Original source · versioned page text
MCU14/0096 - Attachment 2
Attachment 2 – Proposal Plans
\
[word/footer1.xml]
Page 1 of 2
[word/header1.xml]
3
[Attachment: image1.png (image text)]
PRODUCTION STREET
Fish Transport loading T Uber Truck Parking | 1
: yo Ares
SHED 1 | SHED 2 | SHEL) 3
Fos} Goth q
ee A
oT ao
Quarantine | fot Be
Ares |
Wosh down
Acea,
ddaste dischase
ashe pipe, {Connection pomt
fo unste ton waste Tank
e\ '2aso0 Ite
“|
Replacement fie
Water entry pai Sep ilater Storage
| 23s00 He
Seawoter to be
Feveked tin
SITE PLAN
Drawing, Number - 1
Date - 8-3-3015
Scole ~ 11200
[Attachment: image2.png (image text)]
Quocontine MY
—— Return Flow fo Sump
a ater Supply to tanks
TH Caste te Serer storage Tank
Direction of Flow
FLOOI PLAN
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.