Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

07/1531 - Operational Works - Landscaping Stage 1 [As Published]

of 21

Page text read automatically using OCR, there may be inaccuracies

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007

 

 

State-controlled road matters 2. The application involves: (tick applicable boxes)
For more information refer to Guide 3 (J (i) development on land contiguous’ to a State controlled road and for -
Unless you answered "none of the above" to Q2, . . .
the application triggers referral to the Department LO (a) material change of use assessable against the planning scheme;
of Main Roads (DMR) as a referral agency. i -
tn certain circumstances DMR will be an advice O (b) reconfiguring a fot unless + .
agency, while in other circumstances DMR will « the total number of lots is not increased; and
be a concurrence agency. « the total number of lots abutting the State-controlled road is not increased;
Genero 2 ofthe f Reuulaton val assis you to O(c) operational work (not associated with a material change of use assessable against the
concumence agency for the application. planning scheme or reconfiguring a fot mentioned in (b) above)-
« associated with access to a State-controlled road; or
¢ for filling or excavation; or
« involving the redirection or intensification of site stormwater from the tand, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
C1 (ii) development on land not contiguous to a State-controlled road and -
(a) material change of use —
« assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
CD (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
(1 (c) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above)—
« assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.
1 (iii) none of the above
Clearing vegetation 3. The application involves: (tick applicable boxes)
For more information refer to Guide. 12. CO (i) material change of use -
Unless you answered “none of the above" to Q3, bl inst the planning sch .
the application requires assessment by the (a) assessable against the planning scheme;
a Natal Resources and Walt (b) on alot containing -
ifan agency other than NRW is the assessment  acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
manager for the application, NRWisa © « ifthere is no property map of assessable vegetation for the lot - remnant vegetation;
fopcirrence agency forthe appication in elation (c) where the existing use of the land is a rural or environmental use; and
Hf you ticked Q3() or (i), your application requires! (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
teferral to NRW for assessment regardless of CI (ii) reconfiguring a lot -
whether vegetation clearing ts proposed or not. a
(a) ona lot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
(b) where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and
(d) where the size of any fot created is 25 hectares or smaller - complete Part J of Form 1
D (iii) operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ji) - complete Part J of
Form 1
1 (iv) none of the above.
Strategic port land 4. The application involves:

For more information refer to Guide 11.

If you ticked (i) - the relevant Port Authority is the
assessment manager for the application.

if you ticked (i) Queensland Transportis a
concurrence agency for the application.

 

C1 (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
Act) - complete Part | of Form 1

O (ii) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - complete Part ! of Form 4

I (iii) none of the above

 

4 Land contiguous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean land - if past of the land is within 100m of the State-controtted road; or that is past of a future State-

controlled road.

Page 2

Log in to download the original (07_1531 - Operational Works - Landscaping Stage 1 [As Published].pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.