07/1531 - Operational Works - Landscaping Stage 1 [As Published]
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007 State-controlled road matters 2. The application involves: (tick applicable boxes) For more information refer to Guide 3 (J (i) development on land contiguous’ to a State controlled road and for - Unless you answered "none of the above" to Q2, . . . the application triggers referral to the Department LO (a) material change of use assessable against the planning scheme; of Main Roads (DMR) as a referral agency. i - tn certain circumstances DMR will be an advice O (b) reconfiguring a fot unless + . agency, while in other circumstances DMR will « the total number of lots is not increased; and be a concurrence agency. « the total number of lots abutting the State-controlled road is not increased; Genero 2 ofthe f Reuulaton val assis you to O(c) operational work (not associated with a material change of use assessable against the concumence agency for the application. planning scheme or reconfiguring a fot mentioned in (b) above)- « associated with access to a State-controlled road; or ¢ for filling or excavation; or « involving the redirection or intensification of site stormwater from the tand, through a pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a State-controlled road. C1 (ii) development on land not contiguous to a State-controlled road and - (a) material change of use — « assessable against the local government's planning scheme; and « mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by that schedule; CD (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation and exceeding the thresholds set by that schedule; (1 (c) operational work (not associated with a material change of use assessable against the planning scheme or reconfiguring a lot mentioned in (b) above)— « assessable against the local government's planning scheme; and « mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by that schedule. 1 (iii) none of the above Clearing vegetation 3. The application involves: (tick applicable boxes) For more information refer to Guide. 12. CO (i) material change of use - Unless you answered “none of the above" to Q3, bl inst the planning sch . the application requires assessment by the (a) assessable against the planning scheme; a Natal Resources and Walt (b) on alot containing - ifan agency other than NRW is the assessment acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or manager for the application, NRWisa © « ifthere is no property map of assessable vegetation for the lot - remnant vegetation; fopcirrence agency forthe appication in elation (c) where the existing use of the land is a rural or environmental use; and Hf you ticked Q3() or (i), your application requires! (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1 teferral to NRW for assessment regardless of CI (ii) reconfiguring a lot - whether vegetation clearing ts proposed or not. a (a) ona lot containing a category 1, 2 or 3 area shown on a property map of assessable vegetation or, if there is no property map of assessable vegetation for the lot, remnant vegetation; (b) where the size of the lot before the reconfiguration is 2 hectares or larger; (c) where 2 or more lots are created; and (d) where the size of any fot created is 25 hectares or smaller - complete Part J of Form 1 D (iii) operational work - (a) for the clearing of native vegetation where the vegetation clearing is made assessable under Schedule 8 of the IPA; and (b) not associated with a material change of use assessable against the planning scheme mentioned in (i) or reconfiguring a lot mentioned in (ji) - complete Part J of Form 1 1 (iv) none of the above. Strategic port land 4. The application involves: For more information refer to Guide 11. If you ticked (i) - the relevant Port Authority is the assessment manager for the application. if you ticked (i) Queensland Transportis a concurrence agency for the application. C1 (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI Act) - complete Part | of Form 1 O (ii) a material change of use that is inconsistent with the land use plan approved under the TI Act for the strategic port land - complete Part ! of Form 4 I (iii) none of the above 4 Land contiguous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean land - if past of the land is within 100m of the State-controtted road; or that is past of a future State- controlled road. Page 2
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.