Does the proposal involve the construction of a canal that is associated with reconfiguring a lot? Jno 8=©©L Yes Preliminary approval - provide detaiis of the type of work eg. roadwork, stormwater, water and sewerage infrastructure, etc L J QJ Development permit - provide details of the type of work eg. roadwork, stormwater, water and sewerage infrastructure, etc | Are the works subsequent to a previous development permit or pretiminary approval? LINO [XI YES - provide details of all previous approvals List of approval reference/s Date approved Date approval lapses Loy [57444 21_ 109! 1095 id \s payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal? (CJ YES - complete Q7 [XI] NO - 07, 8 & 9 donot apply Has the PLSL levy been paid? (11 YES - complete 08 0 NO ~ the applicable levy must be paid before a development permit can be given for the works How much was paid? | _| What is the receipt number of the payment? | 4
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.