Skip to the record
Every meeting, every word.

Original source · versioned page text

Meeting papers

of 93

Page text shows just the words. Original shows the document exactly as it was published.

                              AGENDA


             General Committee
                  Meeting

                Monday, 20 January 2025

                      commencing at 12:30 PM
               Council Chambers, 9 Pelican Street, Tewantin




Committee: Crs Brian Stockwell (Chair), Karen Finzel, Amelia Lorentson, Jessica Phillips, Tom
Wegener, Frank Wilkie, Nicola Wilson




                          “Noosa Shire – different by nature”




                                                                                        Page 1 of 93
Log in to download the original file

1eac2304da.pdf · 8.1 MB (large file)

The download may take up to a minute.

Full text of pages 2 to 73 (of 93)

Page 2

GENERAL COMMITTEE MEETING                                                      20 JANUARY 2025



1.      DECLARATION OF OPENING

2.      ACKNOWLEDGEMENT OF COUNTRY

3.      ATTENDANCE & APOLOGIES

4.      CONFIRMATION OF MINUTES

5.      PRESENTATIONS

6.      DEPUTATIONS

        1      DEPUTATION - Sustainable Transport
               Applicant: Jennifer Clement on behalf of Zero Emissions Noosa
               Speakers: Anne Kennedy, Vivien Griffin and Jennifer Clement

7.      ITEMS REFERRED FROM COMMITTEES

8.      REPORTS DIRECT TO GENERAL COMMITTEE


     8.1.      GO NOOSA INTERIM REPORT


               CONTRACT NO. RP00073 REGISTER OF PRE-QUALIFIED SUPPLIERS FOR
     8.2.
               PROVISION OF PARKS AND LANDSCAPING SERVICES


     8.3.      COMMUNITY GRANTS POLICY - REVISED


               PROCUREMENT ASSESSMENT WORKING TEAM - CONTRACT AWARDS UNDER
     8.4.
               CEO DELEGATION


     8.5.      FINANCIAL PERFORMANCE REPORT – DEC 2024


     8.6.      BUDGET REVIEW 2 (BR2) FOR THE 2024/25 FINANCIAL YEAR


               PLANNING APPLICATIONS DECIDED BY DELEGATED AUTHORITY - NOVEMBER
     8.7.
               2024


     8.8.      LEGAL COUNSEL UPDATE

9.      CLOSED SESSION

               
        9.1.   INTEGRATED LANDFILL CAPPING SOLUTION - TENDER
               CONSIDERATION PLAN




                                                                                          Page 2 of 93

Page 3

GENERAL COMMITTEE MEETING                                      20 JANUARY 2025


             
      9.2.   62 LAKE MACDONALD DRIVE, COOROY - REVISED
             SUBDIVISION LAYOUT

10.   MEETING CLOSURE




                                                                              Page 3 of 93

Page 4

GENERAL COMMITTEE MEETING                                                         20 JANUARY 2025


8.1     GO NOOSA INTERIM REPORT


Author            Director Infrastructure Services, Shaun Walsh
                  Infrastructure Services Department
Index             ECM/ Subject/ Transport Policy
                  ECM/ Project & Contract/ Transport Strategy / Car Parking Management
                  ECM/Project & Contract/ Transport Strategy / General
Attachments        1.   Attachment 1 - 250109 Noosa Drive and Hastings Street


EXECUTIVE SUMMARY
The Go Noosa Holiday Program is a key initiative within the Noosa Transport Strategy 2017–2027
(the Strategy), designed to enhance the transport experience for both residents and visitors and is
funded via the Sustainable Transport Levy (the Levy). The Levy is an essential resource for funding
initiatives to sustainably manage congestion, alleviate pressure on the road network, and address
parking challenges throughout the Noosa region. The program is funded to the amount of $900,000
largely through the Transport Levy. Despite rising costs associated with delivering the Go Noosa
initiatives, the Levy has remained unchanged since 2018 and is currently in deficit.

The viability of existing programs should be assessed to ensure the Levy funds are utilised effectively
to continue developing the Strategy initiatives. This interim report focuses on the Free Bus program
and the Council Cabs and Flexi-link services due to impending funding and operations deadlines. A
fuller report concerning the whole program including comprehensive data, will be presented later this
year.

RECOMMENDATION
That Council note the report by the Director Infrastructure Services to the General Committee
Meeting dated 20 January 2024 regarding the Go Noosa Program and
A. Advise Translink that Council wishes to cease the Free Weekend Bus Services and the Go
   Noosa Free Bus service for peak seasons in light of 50cent fares and authorise the CEO to
   negotiate an amended Go Noosa agreement with Translink concerning remaining Go Noosa
   services;
B. Undertake a community information program jointly with Translink to advise patrons of changes
   to the bus service;
C. Note that a review has commenced of the Council Cabs and Flexilink services to assess their
   effectiveness and return on investment in preparation for 2025-26 financial year budget; and
D. Note the proposed traffic management changes at the corner of Noosa Drive and Hastings Street
   as outlined in this report.


REPORT
1. Operational Summary

Free Buses under the Go Noosa program continued on weekends and peak periods over the recent
Christmas and New Year period consistent with previous years. Recently State Government
announced the ongoing implementation of 50-cent public transport fares across the region. In
addition, the State has commenced rollout of Smart Ticketing and contactless payment, aimed to
replace Go Cards. These two state wide initiatives have largely negated the need for Council funded
Free Buses, as it also provides a key incentive for patrons to use public transport and assist in
congestion reduction.



                                                                                                  Page 4 of 93

Page 5

GENERAL COMMITTEE MEETING                                                       20 JANUARY 2025



The August 2024 Go Noosa evaluation report presented to Council's July meeting outlined the need
for review of Council Cabs and Flexilink services due to low patronage and increasing costs. It is
intended to commence this review for the 2025-26 budget to ensure optimal use of funds generated
by Council's Transport Levy.

In addition, parking changes are proposed at the corner of Noosa Drive and Hastings Street,
including the relocation of the existing loading zone located, widened footpath and increased
motorbike parking. These measures were trialled over the Christmas peak period to observe
potential improvement to traffic delays while prioritising pedestrian safety. These changes have been
favourably received by the local business community and have been seen to successfully improve
pedestrian and traffic flow.
These three Go Noosa program initiatives require immediate evaluation and are presented ahead of
a more comprehensive report which will include a review of the full program including evaluations
of:
• Bus patronage
•   Lions Park overflow parking
•   Main Beach drop-off zone
•   Park-and-Ride services
•   Wayfinding signage
Free Buses in Light of the 50-Cent Public Transport Scheme
The introduction of the Queensland Government's 50-cent flat rate for public transport has been
confirmed by Government as ongoing and has prompted a need to reassess the Go Noosa Free
Bus program, which is funded by Council through Translink as the service provider.

A review has been conducted to evaluate the cost-effectiveness of continuing the Free Bus program.
Key aspects include:
• 50-cent flat-rate public transport scheme provides significant incentive for public transport users
    and negates the need for the Free Bus program. Data received from Translink shows 9.2% uplift
    on weekends and 22.8% on weekdays arising from the 50-cent program since its inception.
• Preliminary estimates suggest potential savings may be realised if the Free Bus program is
    removed from Translink agreements, which is currently funded by the Transport Levy. This
    contracted amount is commercial in confidence but the amount is not insignificant.
• Consideration needs to be given to retaining the Go Noosa Loop service (between park-and-ride
    areas and Hastings Street) as a free service, as it is unclear whether Translink would provide
    this service at the 50-cent rate.
• Subject to negotiations with Translink, retention of the Go Noosa Loop service to park and ride
    stations may mean that Council maybe able to alter the way this service is provided, including
    use of smaller buses. This aspect requires further detailed consideration with Translink, the
    Transport Operation (Passenger Transport Act) including any use of public bus stops
Following negotiations with Translink the full financial savings will be clearer.

Any changes to transport arrangements will need to be fully communicated to the public and a
communications program is planned to advise of altered arrangements.

Review of Council Cabs and Flex-link Services
Council operates a Flexi-link service between Boreen Point and Tewantin for people with limited
transport options and connects passengers with existing public transport services for onward
journeys. Council Cabs provides affordable door-to-door transport service for eligible
residents. A comprehensive review of the Council Cabs and Flexi-link services has commenced to
evaluate its usage and cost to the Council. Key components of the review include:




                                                                                                Page 5 of 93

Page 6

GENERAL COMMITTEE MEETING                                                         20 JANUARY 2025


•   Patronage and cost.
•   Alternative services now available by community and charity services.
•   Investigating existing State Government programs, such as the Community Transport Program
    and The Taxi Subsidy Scheme (TSS), to determine how these can support the transition.
•   Benchmarking other on-demand services implemented by Translink in other regional localities
    in Queensland
•   Direct engagement with existing users.
•   Consideration of alternatives including termination of the schemes and/ or replacement with new
    initiatives
For the 2023-2024 financial year, the combined total Council expenditure (ex GST) for Flexi-link and
Council Cabs was $58,491.44.


Parking Changes at the Corner of Noosa Drive and Hastings Street
A trial over the Christmas period of the following traffic management changes were undertaken in
Noosa Drive and Hastings Street to improve pedestrian and traffic flows:
•   Implementation of footpath widening by relocating the existing loading zone and removal of
    parking spaces in Noosa Drive outside Ben & Jerry's to enhance pedestrian capacity and
    accessibility, aligning with current pedestrian flow demands. Additionally, the removal of parallel
    parking near the Hastings Street roundabout once again help alleviates forward queuing, thereby
    improving traffic flow and reducing congestion.
•   Reallocated the existing parking area in Hasting Street outside Rococo's to dedicated motorcycle
    parking to enhance traffic flow by reducing congestion caused by vehicles attempting to parallel
    park at this location. This adjustment minimises disruptions to the Hastings Street and Noosa
    Drive roundabout by mitigating immediate forward queuing, enabling smoother traffic movements
    through the roundabout.
These changes were favourably received by the Hastings Street Association and as a result is
proposed to continue as a trial for three months in order to monitor and receive feedback during this
time. In the event that ongoing feedback is positive, these changes may be rolled out permanently.
Council staff recommend Councillors inspect the locality during the trial period, and a mutually
convenient time will be arranged by Infrastructure Services staff.

New Sustainable Transport Initiatives
It is anticipated that forecast changes will provide a significant release of financial and resource
capacity to advance other new sustainable and contemporary transport initiatives that focus on
emerging priorities. Opportunities are currently being assessed by staff and will be subject to future
reporting and Council decision.
One emerging area is electric mobility. As its meeting of 17 October 2024, Council resolved a Notice
of Motion concerning e-bikes and e-scooters, including e-bike rider education as part of the Go
Noosa program and referred future funding requirements to budget deliberations. E-bikes and e-
scooters have the potential to be a significant new mobility means to reduce congestion in Noosa
and is supported by the Noosa Transport Strategy. At the moment resources are not available to
advance response strategies around this emerging transport form.
If funding capacity is made available, Council resources could be made available to explore initiatives
which may include:
•   Establishing safe infrastructure for e-mobility, such as designated lanes and parking areas.
•   Running safety and education campaigns.
•   Partnering with the State Government to advocate for the revival or expansion of rebate
    schemes.




                                                                                                   Page 6 of 93

Page 7

GENERAL COMMITTEE MEETING                                                        20 JANUARY 2025



Link to Corporate Plan

Theme No. 2 - Liveability
Liveability encompasses housing, facilities and services, transport, health and wellbeing to enable
an inclusive, connected and vibrant community.
Objective 2.4 Advocate and partner with all levels of government for increased funding for
connected transport nodes, transit hubs, including walking, cycling and public transport and explore
opportunities through smart city1, smart biosphere and innovation to transform the way we move
around and engage in our community.
Objective 2.7 Fund and deliver sustainable assets and facilities and associated services responding
to the changing needs of the community and the challenges and opportunities of the future.


Previous Council Consideration
Ordinary Meeting Minutes 12 August 2024
That Council
A. Note the report by the Acting Director Infrastructure Services to the General Committee meeting
   dated 12 August 2024 regarding the Go Noosa Initiatives;
B. Delegate authority to the CEO to approve the ongoing implementation of the Go Noosa
   initiatives as outlined in this report, subject to Council’s budget processes;
C. Note the proposal for Council Officers to undertake a review of the of the Boreen Point Flexilink
   and Council Cabs service and report back to Council;
D. Note that, as Council has yet to conduct community engagement specifically on the future use
   of the Noosa Heads Lions Park Reserve during peak periods as per the Motion of March 16,
   2023, approve the use of the Noosa Head Lions Park for additional overflow parking in the period
   from Saturday 14 December 2024 to Tuesday 28 January 2025 and Saturday 2 April 2025 to
   Monday 21 April 2025 by the Tewantin Noosa Lions Club at their discretion and that Council
   communicate these intentions with the Queensland Department of Resources; and
       1.      Authorise the CEO to negotiate fees.
E. Seek community feedback on the future use of the park;
F. Approve the temporary use of the "Main Beach Local Government Reserve”, adjacent to the
   Noosa Heads Surf Club, as a “Main Beach Drop Off Zone” for the peak Christmas/New Year’s
   Eve two-week period (with a preference for the dates to be 23 December 2024 to 5 January
   2025) including drop-off/pick-up, disability permit holders, scooter/motorbike, Council lifeguards,
   emergency services vehicles, NYE rapid response area, and additional facilities such as waste
   collection, temporary toilet block etc;
G. Note that a Parking Management Plan, including a Local Parking Plan for Noosa Heads is under
   preparation and a Movement and Place study is proposed for the 2025/26FY, that closely
   considers carparking and circulation in the Main Beach locality including future use of the Noosa
   Heads Lions Park, the Noosa Heads Bus Station, the Maze Carpark and the Main Beach Local
   Government Reserve which will wholistically consider the uses, design and circulation within
   these critical spaces for Noosa Heads and will be subject to community engagement; and
H. Note that Council’s resolution on 13 September 2021 that allowed the concept of a one-way
   "Local Loop" with Bus Priority Lane, from Noosa Drive to Noosa Parade be referred to a
   Councillor workshop to encourage bus usage and frequency.

Finance




                                                                                                 Page 7 of 93

Page 8

GENERAL COMMITTEE MEETING                                                          20 JANUARY 2025


The Transport Levy currently operates at a deficit, with funds raised not matching annual costs. The
shortfall is funded from general revenue. The report recommendations are seeking to reduce costs
through timely review of existing services, which have opportunity for more cost effective
delivery. Following further review and negotiation full financial benefit can be modelled and included
in budget planning for the FY 25/26.

Risk & Opportunities
The report recommendations seek to address cost risks arising in the Go Noosa Program. There is
an opportunity to redirect released resources and funds to arising and new programs addressing
contemporary transport issues.

Human Rights
Human Rights Compatibility Statement
In developing this Report, the subject matter has been considered in accordance with the
requirements of the Queensland Human Rights Act 2019. It is considered that the subject matter
does not conflict with any human rights and supports a human rights approach to decision making
by Council. Council representatives will endeavour to act and make decisions under this report in a
manner that is compatible with human rights. This report should be read in conjunction with
Council’s Human Rights Policy.

Consultation
External Consultation - Community & Stakeholder
Nil.


Internal Consultation
Departments consulted:
       Office of the CEO, Mayor &         Community Services               Corporate Services
               Councillors
        Mayor & Councillors             Director                        Director
        Chief Executive Officer         Community Development           Financial Services
        Executive Officers              Sport & Active Lifestyles       Fleet
        Community Engagement            Arts & Culture                  Revenue Services
        People & Culture                Community Connection            ICT
        Governance                      Customer Experience             Procurement

                                                                        Commercial Property

        Strategy & Environment          Development & Regulation         Infrastructure Services
        Director                        Director                    x   Director
        Strategy & Sustainability       Development Assessment      x   Infrastructure Planning, Design
                                                                        and Delivery
        Economic Development        &   Local Laws                      Civil and Asset operations
        Destination Management
        Environmental Services          Environmental Health            Waste
        Innovation & Digital Hub        Building & Plumbing             Building & Facilities
                                        Property / Permits              Disaster Management




                                                                                                     Page 8 of 93

Page 9

                                                                                                                                                                                          TED
                                                                                                                                                                                   RELOCA ZONE
                                                                                                                                                                                          G
                                                                                                                                                                                   LOADIN
                                                                                                                                                                    s9
                                                                                                                                                         s8
                                                                                                                                              s7
                                                                                                                                   p3
                                                                                                                        s6
                                                                                                             s5
                                                                                                  p2
                                                                                       s4
                                                                            s3                                                                                700
                                                               p1                                                                                  700
                                                    s2                                                                                  700
                                         s1                                                                                  700




                                  1980
                                                                                                                  700
             2103




                                                                                                       700
                                                                                            700
                                                                                 700
                                                                    700
                                                         700




                                                                                                                                      E
                                              700




                                                                                                                                R I V
                           3755




                                                                                                                        O S A D
                                                                                                                    N O

                                                                                                                                                  O NE - T               AXI
                                                                                                                                        ICK U P Z
                                                                                                                                    P
                                                                                                                  RAILING
                                                                     2504




                                                                                                                                                                Rev B - 09/01/2024
PSM 162075




                                                                                                                                                                Rev A - 18/12/2024
                                                                                                             B
                    9904




                                                                                                                                                         PLANTERS W 1M X D 0.5M X H 0.5M
                                                                                                                                                         SANDSTONE BLOCKS W 1M X D 0.5M X H 0.5M


                                                                                                                                              NOOSA HEADS - GO NOOSA
                                                                                                                                                   0     1      2              5            10m

                                                                                                                                                                     Scale 1:100 @ A3

                                                                                                                                                                                                  Page 9 of 93

Page 10

GENERAL COMMITTEE MEETING                                                         20 JANUARY 2025


8.2     CONTRACT NO. RP00073 REGISTER OF PRE-QUALIFIED SUPPLIERS FOR
        PROVISION OF PARKS AND LANDSCAPING SERVICES


Author              Parks and Streetscapes Coordinator, Geordie Lascelles
                    Civil Assets & Operations | Infrastructure Services Department
Index               ECM / Contracting / Contractors & Consultants
                    ECM / Project & Contract / RP00073 Register of Pre-Qualified Suppliers for
                    Provision of Parks and Landscaping Services / Reports to Council
Attachments         1.   Attachment 1 - RP000073 (Refresh) - Evaluation Workbook


EXECUTIVE SUMMARY
In November 2022, the Council resolved to approve Contract No. RP00073 Register of Pre-Qualified
Suppliers (ROPS) for Provision of Parks and Landscaping Services for a total of five terms of twelve
(12) months each, total of five (5) years ending 30 November 2027. The ROPS consisted of sixteen
(16) suppliers across the following categories:
      1. Landscape Construction and Maintenance Services
      2. Irrigation and Watering
      3. Turf and Turf Care Services
      4. Minor Mowing and Slashing Services
      5. Landscape Management and Supervision Services
In this instance it has been determined prudent to seek a further refresh of this ROPS by inviting
new suppliers to be added to the ROPS to give Council more contractor resources to perform the
services. Suppliers who have already been selected as a pre-qualified supplier under the ROPS
need not to submit a tender in response to this invitation unless the supplier wished to change some
aspect of their offering.

Strategic Procurement Plan and Probity Plan was developed.

In accordance with Council Procurement Policy and procedure, an Invitation to Tender (ITT) was
initiated and attracted twenty-two (22) responses. Whilst Council encouraged all capable suppliers
to tender, Council intends to utilise this ROPS to encourage the development of competitive local
business and industry. This may result in Council giving preference to local suppliers over non-local
suppliers when engaging suppliers from the ROPS.

This ROPS is a register of suppliers that are pre-qualified and capable of responding to the Council’s
requirements in a timely manner; and where the Council can either:
      1. directly engage a supplier from the ROPS on an as required basis utilising the rates provided
         within the Schedule of Pricing or on other rates as agreed; or
      2. request quote(s) from one or more suppliers on the ROPS on an as required basis for fixed
         term services utilising the rates provided within the Schedule of Pricing or on other rates or
         lump sum price as agreed.
Inclusion onto this ROPS does not provide a guarantee of work during the term of this Contract. The
tender evaluation panel completed the evaluation process and considered 16 new suppliers listed to
be added to the existing list of suppliers. With the addition of these refreshed new suppliers, the
ROPS will now consist of a total 31 suppliers.

RECOMMENDATION



                                                                                                 Page 10 of 93

Page 11

GENERAL COMMITTEE MEETING                                                          20 JANUARY 2025


That Council note the report by the Parks and Streetscapes Coordinator to the General Committee
Meeting dated 20 January 2025 and
A. Approve the award of Contract No. RP00073 for the Register of Pre-qualified Suppliers for the
   Provision of Parks and Landscaping Services {Refresh} for a period of twelve (12) months to 30
   November 2025, and that the following suppliers will be in addition to the existing list of suppliers
   on this ROPS:
   •   Ace Landscapes Qld Pty Ltd
   •   Advanced Pump and Filtration Solutions
   •   Austspray Environmental Weed Control Pty Ltd
   •   Barung Landcare Assn Inc
   •   Coast Care Landscaping Co Pty Ltd
   •   Element Queensland Pty Ltd
   •   Global Turf Projects (Qld) Pty Ltd
   •   Living Turf
   •   New Start Australia Pty Ltd
   •   Palmwoods Revegetation
   •   The Pump House Group Pty Ltd
   •   Regal Innovations Pty Ltd
   •   Skyline Landscape Services (Qld) Pty Ltd
   •   South East Agricultural and Landscape Services Pty Ltd
   •   Suregreen Pty Limited
   •   Turf & Landscape Specialists Pty Ltd
B. Subject to satisfactory performance of the suppliers, authorise the CEO to approve the option to
   extend the contract at the expiry of this term for a further two (2) terms of up to twelve (12)
   months each ending on 30 November 2027.

REPORT
1. Background
Council’s current Contract ROPS for Provision of Parks and Landscaping Services (Contract
No.RP00073) is scheduled to expire on 30 November 2027 (including extension options). This ROPS
arrangement included 16 suppliers in November 2022. Approximate historical expenditure for this
ROPS is as follows:

Financial Year       Invoiced Value
2022 / 2023          $71.7k
2023 / 2024          $269.5k
2024 / 2025          $209.5k

In accordance with Part 3 of the Local Government Regulations and Council Procurement Policy,
Council invited written tenders for the refresh of the ROPS Contract No. RP00073 for Provision of
Parks and Landscaping Services. The ITT was issued as a schedule of rates contract. Council invited
written tenders via the Council VendorPanel e-portal on 21 October 2024 and advertised the tender
on Council’s webpage on 21 October 2024 and within the Noosa Today publication on 25 October



                                                                                                  Page 11 of 93

Page 12

GENERAL COMMITTEE MEETING                                                       20 JANUARY 2025


2024, with responses closing on 12 November 2024.

Twenty-two (22) responses were received within the VendorPanel e-portal from the following
suppliers in alphabetical order:
   •   Ace Landscapes Qld Pty Ltd
   •   Advanced Pump And Filtration Solutions
   •   Anchored Plumbing Co.
   •   Austspray Environmental Weed Control Pty Ltd
   •   Barung Landcare Assn Inc
   •   Canasta Holdings Pty Ltd t/as LD Total (Existing Supplier)
   •   City Coastal Rural Pty Ltd
   •   Coast Care Landscaping Co Pty Ltd
   •   Ecomyhome Pty Ltd
   •   Element Queensland Pty Ltd
   •   Global Turf Projects (Qld) Pty Ltd
   •   Hoyles Landscape Management – (Existing supplier)
   •   Living Turf
   •   New Start Australia Pty Ltd
   •   Palmwoods Revegetation
   •   Regal Innovations Pty Ltd
   •   Skyline Landscape Services (Qld) Pty Ltd
   •   South East Agricultural And Landscape Services Pty Ltd
   •   Suregreen Pty Limited
   •   The Pump House (Existing Supplier but with a change of ownership)
   •   The Trustee For The Pennell Family Trust (Naturezone) (Existing Supplier)
   •   Turf & Landscape Specialists Pty Ltd

2. Tender Evaluation
The ITT sought to have a list of suppliers that held Public and Product Liability Insurance, Workers
Compensation – WorkCover (where applicable), Third Party and Comprehensive MV Insurance for
all services sought.

All suppliers recommended for inclusion to the ROPS complied with the above licencing and
qualification requirements.

The ITT sought a schedule of rates and submissions on the evaluation criteria. The suppliers were
then evaluated against the following evaluation criteria:

Criteria
Technical, Financial Respondent MUST provide evidence in the response to suggest that the
and Managerial       respondent does have the necessary Technical and Managerial Capability
Capability




                                                                                              Page 12 of 93

Page 13

GENERAL COMMITTEE MEETING                                                       20 JANUARY 2025


                     necessary to perform contracts on time and in accordance with agreed
                     requirements.
                    Must provide details of Health & Safety Management System and complete
Health and Safety – the questionnaire provided within the tender suite.
Management           Respondent MUST provide evidence in the response to suggest that the
Systems             respondent, if engaged to perform the contract, would provide the services to
                    Council in compliance with the Workplace Health and Safety legislation.
                     Must provide details of Zero Emission Initiatives and complete the
                     questionnaire provided within the tender suite.
Environment and       Respondent MUST provide evidence in the response to suggest that the
Sustainability       respondent, if engaged to perform the contract, would provide the services to
                     Council that identifies strategies to assist Council meeting the Zero Emissions
                     Organisational Strategy 2016 – 2026 targets.
                     MUST provide schedule of rates.
                     Respondent MUST provide evidence in the response to suggest that the
Price
                     respondent, if engaged to perform the contract, would provide value for
                     money.

The evaluation was conducted by the Evaluation Panel consisting of the Parks and Streetscapes
Coordinator, Parks and Gardens Technical Officer, Parks Supervisor, Community Development
Officer – Sport and Recreation, Workplace Health and Safety Officer.
Each member of the Evaluation Panel read and declared that they understood and accepted the
probity requirements, which includes a declaration of conflicts of interest and confidentiality.

Of the twenty-two (22) Respondents, three (3) Respondents are not recommended for inclusion,
three (3) Respondents are existing suppliers with a change to rates, and the remaining 16
Respondents are recommended for acceptance on the ROPS (one (1) Respondent has had a
change of ownership).

The 3 (three) Respondents not recommended for inclusion are:
   •    Anchored Plumbing Co.
   •    City Coastal Rural Pty Ltd
   •    Ecomyhome Pty Ltd
Attachment 1 – Evaluation Workbook presents the evaluation outcome.

The existing active suppliers on the ROPS that shall extend are as follows:
   •    AVM Operations Pty Ltd t/as All Vegetation Management
   •    APG Group Pty Ltd t/as Aussie Parks & Gardens Group
   •    TTF Allofus Family Trust t/as Complete Turf Management
   •    Creative Playground Surfaces Pty Ltd
   •    S.C.L Services Pty Ltd t/as Disc Landscapes
   •    TTF GLG Greenlife Group Unit Trust t/as GLG Greenlife Group
   •    Green Options Pty Ltd
   •    Canasta Holdings Pty Ltd t/as Greenwood Landscape Management (LD Total)
   •    SG Montague & JM Wallis t/as Hoyles Landscape Management
   •    Hydromulch Solutions Pty Ltd TTF Outside the Box t/as Hydromulch Solutions




                                                                                               Page 13 of 93

Page 14

GENERAL COMMITTEE MEETING                                                        20 JANUARY 2025


    •   TTF The Pennell Family Trust t/as Nature Zone
    •   Ranges to Reef Environmental Service Pty Ltd
    •   The Maintenance Company Pty Ltd
    •   Irrigation Centre Pty Ltd t/as Think Water Noosa
    •   Wagners CFT Manufacturing Pty Ltd
The Pump House Unit Trust t/as The Pump House business has had a change of ownership recently
and therefore re-submitted a tender for inclusion to this arrangement as The Pump House Group
Pty Ltd.

3. Next Steps
Contract documents shall be issued to the suppliers recommended for inclusion to the ROPS, and
all suppliers will be required to register and maintain their details in the VendorPanel e-portal to
ensure insurances are maintained.

The ROPS is a register of suppliers that are pre-qualified and capable of responding to the Council’s
requirements in a timely manner; and where the Council can either:
•   directly engage a supplier from the ROPS on an as required basis utilising the rates provided
    within the Schedule of Pricing or on other rates as agreed; or
•   request quote(s) from one or more suppliers on the ROPS on an as required basis for fixed term
    services utilising the rates provided within the Schedule of Pricing or on other rates or lump sum
    price as agreed.
Inclusion onto this ROPS does not provide a guarantee of work to suppliers during the term of this
Contract.

Suppliers shall be engaged under this ROPS applying the Panel Management Plan as a guide. The
Panel Arrangement Management Plan is used by contract managers to document all key information
about how the ROPS will be utilised.

Link to Corporate Plan

Theme No. 2 - Liveability

Liveability encompasses housing, facilities and services, transport, health and wellbeing to enable
an inclusive, connected and vibrant community.
2.2 Fund and deliver accessible and improved, parks, open spaces, walking and cycle paths and
trails, including greening our paths and cycleways to meet contemporary needs.


Previous Council Consideration
Ordinary Meeting Minutes 17 November 2022
That Council note the report by the Parks and Gardens Coordinator to the Services & Organisation
Committee Meeting dated 8 November 2022 and
A. Award Contract No. RP00073 for a Register of Pre-qualified Suppliers for the Parks
and Landscaping Services for a period of twelve (12) months commencing on 1 December 2022 to
the following suppliers:
    • AVM Operations Pty Ltd t/as All Vegetation Management
    •   APG Group Pty Ltd t/as Aussie Parks & Gardens Group
    •   TTF Allofus Family Trust t/as Complete Turf Management




                                                                                                Page 14 of 93

Page 15

GENERAL COMMITTEE MEETING                                                            20 JANUARY 2025


   •   Creative Playground Surfaces Pty Ltd
   •   S.C.L Services Pty Ltd t/as Disc Landscapes
   •   TTF GLG Greenlife Group Unit Trust t/as GLG Greenlife Group
   •   Green Options Pty Ltd
   •   Canasta Holdings Pty Ltd t/as Greenwood Landscape Management
   •   SG Montague & JM Wallis t/as Hoyles Landscape Management
   •   Hydromulch Solutions Pty Ltd TTF Outside the Box t/as Hydromulch Solutions
   •   TTF The Pennell Family Trust t/as Nature Zone Landscaping & Property Maintenance
   •   Ranges to Reef Environmental Service Pty Ltd
   •   The Maintenance Company Pty Ltd
   •   TTF The Pump House Unit Trust t/as The Pump House
   •   Irrigation Centre Pty Ltd t/as Think Water Noosa
   •   Wagners CFT Manufacturing Pty Ltd.
B. Subject to satisfactory performance of the suppliers, authorise the CEO to approve the option to
extend the contract at the expiry of initial term for a further four (4) terms of up to twelve (12) months
each ending on 30 November 2027.
C. Authorise the CEO to approve the addition of new suppliers to Contract No. RP00073 for the
Register of Pre-qualified Suppliers for Parks and Landscaping Services as a result of an advertised
refresh at the expiry of the initial term and term extensions.

Finance
Parks and Landscaping services are engaged on an as needs basis under a schedule of rates
utilising existing budget from capital and operational expenditure. Historical expenditure for services
was up to $269.5k per year, and it is anticipated that the expenditure on this ROPS will continue to
be up to $300k per year.

Risk & Opportunities
The establishment of a ROPS reduces the risks associated with engaging these services ensuring
that approved suppliers have the appropriate insurances.

The ROPS also is an effective way to reduce the workload on both Council and contractors to
undertake work in a timely manner, while still ensuring compliance with Council’s Procurement
Policy.

The development of a Panel Management Plan will provide internal staff guidance in relation to the
selection of contractors from the panel and assessment of contractor performance.

 Safety Risks                                         Mitigation
 The Suppliers fail to ensure the work is conducted   Prior to commencement of services, the Suppliers
 safely and in accordance with minimum standards.     management plans, Safe Work Method Statements,
                                                      Job Hazard Analysis (or similar) and other
                                                      documentation will be submitted, reviewed, and
                                                      accepted by Council.

                                                      Council will undertake surveillance, regular safety
                                                      audits and inspections throughout the service
                                                      delivery period.




                                                                                                    Page 15 of 93

Page 16

GENERAL COMMITTEE MEETING                                                               20 JANUARY 2025



 Resource Risks                                         Mitigation
 Quality, safety, and service are affected due to       The     Suppliers    have     nominated    capable
 resource shortages.                                    personnel for the services sought here and can add
                                                        additional and appropriately skilled resources as
                                                        required.
                                                        Council can engage the services of Suppliers of this
                                                        ROPS in the event of a Supplier being unable to
                                                        supply services. Council will regularly monitor any
                                                        patterns where the Suppliers are unable to provide
                                                        trade services as required, and review as per
                                                        conditions of contract.

Human Rights
Human Rights Compatibility Statement
In developing this Report, the subject matter has been considered in accordance with the
requirements of the Queensland Human Rights Act 2019. It is considered that the subject matter
does not conflict with any human rights and supports a human rights approach to decision making
by Council. Council representatives will endeavour to act and make decisions under this report in a
manner that is compatible with human rights. This report should be read in conjunction with
Council’s Human Rights Policy.

Consultation
External Consultation - Community & Stakeholder
Nil


Internal Consultation
Departments consulted:
      Office of the CEO, Mayor &         Community Services                     Corporate Services
              Councillors
       Mayor & Councillors             Director                              Director
       Chief Executive Officer         Community Development                 Financial Services
       Executive Officers              Sport & Active Lifestyles             Fleet
       Community Engagement            Arts & Culture                        Revenue Services
  x    People & Culture                Community Connection                  ICT
       Governance                      Customer Experience              x    Procurement

                                                                             Commercial Property

       Strategy & Environment          Development & Regulation               Infrastructure Services
       Director                        Director                          x   Director
       Strategy & Sustainability       Development Assessment                Infrastructure Planning, Design
                                                                             and Delivery
       Economic Development        &   Local Laws                        x   Civil and Asset operations
       Destination Management
       Environmental Services          Environmental Health                  Waste
       Innovation & Digital Hub        Building & Plumbing                   Building & Facilities
                                       Property / Permits                    Disaster Management




                                                                                                          Page 16 of 93

Page 17

                                                                                                                                                                                Evaluation


                                                                Attachment 1
              NOOSA SHIRE COUNCIL                               Weighted Attribute Evaluation Spreadsheet - Evaluation
                          Contract Title:                       Register of Pre-qualified Suppliers for Parks and Landscaping Services
                             Contract No:                       RP00073

     If the Evaluation Panel’s final assessment is that the response to any of the evaluation criteria assessment questions is ‘NO’ then the Evaluation Panel will consider if the Supplier’s inability to meet the criteria is limited. Where this is agreed to be the case, the Evaluation
     Panel may still assess the Supplier as suitable for appointment.

                                                                  Technical, Financial and Managerial                   Health & Safety – Management
          Criteria                                                                                                                                                           Environment & Sustainability                                         Price
                                                                               Capability                                         Systems


                                                                                                                                                                        Must provide details of Zero Emission Initiatives
                                                                                                                         Must provide details of Health & Safety
                                                                                                                                                                        and complete the questionnaire provided within
                                                                                                                         Management System and complete the
                                                                   Respondent MUST provide evidence in the
                                                                                                                     questionnaire provided within the tender suite.
                                                                                                                                                                                        the tender suite.                            MUST provide schedule of rates.            Comments
                                                                 response to suggest that the respondent does                                                             Respondent MUST provide evidence in the                Respondent MUST provide evidence in the
         NAME OF TENDERER                                        have the necessary Technical and Managerial
                                                                                                                      Respondent MUST provide evidence in the
                                                                                                                                                                          response to suggest that the respondent, if            response to suggest that the respondent, if
     No.
                                                                                                                       response to suggest that the respondent, if                                                                                                                                                                                              Accept
          (Conforming Tenders Only)                             Capability necessary to perform contracts on time                                                       engaged to perform the contract, would provide         engaged to perform the contract, would provide
                                                                                                                    engaged to perform the contract, would provide
                                                                  and in accordance with agreed requirements.                                                          the services to Council that identifies strategies to                 value for money?
                                                                                                                     the services to Council in compliance with the
                                                                                                                                                                          assist Council meeting the Zero Emissions
                                                                                                                        Workplace Health and Safety legislation.
                                                                                                                                                                         Organisational Strategy 2016 – 2026 targets.


      1 Ace Landscapes Qld Pty Ltd                                                   YES                                                YES                                                   YES                                                  YES                                                                                                          YES
                                                                                                                                                                                                                                                                                Sole operator, based locally, limited H&S and Env docs but are proven long
      2 ADVANCED PUMP AND FILTRATION SOLUTIONS                                       YES                                                YES                                                   YES                                                  YES                          term local supplier with good capability for the Irrigation scope               YES

      3 Anchored Plumbing Co.                                                         NO                                                 NO                                                    NO                                                  NO                           no documentation provided (trade services panel check)                          NO

      4 Austspray Environmental Weed Control Pty Ltd                                 YES                                                YES                                                   YES                                                  YES                          WHS questionnaire provided 26/11                                                YES

      5 Barung Landcare Assn Inc                                                     YES                                                YES                                                   YES                                                  YES                                                                                                          YES
                                                                                                                                                                                                                                                                                Already on ROPS (LD Total), rate increase for trade and labour, rate decrease
      6 Canasta Holdings Pty Ltd                                                                                                                                                                                                                   YES                          for apprentice                                                                  Exist

      7 City Coastal Rural Pty Ltd                                                    NO                                                 NO                                                   YES                                                  YES                          WHS questionnaire incomplete, limited capability                                NO

      8 Coast Care Landscaping Co Pty Ltd                                            YES                                                YES                                                   YES                                                  YES                          WHS questionnaire provided 25/11                                                YES

      9 Ecomyhome Pty Ltd                                                            YES                                                 NO                                                    NO                                                  YES                          Limited documentation provided. no WHS questionnaire                            NO

     10 Element Queensland Pty Ltd                                                   YES                                                YES                                                   YES                                                  YES                                                                                                          YES

     11 Global Turf Projects (Qld) Pty Ltd                                           YES                                                YES                                                   YES                                                  YES                          no WHS questionnaire, provided 26/11                                            YES

     12 Hoyles Landscape Management                                                                                                                                                                                                                YES                          Already on ROPS, new rates submitted.                                           Exist

     13 LIVING TURF                                                                  YES                                                YES                                                   YES                                                  YES                          One Q missed in WHS questionnaire.                                              YES

     14 New Start Australia Pty Ltd                                                  YES                                                YES                                                   YES                                                  YES                          Pricing provided 25/11                                                          YES

     15 Palmwoods Revegetation                                                       YES                                                YES                                                   YES                                                  YES                                                                                                          YES

     16 Regal Innovations Pty Ltd                                                    YES                                                YES                                                   YES                                                  YES                          no WHS example plans provided, clarification sent 26/11                         YES

     17 Skyline Landscape Services (Qld) Pty Ltd                                     YES                                                YES                                                   YES                                                  YES                          No presence in Sunshine Coast region                                            YES
          South East Agricultural And Landscape Services Pty
     18
          Ltd
                                                                                     YES                                                YES                                                   YES                                                  YES                                                                                                          YES

     19 Suregreen Pty Limited                                                        YES                                                YES                                                   YES                                                  YES                                                                                                          YES

     20 The Pump House                                                               YES                                                YES                                                   YES                                                  YES                                                                                                          YES

     21 The Trustee For The Pennell Family Trust (Naturezone)                                                                                                                                                                                      YES                          Already on ROPS, WHS docs out of date                                           Exist

     22 Turf & Landscape Specialists Pty Ltd                                         YES                                                YES                                                   YES                                                  YES                          Clarify for missing WHS docs, provided 27/11.                                   YES


          Evaluation Panel                                                       Position Title
                                                                                                                                               The Evaluation Panel Chair confirms the
          Evaluation Panel Chair & Member 1                           Parks & Gardens Coordinator (GL)                                                    above evaluation
          Evaluation Panel Member 2                              Technical Officer - Parks and Gardens (GC)
          Evaluation Panel Member 3                                          Parks Supervisor (JV)                                                 Evaluation Chair's signature:                                       Parks & Gardens Coordinator (GL)
          Evaluation Panel Member 4                               Community Dev Officer - Sport & Rec (AT)
          Evaluation Panel Member 5                                 Workplace Health & Safety Officer (SP)




RP000073 (Refresh) - Evaluation Workbook_(0. Master).xlsx                                                                                                                         Page 1                                                                                                                                                                             06-01-25
                                                                                                                                                                                                                                                                                                                                                                     Page 17 of 93

Page 18

GENERAL COMMITTEE MEETING                                                       20 JANUARY 2025


8.3     COMMUNITY GRANTS POLICY - REVISED


Author            Community Connections Manager, Alison Hamblin
                  Community Services Department
Index             ECM/26.17 Community Funding/Grants
Attachments       1.   Attachment 1 - Community Grants Policy for Endorsement


EXECUTIVE SUMMARY
The Community Grants Program was created so Council can support local not-for-profit
organisations to deliver important projects and events, build organisational capacity, and develop
and maintain local community infrastructure. Funded projects help deliver on Council’s strategic
goals and key initiatives identified in the Noosa Council Corporate Plan, Noosa Council Social
Strategy 2015 and other subordinate strategies and plans.

The Community Grants program has been running in its current form since 2014 with minor changes.
The Community Grants Policy was revised and adopted in May 2020. Since inception, interest in the
program has been high and is always fully subscribed in each financial year.

A review was commissioned in 2023 to understand whether the community grants program is
responding to the needs of the community and delivering on Council's strategies and policies and
their desired outcomes whilst also providing best practice community grants management. The
Community Grants Policy was reviewed as part of this process.

The review included consultation with a range of stakeholders including community organisations,
external grants makers, staff and Councillors. The review identified key issues and made a series of
recommendations which have informed the policy revisions and relevant guidelines. The resultant
revised Community Grants Policy is now reflective of contemporary grants management practices.

RECOMMENDATION
That Council note the report by the Community Connection Manager to the General Committee on
the 20 January 2025 and approve the revised Community Grants Policy provided at Attachment 1 to
the report.


REPORT
This report seeks Council’s approval to amend the Community Grants Policy following a
comprehensive review of the program's governance, practices, purpose and impact.

1. Background
 Noosa Council provides a range of services to support not-for-profit organisations to meet
community needs in the Noosa Shire. These services include assisting organisations to obtain
additional funds through the Community Grants Program (including RADF) which are funded through
the annual budget process, promoting external grant opportunities and providing advice and help for
organisations to apply for non-Council grant opportunities.

The Community Grants Program has been operating largely in its current form since de-
amalgamation in 2014 with some minor changes. It provides funding for non-for-profit organisations
to conduct a variety of initiatives that benefit Noosa residents, including facility upgrades, new
equipment, community event and projects that enhance social inclusion and wellbeing. From 2015
to 2024 there has been over 800 applications received by Noosa Council and over $10 million




                                                                                              Page 18 of 93

Page 19

GENERAL COMMITTEE MEETING                                                       20 JANUARY 2025


distributed to eligible community organisations. The grant program aligns with Council's Corporate
Plan 2023–2028, the Noosa Social Strategy 2015, and supporting strategies such as the Sport and
Active Recreation Plan and the Cultural Plan. These initiatives aim to address human social needs,
strengthen community connections and build resilience.

The Grants Program is administered by the Community Development team under a range of policies,
guidelines and procedures. The guiding policy document for the program is the Community Grants
Policy which was last reviewed by Council in May 2020.

2. Community Grants Program Review
In 2023, Council initiated a review of key policies and practices that support Noosa’s community
organisations, including the Community Grants Program and the Community Land Tenure Policy.
The Grants Program review evaluated governance, practices, purpose and impact and is aimed to
ensure that Council continues to effectively address community needs while delivering on its
strategies, policies and desired outcomes. The review was led by the Community Development team
and included support by an external contractor. It incorporated stakeholder consultation, an
assessment of other local government funding programs and consideration of resources which
included the 0.6 part-time Grants Administrator and an annual budget allocation of approximately $1
million.

The review focused on several key areas:
1. Governance: Evaluating the application of best practices, relevant legislation, and regulations to
   ensure the Community Grants Policy, program structure, and internal processes are current,
   effective at meeting the aims of the program and reduce unnecessary complexity.
2. Community Effectiveness: Identifying ways to increase community engagement with the
   program, addressing the challenges organisations face when applying for grants, and ensuring
   the program delivers strong outcomes and a return on investment.
3. Efficient Resource Allocation: Exploring the most efficient use of limited resources.
4. Maximising Funding: Ensuring that the Community Grants Policy and Program complements,
   rather than duplicates, other ongoing internal and external funding sources, such as Council's
   other grant programs, Tourism Noosa's grant funding, Gambling Community Benefit Fund, and
   relevant State Government funding.
The review did not cover changes to the overall budget allocation for the grants program or the
operational management of external funding sources. It also did not explore non-grant funding
mechanisms such as loans or other financial assistance.

The review involved engagement with both internal and external stakeholders and was benchmarked
against best practices and community grants policies from other councils. This helped to identify
areas for improvement and ensure the updated program aligns with community needs and Council’s
strategic objectives. Based on the findings, amendments to the Community Grants Policy and
structure were made, reflecting the changes that were reviewed and recommended to enhance
efficiency, equity and transparency.

3. Review Outcomes
The review found that the Community Grants Program is highly regarded by local not-for-profit
organisations. The program received generally positive feedback from both internal and external
stakeholders, particularly regarding the support provided by Council officers. Many community
organisations highlighted that the grants were essential for delivering projects and initiatives that
might not have been feasible without Council funding. These projects strengthened local networks,
promoted cultural and social inclusion, and delivered tangible benefits, such as improved community
facilities and increased accessibility. The review also recognised the program's role in encouraging
collaboration, as numerous grant recipients partnered with other organisations to maximise impact
and share resources.




                                                                                               Page 19 of 93

Page 20

GENERAL COMMITTEE MEETING                                                        20 JANUARY 2025



Additionally, the streamlined application process, introduced during recent program minor reviews,
was positively received by applicants. Feedback indicated that the simplified format reduced
administrative barriers and made the program more accessible to smaller community groups with
limited resources. This helped broaden the diversity of projects and applicants, aligning the grants
with Council’s overarching equity objectives.

The review also identified some areas for improvement. It found that the Community Grants Program
is not fully aligned with the Council’s current priorities, due to its reliance on the outdated Social
Strategy. Updating this strategy will ensure the program remains relevant and responsive to
emerging community needs.

There was also strong demand for ‘always open’ quick response grants to cater for emerging
opportunities and emergencies, along with strengthening the collaborative approach to driving
further dollars into Noosa community groups.

There was also a clear desire to reduce red tape. Some community organisations found the
application process overly difficult and expressed a preference for more streamlined procedures.
Feedback suggested the use of digital tools to simplify submissions, improve communication and
automate routine tasks. In addition, clearer guidelines, user-friendly templates, and more tailored
workshops could help applicants overcome common challenges and encourage wider participation.

4. Revised Community Grants Policy
One of the key recommendations of the Grants Program review was to revise and update the
Community Grants Policy which helps govern the administration of the Community Grants Program.

The revised Community Grants Policy was developed through a consultative process to ensure it
supports current community needs and aligns with Council priorities and procedures. The process
included a thorough review of feedback from stakeholders, including grant applicants, community
organisations and Council staff. Workshops and focus groups were conducted to gather diverse
perspectives, while benchmarking against best practices from other councils helped identify
opportunities for improvement. Input from these engagements informed the drafting of a policy that
prioritises transparency, equity and accessibility.

The revised policy provides a framework to guide the administration of the Community Grants
Program, ensuring that grants:
•   Support Council in achieving its strategic goals and key objectives; and
•   Align with the Local Government Act 2009 and Local Government Regulation 2012, which
    require that community grants serve a purpose in the public interest.
This policy is designed to be read alongside the supporting guidelines for each individual funding
programs and does not apply to sponsorships, donations, advertising, naming rights or service-level
agreements.

The revised policy contains two main types of changes - program and procedural changes.

Grant Program Changes
Signature Community Events: The Festive Season and Signature Events programs will be combined
into a single program.
Individual Sports Development Grants: The review proposes the introduction of individual Sports
Development Grants to assist Noosa residents who are performing, competing or coaching at
recognised national or international competitions and events.
Quick Response Grants: The ability to provide quick response grants will be made available for both
community grants and RADF grants, similar to the way that Economic Development grants are
offered.




                                                                                                Page 20 of 93

Page 21

GENERAL COMMITTEE MEETING                                                       20 JANUARY 2025



Procedural Changes
Flexibility: The policy is less prescriptive, allowing updates to guidelines to address emerging
community needs and changing procedural requirements.
Smaller Grants: Grants under $2,500 that are supported by the moderation panel will now be
approved by a delegated officer instead of coming to Council for endorsement. This will enable quick
response grants for emergent situations to be offered.
Compliance: The policy incorporates new Code of Conduct and Human Rights statements.
Legislation: Updates have been made to reflect the most current relevant documents and legislation.
Wording: Consolidation and minor word changes to the policy to maintain consistency with other
Council grant policies.
These updates aim to make the grants process more accessible, responsive, and aligned with
community and strategic needs, while building strong partnerships and building capacity across
Noosa.


Link to Corporate Plan

Theme No. 2 - Liveability
Liveability encompasses housing, facilities and services, transport, health and wellbeing to enable
an inclusive, connected and vibrant community.

Theme No. 3 - Prosperity
Focus areas include economic development, local business, innovation, arts and culture, waste and
a circular economy.

Theme No. 4 - Future
This theme is focused on our future, strengthening our relationship with First Nations peoples and to
ensure our community is prepared and resilient to change. A focus on youth, climate resilience and
adaptation, sense of place and destination management.

Theme No. 5 - Excellence
This theme focuses on customer experience, financial sustainability, innovation and technology,
levels of service, governance, our employees and volunteers, funding streams and asset
management practices.


Previous Council Consideration
Ordinary Meeting Minutes 21 May 2020
That Council note the report by the Community Services Director and the Community Development
Manager to the Services and Organisation Committee Meeting dated 12 May 2020 regarding the
Community Disaster Response and Recovery Grants Program and:
A. Approve amendments to the Community Grants Policy, by the addition of a Community Disaster
Response and Recovery Grant, as provided at Attachment 1;
B. Allocate the remaining $27,000 from the 19/20 Community Grants budget to the Community
Disaster Response and Recovery Grant category for the purposes of running a rapid response grant
round for community organisations that have immediate essential needs as a result of COVID-19;
C. Delegate the Chief Executive Officer to authorise funding payments to the successful applicants;
and
D. Request the Chief Executive Officer to provide a report on the outcome of the 19/20 Community
Disaster Response and Recovery Grant round at a future Council meeting.




                                                                                               Page 21 of 93

Page 22

GENERAL COMMITTEE MEETING                                                       20 JANUARY 2025



Finance
Council determines the total allocation of funds to the Community Grants Program through its annual
budget process. The FY24/25 community grants budget is $978,496. Each year this budget is
generally raised by CPI rate. The CPI rate that is usually applied to the community grants budget is
the September All Groups Brisbane CPI rate.

To incorporate the Individual Sports Development Grants within the new policy framework, an initial
increase of $5,000 per annum to the overall Community Grants budget will be required as part of the
2025/26 budget process. This adjustment is necessary to ensure adequate support and facilitation
of this additional grant stream.

Risk & Opportunities
Opportunities:
Increased Public Trust: Transparent and equitable policy revisions can build greater trust and
credibility with community stakeholders.
Stronger Collaboration: Opportunities to expand partnerships with external funding providers and
community groups may arise, leading to more innovative and impactful projects.
Encouragement of New Applicants: Simplifying the application process or introducing clearer
guidelines could encourage participation from groups that have not previously applied.
Flexibility: The new policy framework for adapting to emerging community needs or addressing gaps
in service delivery

Risks:
Reduced Engagement/Negative feedback: If the amended policy is not well-communicated in a
positive way, community groups might disengage, leading to a decrease in applications or
collaboration.

Human Rights
Human Rights Compatibility Statement
In developing this Report, the subject matter has been considered in accordance with the
requirements of the Queensland Human Rights Act 2019. It is considered that the subject matter
does not conflict with any human rights and supports a human rights approach to decision making
by Council. Council representatives will endeavour to act and make decisions under this report in a
manner that is compatible with human rights. This report should be read in conjunction with
Council’s Human Rights Policy.


Consultation
External Consultation - Community & Stakeholder




                                                                                              Page 22 of 93

Page 23

GENERAL COMMITTEE MEETING                                                              20 JANUARY 2025


Internal Consultation
Departments consulted:

     Office of the CEO, Mayor &               Community Services               Corporate Services
             Councillors
 x    Mayor & Councillors               x   Director                        Director
 x    Chief Executive Officer           x   Community Development       x   Financial Services
      Executive Officers                x   Sport & Active Lifestyles       Fleet
      Community Engagement              x   Arts & Culture              x   Revenue Services
      People & Culture                  x   Community Connection            ICT
 x    Governance                        x   Customer Experience             Commercial Property
     Strategy & Environment &               Development & Regulation        Infrastructure Services
     Sustainable Development
      Director                              Director                        Director
      Strategic Land Use Planning           Development Assessment          Infrastructure Planning, Design
                                                                            and Delivery
 x    Economic Development          &       Local Laws                      Civil and Asset operations
      Destination Management
 x    Environmental Services                Environmental Health            Asset Management
      Innovation & Digital Hub              Building & Plumbing             Building & Facilities
                                        x   Property / Permits              Disaster Management
                                                                            Waste




                                                                                                         Page 23 of 93

Page 24

Attachment 1




                                                                                 Council Policy

                                                              COMMUNITY GRANTS

           Corporate Plan Reference:                   Theme 2: Liveability

           Endorsed by Council:

           Policy Author:                              Community Connection Manager


         POLICY PURPOSE
         The purpose of this Policy is to guide the administration of Council’s Community Grants to
         ensure grant programs assist Council to achieve its strategic goals and identified initiatives. It is
         aligned with the intent of the Local Government Act 2009 and the Local Government Regulation
         2012.

         This Policy is to be read in conjunction with any supporting guidelines for specific funding
         programs which are published on Council’s website.

         POLICY OUTCOMES
         The outcomes of this policy include:

               •   Providing financial support to community projects that meet identified human social
                   community needs
               •   Building community connection, skills and resilience
               •   Providing opportunities for community projects to leverage Council’s funding assistance
                   to obtain funding from other sources e.g. co-funding
               •   Supporting the community to deliver on Council’s strategic goals and identified key
                   initiatives

         SCOPE
         This Policy applies to Councillors, all Council employees, and volunteers who conduct activities
         and functions on behalf of Council and are involved in the administration and management of
         community grants programs (collectively referred to as ‘employees’).

         REVIEW
         This Policy will be reviewed once per Council term (every four years) or as required from time to
         time.
                                                                                                             1


                                                                                                            Page 24 of 93

Page 25

WHO CAN APPLY
Applicants must meet the specified eligibility criteria outlined in the relevant community grant
guidelines and this Policy. At a minimum, applicants must:

   •   Be an incorporated not-for-profit community organisation, or have an auspice
       arrangement with an incorporated, not-for-profit organisation
   •   Be applying for a project or event which benefits the residents of Noosa Shire
   •   Have no debt to Council, (unless an agreed payment arrangement with Council is
       satisfactorily being met)
   •   Have appropriate insurances
   •   Have successfully acquitted any previous Council Grants

Individuals are eligible to apply through identified programs as outlined in the relevant
guidelines.

WHO CANNOT APPLY
Ineligible applicants are listed in the relevant program’s guidelines and include but are not
limited to:

   •   Local, State or Federal Government agencies/departments
   •   Commercial businesses and enterprises (with the exception of RADF applications)
   •   Foreign entities, such as charity formed or incorporated outside of Australia, even if it is
       registered to carry on business in Australia
   •   Political organisations

ELIGIBLE PROJECTS, EVENTS OR PROGRAMS
Applications for community grants must:

   •   Demonstrate a purpose that is in the public interest
   •   Address the purpose and/or priorities of the grant category identified in the relevant
       guidelines
   •   Align with Council’s priorities as described in current Council strategies and plans
   •   Adhere to the terms and conditions set out in the supporting guidelines for the specific
       funding program

INELIGIBLE PROJECTS
Applications that request funding for:

   •   Religious or faith-based activities
   •   Political or lobbying activities
   •   Primary heath or medical care
   •   Core education or curricula activities
   •   Payment of debt
   •   Projects intended to make a commercial profit
                                                                                                      2


                                                                                                   Page 25 of 93

Page 26

   •   Projects which intend to gift, sponsor or grant the money to another person or entity
   •   Items or services purchased or any project activities delivered prior to notification of the
       grant outcome

Other eligibility restrictions may apply for specific funding programs. Projects that are ineligible
for funding are detailed in the relevant guidelines for each program.

FUNDING PROGRAMS
The below list outlines Council’s various grant funding programs:


 PROGRAM                         DESCRIPTION


                                 Funding for projects, programs, events, equipment purchases and
 Community Project Grants        building/ground works. This may include the option for a quick
                                 response grant for emergent or time-sensitive matters.

                                 Supports local arts and cultural development opportunities by providing
 Regional Arts Development       project-based financial assistance to groups, individuals and
 Fund (RADF)                     businesses. This may include the option for a quick response grant for
                                 time-sensitive items.

 Individual Sport Development    Support Noosa residents who are performing, competing or coaching
 Grants                          at recognised national or international competitions and events.


 Signature Community Events      Supports established not-for-profit organisations to deliver community
 Grants                          events that provide significant benefit to the broader community.

                                 Supports not-for-profit community organisations whose services
 Community Alliance
                                 provide significant benefit to the Noosa community beyond their
 Agreements
                                 membership base.

                                 Support for not-for-profit community organisations that maintain a
 Maintenance Agreements
                                 Council hall or centre, or sports field that is open to the public


 Water Rebates                   Support for not-for-profit community organisations


                                 Supports not-for-profit community organisations that are based on
 Building Insurance Cover
                                 Council land.

 Community Disaster
                                 Supports not-for-profit community groups in their efforts to respond
 Response and Recovery
                                 and recover from natural disasters.
 Grants

                                 Support to address significant identified community need that is
 Other (as required)
                                 outside the standard grant funding rounds.

                                                                                                          3


                                                                                                        Page 26 of 93

Page 27

APPLICATION PROCESS
Specific instructions on how to apply for each program are available in the relevant program
guidelines. Applications must be submitted by the advertised closing date and time. Late or
incomplete applications will not be accepted unless approved by the Community Connection
Manager because of exceptional circumstances.

CONDITIONS OF FUNDING
Successful applicants will be required to enter into a funding deed of agreement with Council.
Any special conditions or requirements will be outlined in this agreement.

Applicants are required to publicly acknowledge Council’s contribution to their project and must
meet the acknowledgement requirements outlined in the program’s guidelines.

Successful applicants are required to acquit their projects within the timeframes specified in the
program’s guidelines. Acquittal requirements for each grant type are outlined in the relevant
guidelines.

Council reserves the right to conduct random audits of grant acquittals to ensure the grant was
used by the recipient according to the funding agreement. All grant recipients must maintain
accurate financial records for their funded projects and make these records available to the
Council as part of their acquittal. Additional financial information may be requested by Council if
selected for an audit.

ROLE AND RESPONSIBILITIES
Councillors

Councillors will consider and adopt Council’s Community Grants Policy.

Councillors will consider and adopt an appropriate budget allocation to support the Community
Grant program

When making decisions related to grant allocations, Councillors will comply with relevant
legislation, Council’s Community Grants Policy and associated guidelines.

Councillors will identify and declare any conflicts of interest in relation to grant decision making
in alignment with their legislative obligations.

Chief Executive Officer (CEO) and Executive Team

The CEO and Executive Team will endorse Council’s Community Grants Policy for Council
adoption and provide leadership and commitment in its implementation, as well as complying
with other relevant legislation and documents.

Council Employees

When managing and assessing grant applications, Council employees will comply with the
Community Grants Policy, program guidelines an associated legislative requirement.


                                                                                                       4


                                                                                                   Page 27 of 93

Page 28

Council employees will identify and declare any conflicts of interest when providing advice to
applicants and assessing grant applications. Council employees will immediately notify their
Supervisor / Manager / Director if they suspect any non-compliance issues or breaches of the
Community Grants Policy.

Community Services Department

 The Department will periodically review Council’s Community Grants Policy, educate
employees on the application of the Policy and provide advice to Council employees on
community grants related matters.

For grants under $2,500, the Department will provide grant recommendations to Council’s
delegated officer for consideration and approval. For grants over $2,500, Council officers will
provide grant recommendations to Council for consideration and approval by resolution.

Grant Applicants

All grant applicants are entitled to a prompt response to their application in accordance with
Council’s Community Grants Policy and to be kept informed of the progress and outcome of the
application.

HUMAN RIGHTS
In developing the Community Grants Policy, the subject matter has been considered in
accordance with the requirements of the Queensland Human Rights Act 2019. It is considered
that the subject matter does not conflict with any human rights, including the right to take part in
public life, and supports a human rights approach to decision making by Council. Council
representatives will endeavour to act and make decisions under this policy in a manner that is
compatible with human rights. In particular, representatives will endeavour to:

   •   Identify relevant human rights which may be affected by the action or decision;
   •   Give proper consideration to the impact of its actions and decisions on human rights;
       and
   •   Ensure that any conduct or decision by Council which limits an individual’s human rights
       is reasonable and justifiable. The Community Engagement Policy should be read in
       conjunction with Council’s Human Rights Policy

RELEVANT DOCUMENTS
   •   Noosa Council Corporate Plan 2023-2028
   •   Noosa Council Annual Operational Plans
   •   Approved budget and revenue statement for the financial year
   •   Associated grant guidelines and application forms

RELEVANT LEGISLATION
   •   Local Government Regulation 2012
   •   Local Government Act 2009
                                                                                                   5


                                                                                                  Page 28 of 93

Page 29

•   Statutory Bodies Financial Arrangements Act 1982
•   Integrity Act 2009
•   Public Sector Ethics Act 1994
•   Public Records Act 2023
•   Right to Information Act 2009




                                                       6


                                                       Page 29 of 93

Page 30

DEFINITIONS

                  The process by which a recipient provides written proof that grant funds were
Acquittal         used according to the funding agreement, ensuring efficient and effective use or
                  demonstrating community value.

                  An organisation that takes responsibility for ensuring grant funds are used as
Auspice           specified, including signing the funding agreement, managing funds, overseeing
                  the project, and ensuring timely acquittal.


Business          An entity engaged in commercial, industrial, or professional activities for profit,
                  including sole traders, companies, or partnerships.


Community         A group of people residing within the Noosa Shire local government area.

Community
Purpose           A purpose that serves the public interest of Noosa Shire residents.

Funding           A legal agreement entered into by the successful applicant and Council noting
Agreement         the obligations of both parties.

                  Funds awarded through a formal program for a specific purpose aligned with
Grant             Council policy, based on merit and subject to a written agreement outlining
                  accountability.

                  Instructions outlining the purpose, key dates, assessment criteria, application
Guidelines        process, and acquittal requirements for a grant.

Individuals       A single person engaged in activities that benefit the community.

Not-for-profit
                  An incorporated organisation focused on providing community services,
community         operating without direct or indirect profit for its members, both during operations
organisation      and upon winding up.

                  Incorporated Associations (under state legislation, often with 'Association,'
                  'Incorporated,' or 'Inc.' in their name); Incorporated Cooperatives (under state
Organisations     legislation, typically with 'Cooperative' in their name); Companies (under the
                  Corporations Act 2001, either proprietary or public); and Aboriginal Corporations
                  (under the Corporations (Aboriginal and Torres Strait Islander) Act 2006).

Public Interest   The welfare of the general public, as opposed to the interests of an individual or
                  group.


Transparency      The openness in administering funds and fulfilling obligations between entities.




                                                                                                        7


                                                                                                        Page 30 of 93

Page 31

Version control:
   Version         Reason/ Trigger                  Change    Endorsed/ Reviewed by    Date
                                                    (Y/N)
   1.0        New Policy                           N         Noosa Council            3 April 2014

   2.0        Policy review after 2 grant rounds   Y         Noosa Council            15 January 2015

   3.0        Policy review after completion of    Y         Noosa Council            11 February 2016
              2015/16 grant rounds
   4.0        Amendment to Policy                  Y         Noosa Council            16 June 2016

   5.0        Amendment to Policy                  Y         CEO                      5 January 2017

   6.0        Amendment to Policy                  Y         Noosa Council            21 February 2019

   7.0        Amendment to Policy                  Y         Noosa Council            21 May 2020

   8.0        Amendment to Policy                  Y         Noosa Council




                                                                                                         8


                                                                                                         Page 31 of 93

Page 32

GENERAL COMMITTEE MEETING                                                         20 JANUARY 2025


8.4     PROCUREMENT ASSESSMENT WORKING TEAM - CONTRACT AWARDS UNDER
        CEO DELEGATION


Author              Director Corporate Services, Trent Grauf
                    Corporate Services Department
Index               43.14 Procurement - Procedures and Guidelines
Attachments         1.   Attachment 1_General Committee Report - PCAWT Contract Awards


EXECUTIVE SUMMARY
In accordance with Council’s Procurement Policy, for any large-sized contractual arrangements
($200,000 excluding GST or more) where the awarding of contract occurs under CEO Delegation
(up to $1,000,000 excluding GST) the process is supported by Procurement Assessment Working
Team (PCAWT) which is convened to provide independent procurement processes review.
Additionally, as per the Policy, additional disclosure requirements have been introduced for the
Director Corporate Services to report these CEO delegated awards to Council bi-annually for noting.

For the period July 2024 – December 2024, nine (9) relevant contracts were awarded under PCAWT
review and CEO delegated approval with a total value of $4.1 million.

RECOMMENDATION
That Council note the report by the Director Corporate Services to the General Committee dated 20
January 2025 regarding contracts awarded under CEO delegation, via the Procurement Assessment
Working Team for the period 1 July 2024 to 31 December 2024.


REPORT
Over recent years market changes coupled with the competition for contractors has meant increased
challenges for local governments in procuring goods and services in a timely manner. As such, the
time it takes to award contracts is critical in Council’s ability to meet growing demands for goods and
services.

In this regard, Council established the Procurement Assessment Working Team (PCAWT) in the
2017/2018 via an Organisational Guideline. The original intention of the PCAWT was to provide
increased review oversight for the awarding of contracts within the CEO delegation of $1 Million, that
were sought via a public invitation to tender, and whereby expediting the award process outside the
normal Council meeting cycle was advantageous to Council.

More recently, the updated Procurement Policy adopted by Council in June 2024 incorporated
reinforced policy protocol for the PCAWT principles whilst also expanding its scope to be able to
consider any large-sized ($200,000 or more, exc. GST) contractual arrangements procured in
accordance with the Local Government Regulation 2012 and Council’s policies and guidelines i.e.
in addition to public tenders, the PCAWT may now also convene to consider and review any large-
sized procurement activity including quotations (under panel arrangement or otherwise), and other
forms of procurement.

The inclusion of the PCAWT into policy, coupled with expanding the scope of procurement activity
the team considers/reviews aims to:
•     Continue to facilitate the award of public tenders, within CEO delegation, in order to expedite
      contract award,




                                                                                                 Page 32 of 93

Page 33

GENERAL COMMITTEE MEETING                                                           20 JANUARY 2025


•    Provide a mechanism for the additional review of any large-sized procurement activity, between
     $200,000 - $1,000,000 (exc. GST), prior to recommendation to CEO for award.
•    Enhance the existing governance and probity framework, for Council and CEO, for the awarding
     of large-sized contracts.

1.   CEO Delegation

In accordance with Section 41 of the Council Register of Delegations – Council to Chief Executive
Officer (CEO), the CEO has been granted the authority (by Council) to:
a. undertake the following procurement and contracting activities:
         i.   invite written quotes for medium-sized contractual arrangements;
         ii. invite written tenders for large-sized contractual arrangements;
         iii. invite expressions of interest (following Council resolution);
        iv. invite offers for the sale of valuable non-current assets (other than sale of land) by written
            tender or auction; and
b. make, enter into, amend or discharge contracts (established by the aforementioned methods)
   for up to $1,000,000 (excluding GST) for the:
         i.   procurement of goods and services (including contracts about carrying out of works);
         ii. the disposal of valuable non-current assets (but not the sale of land);
         iii. the disposal of goods and assets (that are valuable non-current assets).

2.   Procurement Policy

In accordance with Council’s Procurement Policy the Procurement Assessment Working Team
(PCAWT) has been established for the following purpose:

Where it has been identified that the award of a large sized contractual arrangement outside of the
normal Council meeting cycle is considered advantageous to Council, the convening of the
Procurement Contracts Assessment Working Team (PCAWT) may be requested. The PCAWT may
review requests for the award of large sized contractual arrangements up to the value of $1 Million
(excluding GST) that have been sought in accordance with the Local Government Regulation 2012
and Council’s procurement policy and guidelines.

3.   Procurement Assessment Working Team (PCAWT)

The PCAWT’s role is to review specific requests to approve large-sized contractual arrangements
outside of the normal Council meeting cycle. The PCAWT is comprised of the following Council
Officers*:
1. Director Corporate Services
2. Executive Officer Internal Audit and Corporate Performance
3. Procurement Manager
*Where one of the above is not available, or not suitable due to probity, a substitute officer is sought
to comprise the PCAWT.

Once convened the PCAWT’s role is to undertake a review of the procurement process and
evaluation to ensure that the process was carried out in accordance with Council’s policies and
guidelines. The review may include, but is not limited to, the following:
•    Reviewing the evaluation, including scoring, that has been submitted by the evaluation panel;
•    Reviewing supplier responses to the invitation to tender/quotation;




                                                                                                    Page 33 of 93

Page 34

GENERAL COMMITTEE MEETING                                                      20 JANUARY 2025


•    Consider consistency on evaluation, to other procurement outcomes and policy alignment;
•    Clarifying any aspects of the procurement/evaluation process, and proposed award/contract,
     with the evaluation panel chair and/or Procurement Advisor.
If the PCAWT is satisfied with the procurement process and the subsequent recommendation for
award, a recommendation (report) will be made to the CEO for consideration.

4.   Reporting Requirements

In accordance with Part 4, Chapter 6, Local Government Regulation 2012, all contractual
arrangements worth $2000,000 or more (exclusive of GST) are published via Council’s website, after
award.

To provide additional disclosure, as per policy, the Director Corporate Services will also report
PCAWT reviewed and CEO awarded contracts to Council on a bi-annual basis.

Link to Corporate Plan

Theme No. 5 - Excellence

This theme focuses on customer experience, financial sustainability, innovation and technology,
levels of service, governance, our employees and volunteers, funding streams and asset
management practices.


Previous Council Consideration
Special Meeting 28 June 2024
That Council note the report by the Director Corporate Services to the Special Meeting dated 28
June 2024 and
...
I. Adopt the Procurement Policy, which is provided as Attachment 9 to this report.
...

Finance
Funding of these procurement activities occurs within adopted budgets. Where any procurement
requires additional funding, this is addressed through budget review.

Risk & Opportunities
                 Risk                               Mitigation / Opportunity
                                                    The PCAWT/CEO process offers 2 stages of
                 Awarding contracts outside of
                                                    review (PCAWT and CEO), in addition to the
                 Council Meetings perceived as
                                                    original procurement evaluation, before a
                 not being a robust process.
                                                    decision to award.
PCAWT                                               A report must first be submitted to the
Process          Contracts may be awarded           PCAWT, generally by the procurement
                 outside of Council Meetings,       evaluation chair, outlining the details of the
                 that may otherwise require         procurement/project and rationale for seeking
                 consideration/debate directly by   the PCAWT. Should the PCAWT, or
                 Council.                           subsequently the CEO, deem that the contract
                                                    award should be considered by Council, the




                                                                                             Page 34 of 93

Page 35

GENERAL COMMITTEE MEETING                                                                 20 JANUARY 2025


                                                            process can be directed through the normal
                                                            Council Meeting cycle/options.
                                                            The PCAWT/CEO contract award process is
                     Risk that a contract award is          only available for large-sized contractual
Delegated
                     made without delegated                 arrangements within the delegation of the
Authority
                     authority.                             CEO - $1,000,000 (exclusive of GST), as
                                                            outlined under Council Policy.
                                                            In accordance with Part 4, Section 237 of the
                                                            Local Government Regulation 2012 Council
                                                            publishes the details of contractual
                                                            arrangements of $200,000 (exc. GST) or
               Transparency/visibility of
Transparency                                                more both, on Council’s public website and
               awarding large-sized contracts
&                                                           Tewantin Building public noticeboard.
               (within CEO Delegation) outside
Accountability
               of Council Meetings.
                                                            Council’s procurement policy requires that
                                                            contract awards via the PCAWT be reported
                                                            to Council bi-annually by the Director,
                                                            Corporate Services.


Human Rights
Human Rights Compatibility Statement
In developing this Report, the subject matter has been considered in accordance with the
requirements of the Queensland Human Rights Act 2019. It is considered that the subject matter
does not conflict with any human rights and supports a human rights approach to decision making
by Council. Council representatives will endeavour to act and make decisions under this report in a
manner that is compatible with human rights. This report should be read in conjunction with
Council’s Human Rights Policy.

Consultation
External Consultation - Community & Stakeholder
NA


Internal Consultation
Departments consulted:
Procurement Policy adoption by Council June 2024.
     Office of the CEO, Mayor &          Community Services                    Corporate Services
             Councillors
       Mayor & Councillors              Director                       X    Director
       Chief Executive Officer          Community Development               Financial Services
       Executive Officers               Sport & Active Lifestyles           Fleet
       Community Engagement             Arts & Culture                      Revenue Services
       People & Culture                 Community Connection                ICT
       Governance                       Customer Experience           X     Procurement

                                                                            Commercial Property

      Strategy & Environment          Development & Regulation               Infrastructure Services
       Director                         Director                            Director




                                                                                                       Page 35 of 93

Page 36

GENERAL COMMITTEE MEETING                                                20 JANUARY 2025


   Strategy & Sustainability   Development Assessment   Infrastructure    Planning,   Design
                                                        and Delivery
   Economic Development &      Local Laws               Civil and Asset operations
   Destination Management
   Environmental Services      Environmental Health     Waste
   Innovation & Digital Hub    Building & Plumbing      Building & Facilities
                               Property / Permits       Disaster Management




                                                                                        Page 36 of 93

Page 37

 ATTACHMENT 1

GENERAL COMMITTEE MEETING REPORT                                             20 January 2025


   1. Awarded Contracts Table

The following table summarises the Contract Awards approved by CEO under Delegation, as recommended by the Procurement & Contracts
Assessment Working Team (PCAWT) for the period July 2024 – December 2024, in accordance with Council’s Procurement Policy.

 Contract       Contract Title           Awarded            Contract                 PCAWT                      PCAWT Convened     CEO Approval
 Number                                 Contractor/s         Award                Panel Members                     Date               Date
                                                            Amount
                                                           (GST exc.)
 CN00676    Lions Park Noosa          R&L Jones           $320,115.00    1. Director, Corporate Services        11 July 2024      11 July 2024
            Heads Amenities           Constructions                      2. Executive Officer, Internal Audit
            Refurbishment             Pty Ltd                               & Corporate Performance
                                                                         3. Procurement Manager

 CN00442    Noosa River & Six         AECOM               $454,800.00    1. Director, Corporate Services        20 August 2024    27 August 2024
            Mile Creek Flood          Australia Pty Ltd                  2. Executive Officer, Internal Audit
            Study                                                           & Corporate Performance
                                                                         3. A/g Procurement Manager

 CN00518    Workers                   Workcover           $975,292.84    1. Director, Corporate Services        26 September 2024 3 October 2024
            Compensation              Queensland                         2. Executive Officer – CEO Office
            Insurance                                                    3. Procurement Manager

 CN00692    Fabrication,              Meyer &             $819,972.56    1. Director, Corporate Services        26 September 2024 3 October 2024
            Installation & Delivery   Landman Pty Ltd                    2. Executive Officer – CEO Office
            of 7 Truck Bodies & 1     t/as Paulger                       3. Procurement Manager
            Body Swap                 Engineering
 CN00762    Tewantin                  TTF Gealy’s         $170,504.79*   1. Director, Corporate Services        10 October 2024   25 October 2024
            Administration            Investment Trust                   2. Executive Officer – CEO Office
            Building – Air            t/as Gealys                        3. Procurement Manager
            Conditioning              Airconditioning
            Condenser                 and Refrigeration
            Replacement



                                                                                  Page 1 of 2

                                                                                                                                          Page 37 of 93

Page 38

 ATTACHMENT 1

GENERAL COMMITTEE MEETING REPORT                                                           20 January 2025




  Contract          Contract Title              Awarded              Contract                     PCAWT                  PCAWT Convene       CEO Approval
  Number                                       Contractor/s           Award                    Panel Members                 Date               Date
                                                                     Amount
                                                                    (GST exc.)
 CN00769        The J Noosa HVAC             TTF Gealy’s           $309,791.00         1. Director, Corporate Services   10 October 2024    12 November 2024
                Renewal                      Investment Trust                          2. Executive Officer – CEO
                                             t/as Gealys                                  Office
                                             Airconditioning                           3. Procurement Manager
                                             and Refrigeration
 X-SPE014       Christmas 2024 &             Transit Australia     $226,871.58         1. Director, Corporate Services   16 October 2024    25 October 2024
                Easter 2025 Holiday          Pty Ltd t/a                               2. Executive Officer – CEO
                Bus Service                  Kinetic                                      Office
                                                                                       3. Procurement Manager

 CN24870        Supply, Delivery,            EROAD Australia       $410,490.40         1. Director, Corporate Services   19 December 2024   23 December 2024
                Implementation and           Pty Ltd                                   2. Executive Officer, Internal
                Maintenance of In-                                                        Audit & Corporate
                Vehicle Monitoring                                                        Performance
                System (IVMS)                                                          3. Procurement Manager

 CN00568        Doonella Lake Bridge         Stantec Australia     $410,828.00         1. Director, Corporate Services   19 December 2024   24 December 2024
                Detailed Design              Pty Ltd                                   2. Executive Officer, Internal
                                                                                          Audit & Corporate
                                                                                          Performance
                                                                                       3. Procurement Manager

*CN00762 – whilst not a large-sized contract PCAWT reviewed in conjunction with CN00769.




                                                                                                Page 2 of 2

                                                                                                                                                     Page 38 of 93

Page 39

GENERAL COMMITTEE MEETING                                                                      20 JANUARY 2025


8.5     FINANCIAL PERFORMANCE REPORT – DEC 2024


Author                Financial Services Manager, Pauline Coles
                      Financial Services | Corporate Services Department
Index                 ECM/ Subject / 22.09 – Monthly Financial Performance Report
Attachments           1.   Attachment 1 - Statement of Income and Expenditure - Dec 2024
                      2.   Attachment 2 - Statement of Financial Position - Dec 2024
                      3.   Attachment 3 - Statement of Cashflows - Dec 2024
                      4.   Attachment 4 - Key Materials & Services Expenditure - Dec 2024


EXECUTIVE SUMMARY
Year-to-date (YTD) performance against current budget as at 31 December 2024 is positive with
operating revenues outperforming forecast and operating expenditure under forecast YTD.

Capital revenues are above forecast with capital expenditure behind of forecast due to delays
and rescheduled timing of project delivery.
   YTD Financial Performance Summary

                                           Budget         Actual     Variance       Variance
                                                                                                    Status
                                              $m             $m           $m              %
   Operating Revenue                         $70.4         $73.4           $3.0         4.3%       On Track
   Operating Expense                         $66.6         $67.0         ($0.5)       (0.7%)       On Track
   Operating Position                         $3.8           $6.4          $2.6
   Capital Revenue                           $30.5         $35.0          $4.5         14.7%      On Track
   Capital Expenditure*                      $72.5         $46.7         $25.8         35.6%    Behind Budget
* Reflects constructed assets and intangibles only (excludes contributed assets).


The $2.6 million full year positive interim operating variance comprises $1.9 million general
operating surplus from activities that are funded through Council’s general rate, regulatory fees
and sales of goods and services; as well an additional $0.7 million from waste operations and
$0.1 million from holiday park operations. Any unspent levy and separate charge funds are
constrained in reserve for future use where they are not fully utilised in a given year.

                                                                                  Budget       Actual   Variance
 Item                                                                               YTD          YTD         YTD
                                                                                     $m           $m          $m
 General business operating position (unconstrained funds)                          $1.1         $3.0        $1.9
 Commercial operations (constrained funds) *                                        $2.0         $2.8        $0.8
 Unspent levies (constrained funds)                                                 $0.7         $0.6      ($0.1)
 Total Council Operating Position                                                   $3.8         $6.4        $2.6
* Includes Waste and Holiday Park operations as shown in the table below

Council elects to apply National Competition Policy (NCP) reforms to its Waste Management and
Holiday Parks which provides greater transparency and assists with removing anti-competitive
conduct and ensures the best allocation of Councils limited resources. A summary of the YTD
operational performance of these business activities are outlined below.




                                                                                                              Page 39 of 93

Page 40

GENERAL COMMITTEE MEETING                                                       20 JANUARY 2025


                                          Waste Operations                   Holiday Parks
                                      Budget  Actual Variance          Budget   Actual Variance
                                        YTD      YTD       YTD           YTD      YTD       YTD
                                         $m       $m        $m            $m       $m        $m
 Revenue                                12.7     13.1       0.4           2.2      2.5       0.3
 Expenditure                            11.2     10.9       0.3           1.7      1.9     (0.2)
 Net Operating Position                  1.5      2.2       0.7           0.4      0.5       0.1

Financial statements including Statement of Income & Expenditure, Statement of Financial Position
(balance sheet), and Statement of Cash Flows are included as attachments for information for
Council.

Figure 1: Actual Performance Compared to Budget




Council’s performance against key measures of financial sustainability has been calculated as at
December 2024. These statutory indicators enable the reader to assess Council’s success in
managing its budget, cash and debt as well as undertaking sustainable asset management. The
table below contains a snapshot of a number of key measures, with full detail included in the report.


 YTD Measures of Financial Sustainability

                                                         Current
                                             Target                   Actual YTD        Status
                                                         Budget
 Operating Surplus Ratio                      0-10%       -0.1%           8.8%        On Track
 Net Financial Liabilities Ratio              <60%        -3.2%          -31.5%       On Track
 Cash Cover Ratio                           3 months   9.4 months      9.9 months     On Track
 Asset Sustainability Ratio                   > 90%      136.7%           38.7%     Behind Budget



RECOMMENDATION
That Council note the report by the Financial Services Manager to the General Committee
Meeting dated 20 January 2025 outlining the December 2024 year to date financial performance
against budget, including changes to the financial performance report with the inclusion of key
financial sustainability indicators.




                                                                                                 Page 40 of 93

Page 41

GENERAL COMMITTEE MEETING                                                              20 JANUARY 2025


REPORT
Operating Revenue (YTD Benchmark 50.0%)
Council has received 52.5% ($73.4 million) of its operating revenue budget ($139.9 million).
Commentary on each revenue category is provided below.

 Category          Summary                   Comments
 Rates and         $47.0 million (49.8%)     •   Waste utility charges $90.0k above YTD budget
 Levies            of the annual budget of       (50.3% or $8.5 million of $16.9 million annual budget
                   $94.4 million has been        earned)
                   earned                    •   General rate (net of discounts) $157.9k below YTD
                                                 budget (49.7% or $35.5 million of $71.4 million annual
                                                 budget earned)

 Fees and          $5.8 million (52.9%) of   •   Building & Plumbing Compliance $165.7k above
 Charges           the annual budget of          budget (50.7% or $1.3 million of $2.6 million annual
                   $10.9 million has been        budget earned)
                   earned                    •   Waste $56.0k above budget (147.4% or $83.9k of
                                                 $56.9k annual budget earned)
                                             •   Development Assessment $272.9k below budget
                                                 (51.1% or $1.8 million of $3.6 million annual budget
                                                 earned)

 Sale of Goods     $7.6 million (55.0%) of   •   Holiday Park revenue $315.3k above budget (61.3%
 and Services      the annual budget of          or $2.5 million of $4.0 million annual budget earned).
                   $15.6 million has been        Any revenue upside will be generally offset by a
                   earned                        corresponding increase in associated operating costs.
                                             •   Waste $196.7k above budget (51.8% or $3.9 million of
                                                 $7.7 million annual budget earned).
                                             •   Sports facility revenue $167.7k above budget (56.1%
                                                 or $1.7 million of $2.9 million annual budget earned)

 Interest          $3.3 million (105.1%)     •   Interest revenues have continued to track above
 Received          of the $3.1 million           budget with investment in higher yielding term
                   annual budget has             deposits maximising the return on surplus cash
                   been earned                   holdings. Cash holdings are higher compared to
                                                 previous years due to the advanced payment of QRA
                                                 disaster capital works grants and delays in the delivery
                                                 of the capital works program.

 Other Revenue     $1.9 million (59.2%) of   •   Plant recharge revenue is $76.9k above budget due to
                   the $3.3 million              internal plant being utilised for the delivery of disaster
                   annual budget has             funded capital projects.
                   been earned               •   Royalty income from landfill gas $22.4k above budget
                                                 (88.5% or $51.5k of $58.1k annual budget earned).
                                             •   Recoupment of Waste Bin (SULO) purchases $14.3k
                                                 above budget (63.9% or $66.0k of $103.3k annual
                                                 budget earned.

 Operating         $4.2 million (62.9%) of   •   Operating Grants and subsidies are in line with budget
 Grants,           the $6.6 million              expectations at this stage of the year. YTD variance
 Subsidies         annual budget has             relates to $65k Floating Land grant, $75k for Disaster
                   been received                 Recovery & Resilience Officer funding program, $90k
                                                 for Regional Enablers program and $98k final
                                                 payment relating to Black Summer Bushfire Funding
                                                 for the living tech fire lab.
                                             •   $1.4 million of the FY 2025 financial assistance grant
                                                 allocation was received in July 2024. This is a change
                                                 from the previous approach of prepaying part or all of




                                                                                                        Page 41 of 93

Page 42

GENERAL COMMITTEE MEETING                                                                  20 JANUARY 2025


 Category           Summary                    Comments
                                                  the grant in the preceding year. This prepayment
                                                  approach had been consistent over the past 7 years.
                                               • Council has received notification of the approved FY
                                                  2024/25 financial assistance grant allocation which is
                                                  less than budgeted. As such there is potential for this
                                                  to impact the FY 24/25 operating position if payment
                                                  of future years allocations are not paid in the
                                                  preceding year.

 Unitywater         On track                   •       Unitywater distributions are fixed each year so there is
 Distributions                                         limited budget variance risk


Figure 2: Operating Revenue Position by Type (Excluding Rates)




Operating Expenditure (YTD Benchmark 50.0%)
Actual operating expenditure is currently 47.8% ($67.0 million) of the full year budget ($140.1
million). Detailed commentary for each expenditure category is provided below.

 Category           Summary                        Comments
 Employee Costs     $25.7 million (49.0%) of       •     Expenditure for permanent staff salaries and wages
                    the annual budget of                 underspent ($823.3k) due to position vacancies and
                    $52.6 million has been               recoupment of YTD vacancy dividend. This
                    expended                             underspend is also partially offset by additional spend
                                                         on casual staff and external labour hire ($823.3k).
                                                   •     Training costs are on target (58.9% or $227.3k of
                                                         $386.1k annual budget spent).

 Materials and      $29.1 million (46.7%) of       •     Civil Operations $617.0k above budget (53.9% or
 Services           the $62.4 million annual             $5.1 million of $9.5 million annual budget spent).
                    budget      has    been        •     Holiday Parks $217.0k above budget (58.4% or $1.4
                    expended.                            million of $2.4 million annual budget spent).
                                                   •     Holiday Parks $217.0k above budget (58.4% or $1.4
                                                         million of $2.4 million annual budget spent).
                                                   •     Sustainable Transport above budget (14.8% or
                                                         $141.8k of $962k annual budget spent).
                                                   •     Digital Hub above budget (56.0% or $204.8k of
                                                         365.4k annual budget spent.
                                                   •     Waste Management $313.3 below budget (45.0% or
                                                         $6.6 million of $14.7 million annual budget spent).
                                                   •     Arts & Culture $99.8k below budget (41.3% or $1.1
                                                         million of $2.6 million annual budget spent).




                                                                                                            Page 42 of 93

Page 43

GENERAL COMMITTEE MEETING                                                               20 JANUARY 2025


    Category           Summary                   Comments
                                                 •     Development Assessment below budget (59.4% or
                                                       $779.7 of a $1.3 million annual budget spent).
                                                 •     Transport and Traffic $40.1k below budget (28.1% or
                                                       $64.6k of a $229.6k annual budget spent).
                                                 •     Sports facilities $52.3k below budget (45.8% or
                                                       $730.1k of a $1.6 million annual budget spent).
                                                 •     Canals & Waterways $40.6 below budget (35.0% or
                                                       $121.2k of $526.4k annual budget spent.

    Finance Costs      Currently on track        •     Whilst existing loan borrowings are set with fixed
                                                       interest rates, any further RBA rate rises will impact
                                                       finance costs on new loan borrowings. YTD
                                                       underspend also relates to the timing of drawdown of
                                                       forecast borrowings for FY 2025.

    Depreciation       Currently on track        Nil
    Other Expenses     Currently on track        Nil

Figure 3: Operating Expenditure Position by Type




Tourism and Economic Development Investment Summary
Council resolved to report on a monthly basis, investment details for tourism and economic
development. Tourism and economic development activity is funded through the general rates
revenue. Expenditure at 31 December 2024 is outlined below:
 Expenditure                                               YTD Budget          YTD Actual          Variance
                                                                $’000               $’000             $’000
 Tourism Noosa Funding Agreement                               $1,260.0           $1,260.0                  -

 Economic Development                                            $525.6             $508.7             $16.9

 Total                                                         $1,785.6           $1,768.7             $16.9

Tourism and economic development activity is funded through the general rates. The first instalment
payable under the Tourism Noosa agreement for the 2024-25 financial year was made in July 2024,
with the second instalment due in January 2025. The Tourism Noosa agreement is due for renewal
in June 2025.
•     Employee Costs are $18.0k below budget (46.7% or $301.4k of $644.4k annual budget spent)
•     Materials & Services are in line with budget at this stage of the year




                                                                                                        Page 43 of 93

Page 44

GENERAL COMMITTEE MEETING                                                   20 JANUARY 2025




Capital Revenue
Year to date Capital revenue of $35.0 million received comprises cash contributions from
developers ($0.6m) and capital grants ($34.4 million). Note that the timing of capital grant
receipts are generally dependent on the timing of grant conditions and also capital delivery
performance, and that the timing of the receipt of developer contributions (both cash and
contributed) is unpredictable.

Grants and subsidies are higher than prior years due to the receipt of funding from the
Queensland Reconstruction Authority for reconstruction works relating to the Black Mountain
landslip and several other flood impacted sites, which are currently under construction.
Figure 6: Capital Revenue by Type




Capital Program
Actual capital expenditure (excluding commitments and disaster projects) is $13.6 million (YTD
budget $23.8 million). Expenditure on disaster projects (excluding commitments) is $33.1 million
(YTD budget $48.8 million).

Detailed discussion of progress in the delivery of the capital works program is provided through
a separate quarterly report by the infrastructure team.

Figure 7: Capital Program Delivery Performance




                                                                                          Page 44 of 93

Page 45

GENERAL COMMITTEE MEETING                                                        20 JANUARY 2025



Cash Management and Investment Performance
Total cash on hand at the end of December was $94.5 million. Included in this balance are funds
held in trust and for restricted purposes (e.g. unexpended levy and grant funds), prepaid grants
including the financial assistance grant, QRA disaster funding and other capital works grants,
prepayment of Waste Levy subsidy (3 years), and unspent monies committed for funding capital
projects which are underway and will continue during the financial year.
The following pie charts present the mix of cash held at December 2024 by agency (graph on
the left) and by credit risk rating (graph on the right). All funds have been invested in accordance
with the Investment Policy and in consideration of the principles of ethical investment,
preservation of capital, return on investment and counterparty thresholds.

Figure 8: Closing Cash Held by Agency and Credit Rating




The following chart monitors the 12 month trend on total cash and the agencies invested. To
maximise the return on in its cash holdings Council has invested $30.5 million in higher yielding term
deposits. These investments were made in line with Council’s Investment of Surplus Funds policy.

Figure 9: 12 Month Trend of Cash Invested by Agency




                                                                                                Page 45 of 93

Page 46

GENERAL COMMITTEE MEETING                                                        20 JANUARY 2025



Measures of Financial Sustainability
The following table incorporates a set of financial sustainability indicators to further assist in
managing Council financial performance. There are no significant emerging risks regarding
performance identified at this stage, however the delay in the delivery of the capital program
may impact Council’s asset sustainability and renewal targets.

 Category                                                 Comments
 Operating Surplus Ratio                                   •   Intent: Identifies the extent to which
                                                               revenues cover operational expenses,
                                                               to ensure community equity is not
                                                               degraded
                                                           •   Target: Greater than 0%
                                                           •   Result: 8.8%
                                                           •   Comment: The slowly declining ratio
                                                               reflects the levying of 50% of rates in
                                                               July and gradual utilisation of these
                                                               monies as expenditure occurs on
                                                               operations through to the next rating
                                                               cycle in January 2025.

 Cash Expense Cover                                        •   Intent: Indicates how long council can
                                                               continue paying its day-to-day
                                                               expenses from cash at bank without
                                                               needing additional cash flows
                                                           •   Target: > 3 months
                                                           •   Result: 9.9 months
                                                           •   Comment: Cash         cover    remains
                                                               above target, while business as usual
                                                               expenditure through to 30 June 2025
                                                               will degrade Council’s cash holdings,
                                                               albeit not below the target range of 3 –
                                                               6 months.
                                                               Cash balances include funding for
                                                               capital programs, unspent grant
                                                               monies paid in advance, Waste Levy
                                                               subsidy prepayments and QRA
                                                               advance payments for disaster
                                                               projects which are restricted for
                                                               specific purposes and inflate the ratio.

 Asset Sustainability Ratio                                •   Intent: Measures the extent to which
                                                               assets are being replaced as their
                                                               condition degrades to ensure service
                                                               potential is maintained
                                                           •   Target: 80% of depreciation budget
                                                               spent on renewals annually
                                                           •   Result: 38.7% achieved, however
                                                               below forecast result due to project
                                                               delays and scheduling.
                                                           •   Comment: The            ratio      will
                                                               progressively increases each month
                                                               as expenditure on renewals occurs as
                                                               part of the capital works program. For
                                                               transparency QRA disaster projects
                                                               have been excluded from the ratio
                                                               calculations. Should capital works
                                                               continue to fall forecast for the




                                                                                                  Page 46 of 93

Page 47

GENERAL COMMITTEE MEETING                               20 JANUARY 2025


Category                          Comments
                                     remainder of the year this may impact
                                     the achievement of Council’s asset
                                     sustainability and renewal targets

Net Financial Liabilities Ratio   •   Intent: Outlines the level that net
                                      Council debt can be serviced by
                                      operating revenues. A ratio below zero
                                      implies that liabilities are less than
                                      cash (and other current assets) and
                                      there is adequate borrowing capacity
                                      available if needed.
                                  •   Target: less than 60%
                                  •   Result: -31.5%
                                  •   Comment: Council has low debt
                                      levels and strong cash holdings. The
                                      advance payment of rates, grants and
                                      subsidies also inflates the YTD actual
                                      outcome.

Investment Return                 •   Intent: Ensure appropriate return on
                                      investment yield for cash at bank.
                                  •   Target: 0.25%       above      current
                                      Bloomberg commonwealth 10-year
                                      bond rate yield (4.45%)
                                  •   Result: 5.8%
                                  •   Comment: With            higher-than-
                                      normal cash balances due to the
                                      advance payment of grants and
                                      subsidies and a delayed capital
                                      program, combined with bond
                                      rates remaining steady, Council
                                      has invested surplus cash in
                                      higher yielding term deposits to
                                      maximise     returns.  Council’s
                                      investment returns remain above
                                      target.


Rates in Arrears                  •   Intent: Ensuring that the amount of
                                      unpaid rates remains sustainable and
                                      does not negatively impact cash flows
                                  •   Target: 5% industry benchmark
                                  •   Result: 6.3%
                                  •   Comment: Rates arrears continue to
                                      decline from the high point in the cycle
                                      with payments coming due in August.
                                      Reminder notices have been issued,
                                      and arrears will continue to stabilise
                                      through to January as they are
                                      collected, and payment arrangements
                                      implemented.




                                                                         Page 47 of 93

Page 48

GENERAL COMMITTEE MEETING                                                              20 JANUARY 2025



Link to Corporate Plan

Theme No. 5. - Excellence
This theme focuses on customer experience, financial sustainability, innovation and technology,
levels of service, governance, our employees and volunteers, funding streams and asset
management practices.
Objective 5.2 - Continue to deliver a financially sustainable Council that has the resources now and
into the future to achieve its strategic objectives. This will be supported through the introduction of
enhanced sustainability reporting and performance indicators, as well as ESG (environment social
and governance) accounting practices as guided by statutory requirements.


Previous Council Consideration
Nil.


Finance
As above.


Risk & Opportunities
Council’s risk register identifies a number of risks that could impact on its ongoing financial
sustainability. In order to manage and mitigate these risks Council uses various tools which include
monthly ongoing financial reporting to identify and address emerging issues, conservative budgeting,
compliance with the Financial Sustainability Policy, regular budget reviews, effective liquidity
management to ensure sufficient fiscal flexibility, as well as adhering to the Reserves and Restricted
Cash policy which requires that Council maintains both a disaster management reserve and a
minimum 3 months cash cover to fund emergent matters.

Some examples of potential risks that may impact on Council’s operational performance, capital
program delivery, cashflow and cash reserves include:
•      Substantial damage to or failure of Council infrastructure due to natural disaster or other
       emergent issue that may require significant unplanned investment;
•      An extended closure of Council facilities impacting operational revenues;
•      A prolonged IT system failure affecting Council’s ability to deliver services or issue rates notices;
•      Economic conditions affecting ratepayers’ ability to pay rates;
•      Market driven increases in construction and operational costs significantly above estimates;
•      Labour and material shortages and delays.
•      Strategies, plans and projects deliverables that have not been accurately costed
•      Fraud attempts may result in financial impacts to Council if funds cannot be recovered
•      Reliance on non-recurrent revenue streams (i.e. interest revenue on grants and short term cash
       holdings) to fund business as usual operations may result in higher rate increases in future years
       or service level cuts to fund potential shortfalls.




                                                                                                      Page 48 of 93

Page 49

GENERAL COMMITTEE MEETING                                                                20 JANUARY 2025




Human Rights
Human Rights Compatibility Statement
In developing this Report, the subject matter has been considered in accordance with the
requirements of the Queensland Human Rights Act 2019. It is considered that the subject matter
does not conflict with any human rights and supports a human rights approach to decision making
by Council. Council representatives will endeavour to act and make decisions under this report in a
manner that is compatible with human rights. This report should be read in conjunction with Council’s
Human Rights Policy.

Consultation
External Consultation - Community & Stakeholder
Nil.


Internal Consultation
All areas of Council are consulted as part of the regular monitoring of budget performance.
Departments consulted:
       Office of the CEO, Mayor &               Community Services               Corporate Services
               Councillors
        Mayor & Councillors               X   Director                    X   Director
  X     Chief Executive Officer               Community Development       X   Financial Services
        Executive Officers                    Sport & Active Lifestyles       Fleet
        Community Engagement                  Arts & Culture                  Revenue Services
        People & Culture                      Community Connection            ICT
        Governance                            Customer Experience             Procurement

                                                                              Commercial Property

        Strategy & Environment                Development & Regulation        Infrastructure Services
  X     Director                          X   Director                    X   Director
        Strategic Land Use Planning           Development Assessment          Infrastructure Planning, Design
                                                                              and Delivery
        Economic Development          &       Local Laws                      Civil and Asset operations
        Destination Management
        Environmental Services                Environmental Health            Waste
        Innovation & Digital Hub              Building & Plumbing             Building & Facilities
                                              Property / Permits              Disaster Management




                                                                                                           Page 49 of 93

Page 50

Attachment 1 - Statement of Income and Expenditure - Dec 2024


Noosa Council
Statement of Income and Expenditure
For the Year Ended 30 June 2025
As at 31 December 2024
                                                           Current    Current
                                                           Budget     Budget     Actual    Variance      Annual
                                                              2025        YTD       YTD         YTD      Budget
                                                            ($'000)    ($'000)   ($'000)     ($'000)       %
Profit and Loss Statement

Revenue
   Recurrent Revenue
   Rates, levies and charges                                94,398     47,108    47,035          (73)      50%
   Fees and charges                                         10,936      5,897     5,789        (108)       53%
   Interest received                                         3,150      1,826     3,310        1,484       105%
   Sale of Goods and major services                         15,602      7,892     8,576          684       55%
   Sale of contract and recoverable works                       31          -        13           13       43%
   Rental & lease income                                     2,273      1,183     1,191            9       52%
   Other income                                              1,001        502       746          244       74%
   Grants, subsidies, contributions and donations            6,650      3,407     4,181          774       63%
   Unitywater Distributions                                  5,950      2,605     2,605            -       44%
                                                           139,990     70,420    73,447        3,026       52%
Expenses
   Recurrent Expenses
   Employee benefits                                        52,577     25,753    25,753           (1)      49%
   Materials and services                                   62,339     28,483    29,127        (644)       47%
   Finance costs                                             3,032      1,248     1,113          135       37%
   Depreciation                                             21,936     10,968    10,968           (0)      50%
   Other expenses                                              246        104        57           47       23%
                                                           140,130     66,555    67,018        (463)       48%

Operating Result                                              (140)     3,866     6,429        2,563

Summary of Capital Expenditure and Funding

Capital Funding
   Capital cash contributions and infrastructure charges     1,429        614       614            -       43%
   Contributed assets                                        1,500          -         1            1        0%
   Capital grants and subsidies                             92,983     29,921    34,419        4,497       37%
   Cash / revenue                                           33,182     42,003    14,959     (27,044)       45%
   New loan borrowings                                       5,000          -         -            -        0%
   Other capital revenue                                         -          -         -            -        0%
Total Capital Funding                                      134,094     72,538    49,993     (22,546)

Capital Expenditure
   Contributed assets                                        1,500          -         1            1        0%
   Capital works - constructed assets                      120,700     67,734    43,851     (23,883)       36%
   Capital works - other capital                            10,653      4,184     2,236      (1,948)       21%
   Loan redemption                                           1,241        621       621            -       50%
   Other capital expenses                                        -          -     3,284        3,284        0%
Total Capital Expenditure                                  134,094     72,538    49,993     (22,546)




                                                                                                        Page 50 of 93

Page 51

Attachment 2 - Statement of Financial Position - Dec 2024

Noosa Council
Statement of Financial Position
For the Year Ended 30 June 2025
As at 31 December 2024
                                                2025 Year End
                                                     Forecast    2025 YTD          2024
                                                       ($'000)      ($'000)      ($'000)
Current Assets
      Cash and cash equivalents                        90,162       94,476      106,127
      Trade and other receivables                      13,017       14,727       19,151
      Inventories                                         198          246          237
      Contract Assets                                       -        6,961        6,961
      Other current assets                              2,854        3,608        1,102
Total Current Assets                                  106,231      120,018      133,578

Non Current Assets
      Trade and other receivables                      49,218       49,218       49,218
      Other non current Assets                              -            -            -
      Investments                                      99,580      103,744      103,744
      Investment property                               4,000        3,750        3,750
      Property, plant and equipment                 1,551,112    1,264,765    1,232,917
      Right of Use Assets                                  39        1,123        1,122
      Intangible assets                                   512          216          238
Total Non Current Assets                            1,704,460    1,422,815    1,390,989

Total Assets                                        1,810,692    1,542,833    1,524,567

Current Liabilities
      Trade and other payables                          9,445       12,181       24,824
      Contract Liabilities                              4,000        8,167        8,167
      Borrowings                                        1,339          838        1,406
      Lease Liablities                                     23          235          235
      Provisions                                        8,103        8,802       11,727
      Other                                             8,931        5,556        9,334
Total Current Liabilities                              31,842       35,779       55,693

Non Current Liabilities
      Borrowings                                       28,394       23,449       23,449
      Lease Liabilities                                    17          917          917
      Provisions                                       33,251       31,559       31,559
      Other                                             8,230        5,203        5,203
Total Non Current Liabilities                          69,892       61,128       61,128

Total Liabilities                                     101,734       96,906      116,820

Net Community Assets                               1,708,957     1,445,927    1,407,746

Community Equity
    Asset Revaluation Surplus                         410,608      316,106      316,106
    Retained Surplus / (Defeciency)                         -            -            -
    Shire Capital                                   1,298,349    1,091,641    1,044,817
    Current Year Net Earnings                               -       38,179       46,822
Total Community Equity                             1,708,957     1,445,927    1,407,746




                                                                                  Page 51 of 93

Page 52

Attachment 3 - Statement of Cashflows - Dec 2024

Noosa Council
Statement of Cash Flows
For the Year Ended 30 June 2024
As at 31 December 2024
                                                                          Current     Actual         Actual
                                                                          Budget         YTD       Full Year
                                                                             2025       2025            2024
                                                                           ($'000)    ($'000)        ($'000)

Cash flows from operating activities

     Cash Flows from Operating Activities

     Receipts from Customers                                               121,305     68,438        117,793
     Payments to Suppliers and Employees                                  (117,261)   (79,333)      (112,272)
                                                                             4,045    (10,895)         5,520
     Receipts:
     Investment and Interest Revenue Received                                5,000      3,906          8,909
     Rental Income                                                           2,263      1,191          1,652
     Non Capital Grants and Contributions                                    6,624      4,181          3,939
     Income Tax Equivalent Received                                          2,000        674          2,000
     Income from Equity Investments                                          2,100      1,335          2,100
     Payments:
     Interest Expense                                                         (748)       (73)          (159)

     Net Cash Inflow/(Outflow) from Operating Activities                   21,283        320         23,962

Cash Flows from Investing Activities

     Receipts:
     Proceeds of Sale of Property, Plant and Equipment                          -           -           140
     Grants, Subsidies, Contributions and Donations                        94,182      35,033        35,447
     Payments:
     Payments of Property, Plant and Equipment                            (134,136)   (46,073)       (70,223)
     Payments for Intangible Assets                                              -          -            328
     Net Movement in Loans and Advances                                          -          -            125

     Net Cash Inflow/(Outflow) from Investing Activities                   (39,954)   (11,040)       (34,183)

Cash Flows from Financing Activities

     Receipts:
     Proceeds from Borrowings                                                5,000          -          1,549
     Payments:
     Repayment of Borrowings                                                (1,162)      (929)        (1,709)

     Net Cash Inflow/(Outflow) from Financing Activities                     3,838       (929)          (160)

     Net Increase/(Decrease) in Cash and Cash Equivalents held             (14,832)   (11,650)       (10,381)

     Cash and Cash Equivalents at the beginning of the reporting period   104,994     106,126       116,507

     Cash and Cash Equivalents at the end of the reporting period          90,162      94,476       106,126




                                                                                                 Page 52 of 93

Page 53

Attachment 4 - Key Materials & Services Expenditure - Dec 2024


Noosa Council
Summary of Key Materials and Services Expenditure
For the Year Ended 30 June 2025
As at 31 December 2024
                                                         Prior Year          Current         Current
                                                            Actuals          Budget          Budget            Actual         Variance     Annual
                                                               2024             2025             YTD              YTD              YTD     Budget
                                                             ($'000)          ($'000)         ($'000)          ($'000)          ($'000)      %

   Materials and services
   Advertising and Marketing                                    373              240             119              129              (10)      54%
   Administration Supplies and Consumables                      786              780             366              356               10       46%
   Audit Expenditure                                            200              271               3               28              (25)      10%
   Communications and IT                                      1,103            1,337             670              500              170       37%
   Commission Paid                                            1,706            1,752             874              976             (102)      56%
   Consultancy Services                                       1,660            1,989             630              883             (253)     44.4%
   Contract Services                                         28,729           30,154          12,925           12,968              (43)      43%
   Contributions, Donations, Sponsorship and Prizes           4,004            3,757           1,814            1,841              (27)      49%
   Electricity                                                1,683            1,843             991              971               20       53%
   Internal Fleet Costs and External Plant Hire               2,219            2,167           1,066            1,294             (228)      60%
   Grants Paid to Community Organisations                     1,511            1,633           1,098            1,127              (29)      69%
   Insurance                                                    845              943             884              913              (29)      97%
   Legal Expenses                                             3,528            1,258             847              896              (49)     71.2%
   Operating Leases and Rentals                                 472              721             361              357                4       49%
   Software and Maintenance                                   2,642            2,863           1,376            1,430              (55)      50%
   Subscriptions and Registrations                              365              370             259              312              (52)      84%
   Waste Levy Payments                                        2,110            2,608           1,304            1,087              218       42%
   Water and Sewerage Charges                                 1,363            1,211             590              645              (55)      53%
   All Other Materials and Services                           5,137            6,441           2,307            2,415             (108)      37%
                                                             60,436           62,339          28,483           29,127             (644)      47%




Materials & Services variance by funding mechanism
As at 31 December 2024
                                                         Prior Year          Current         Current
                                                            Actuals          Budget          Budget            Actual         Variance     Annual
                                                               2024             2025             YTD              YTD              YTD     Budget
                                                             ($'000)          ($'000)         ($'000)          ($'000)          ($'000)      %

   General rates                                             40,445           39,992           18,793           19,306            (513)      103%
   Commercial operations *                                   16,122           17,057            8,094            7,998               96       99%
   Levy funded                                                3,394            4,544            1,400            1,555            (155)      111%
   Grant funded programs                                        475              746              196              268             (72)      137%
                                                              60,436          62,339           28,483           29,127            (644)       47%




   Notes:
   The above amounts may included levy and grant funded programs. Where budgeted expenditure is unspent these funds will be constrained in reserve
   for future utilisation in accordance with the relevant levy guideline or grant agreement.
   * includes Holiday Parks & Waste Management operations




                                                                                                                                      Page 53 of 93

Page 54

Noosa Council
Summary of Key Materials and Services Expenditure by Branch
For the Year Ended 30 June 2025
As at 31 December 2024
                                                         Prior Year          Current         Current
                                                            Actuals          Budget          Budget            Actual         Variance     Annual
                                                               2024             2025             YTD              YTD              YTD     Budget
                                                             ($'000)          ($'000)         ($'000)          ($'000)          ($'000)      %

   Arts & Culture                                             2,172            2,623            1,185           1,085              100        41%
   Asset Management                                             982            1,284              397             350               47        27%
   Building and Plumbing Compliance                              70               63               20              17                3        27%
   Chief Executive Office                                     1,710              255              205             266              (61)      104%
   Civil Operations                                          10,771            9,490            4,500           5,117             (617)       54%
   Community Connection                                       2,337            2,149            1,100           1,103               (3)       51%
   Community Engagement                                          66              106               42              36                7        34%
   Council Buildings and Facilities                           1,263            1,285              559             525               35        41%
   Customer Experience                                           13               15                9               8                1        55%
   Development Assessment                                     2,119            1,313              847             780               67        59%
   Director Community Services                                   34               33               17              12                5        34%
   Director Corporate Services                                  438              873              240             294              (54)       34%
   Director Development & Regulation                             14               32               17              11                6        33%
   Director Executive Services                                    6               65               15               1               14         1%
   Director Infrastructure Services                           1,250            1,109               66             270             (204)       24%
   Director Strategy & Environment                               25               33               16              17               (0)       51%
   Economic Development & Destination Management              3,085            3,280            1,461           1,462               (0)       45%
   Environmental Services                                     2,466            3,316            1,439           1,393               46        42%
   Executive Support                                             64               86               48              62              (13)       72%
   Financial Services                                           266              431               19              30              (12)        7%
   Fleet                                                      1,576            1,605              854             892              (38)       56%
   Governance                                                 1,114              968              885             922              (36)       95%
   Holiday Parks                                              2,615            2,370            1,168           1,385             (217)       58%
   Information Communication Technology                       4,626            5,326            2,606           2,588               18        49%
   Infrastructure Planning, Design and Delivery                 157              410              132              72               60        17%
   Innovation and Digital Hub                                   471              365              128             205              (77)       56%
   Internal Audit & Corporate Performance                        24              100                3            -                   3         0%
   Local Laws & Environmental Health                            645              708              246             260              (14)       37%
   People and Culture                                           314              343              150             131               19        38%
   Procurement                                                1,277            1,286              626             680              (55)       53%
   Property and Facilities                                    2,312            2,844            1,341           1,396              (55)       49%
   Revenue Services                                             325              324               52              38               14        12%
   Sports & Active Lifestyles                                 1,540            1,593              782             730               52        46%
   Strategic Land Use Planning                                  782            1,568              382             381                1        24%
   Waste                                                     13,508           14,687            6,926           6,613              313        45%

   Total                                                    60,436           62,339           28,483          29,127             (644)       47%




   Notes:
   The above amounts may included levy and grant funded programs. Where budgeted expenditure is unspent these funds will be constrained in reserve
   for future utilisation in accordance with the relevant levy guideline or grant agreement.




                                                                                                                                      Page 54 of 93

Page 55

GENERAL COMMITTEE MEETING                                                           20 JANUARY 2025


8.6     BUDGET REVIEW 2 (BR2) FOR THE 2024/25 FINANCIAL YEAR


Author              Financial Services Manager, Pauline Coles
                    Financial Services | Corporate Services Department
Index               ECM/ Subject/ 7.40 – 2024-2025 Budget
Attachments         1.   Attachment 1 - BR2 Operating Submissions 2024-25
                    2.   Attachment 2 - BR2 Capital Submissions 2024-25
                    3.   Attachment 3 - BR2 Statement of Income and Expenditure 2024-25
                    4.   Attachment 4 - BR2 Budget Financial Statements 2024-25


EXECUTIVE SUMMARY
The Local Government Act 2009 and Local Government Regulation 2012 require Council to
undertake regular reviews of the adopted budget to ensure it remains reflective of planned activities
to be funded through the financial year. This second budget review for the 2024/25 financial year
(BR2) incorporates any new or emergent actions arising from Council resolution, Executive Team or
Capital Works Executive Committee action, reallocation of funds or realised revenue variance since
the adoption of the current BR1 budget in August 2024.

In summary the budget review is proposing to increase Council’s operating position by $278k,
increasing from a $140k deficit to a $138k surplus. This includes a range of emergent costs that
have been funded through additional revenue and grants received year to date. The revised capital
expenditure program has a base capital works program decreasing from $53.8m to $46.1 million. No
changes were made to the QRA funded disaster program which currently amounts to $78.8
million. This brings the total capital works program to $124.9 million.

Item                                        Current Budget         Adjustments Proposed Budget
                                             (BR1) ($’000)              ($’000)   (BR2) ($’000)

Operating Revenue                                $139,994                $1,309          $141,302
Operating Expenditure                            $140,134                $1,030          $141,164
Operating Result                                    ($140)                 $278               $138
Capital Grants and Contributions
                                                   $95,683             ($2,519)            $93,164
Revenue
Capital Works Expenditure                        $132,594              ($7,677)          $124,917




The report also seeks adoption of proposed General Cost Recovery Fees and Commercial Charges
for the Noosa Holiday Parks for the period from January 2026 to July 2026. These fees and charges
are reviewed every six (6) months as required to maintain a consistent annual forward booking period
and ensure full cost pricing principles are adhered to in the coming financial years in line with National
Competition Policy.


With the recent endorsement by Council of Amendment No 2. To the Noosa Plan 2020 a new fee
has been proposed for applications seeking consideration of assessment under the superseded
planning scheme.




                                                                                                     Page 55 of 93

Page 56

GENERAL COMMITTEE MEETING                                                         20 JANUARY 2025



RECOMMENDATION
That Council note the report by the Financial Services Manager to the General Committee Meeting
dated 20 January 2025 regarding Budget Review 2 for the 2024/25 Financial Year and
A. Approve the proposed changes to the budget for the 2024/25 financial year as outlined in the
   Revised Budget Financial Statements provided in Attachment 1 - 4 to the report; and
B. Adopt the proposed general cost recovery fees and commercial charges schedule for Noosa
   Holiday Parks for the period 27 January 2026 to 13 July 2026, and the introduction of an
   application for consideration under the superseded planning scheme fee as detailed in the tables
   contained within the report.


REPORT
Section 170(3) of the Local Government Regulation 2012 allows Council, by resolution, to amend
the budget at any time before the end of the financial year. Consequently, formal budget reviews are
scheduled to occur at least twice annually during August and December, and a third in April if
required, using the latest financial information available as the basis to revise the budget forecast.
The key criteria for budget reviews include:

   1. Council must target compliance with its Financial Sustainability Policy.
   2. The eligible capital or operating projects must be delivery-ready with a commitment to
      complete the project during the year.
   3. Capital submissions will be reviewed and authorised by the Capital Works Executive before
      inclusion as a budget review submission, where the group will consider justification for the
      request, deliverability as well as organisational and community priorities before endorsing
      any capital works.
   4. All operating and capital submissions for additional spend, reallocation of savings or
      additional revenue will be confirmed by the Executive Team based on a business risk
      assessment.
The revised statement of comprehensive income, included as Attachment 3, identifies the financial
statement line items that have been affected by the proposed budget adjustments. The budget
financial statements, included in Attachment 4, also identify the impact of the proposed budget
adjustments to Council’s financial sustainability indicators.

1. Proposed Operating Budget Adjustments

A proposed 42 operational budget adjustments will result in a $278k improvement to the
operating deficit. The following table summarises the operational submissions by type of
funding, with a detailed list contained in Attachment 1. The financial statements in Attachments
3 and 4 outline the revised budget position as a result of these proposed adjustments.

 Type                                    Submissions        Revenue         Expense              Net
                                                              ($’000)        ($’000)         ($’000)
 Additional Revenue                            3                $885           $274            $611
 General Revenue Funded (Emergent)             25             ($159)             $375         ($534)
 Grant Funded                                  13               $582             $381          $201
 Levy Funded                                   1                  $-               $-             $-
 Total                                         42             $1,308          $1,030           $278




                                                                                                Page 56 of 93

Page 57

GENERAL COMMITTEE MEETING                                                          20 JANUARY 2025



2. Proposed Capital Budget Adjustments
A total of 36 budget review submissions were received for capital works projects, with a
proposed decrease of $7.6 million to the 2024/25 capital works program excluding disaster
funded projects.

With the delivery of QRA funded disaster projects currently under construction, the current year
capital works program includes $78.8 million of QRA funded disaster. These projects relate to
the February 2022 flood event and are fully funded by the Queensland Reconstruction Authority
(QRA). All capital submissions have been reviewed by the Capital Works Executive.

The following table summarises the proposed revised 2024/25 capital budget.

Total Capital Budget                               Amount
                                                   ($'000)
Original Budget                                        $45,246
BR1 Adjustments                                         $8,620
QRA Funded disaster projects (carryover)               $78,728
Current Capital Expenditure Budget                    $132,594
Proposed BR2 Adjustments                               ($7,677)
Revised BR2 Capital Expenditure Budget                $124,917

The following table summarises the budget submissions by program and categorised as:

   •   Multi-Year Rescheduling: Where timing of design and construction works for major projects
       straddle multiple financial years, or commencement has been delayed, and the budget has
       been reallocated to future years.
   •   Emergent Works & Variations: Initiation of new capital works items which have arisen since
       BR1 or where there has been a variation due to the acceptance of tender, change in scope,
       reallocation of funds or savings realised upon completion with project being under budget.
   •   Project Savings / Transfers: These are realised savings on existing capital works projects
       which have been re-allocated to fund emergent works and variations.
The following table summarises the proposed revised 2024/25 capital budget by program, with the
full program contained in Attachment 2.


                                      Current        Multi        Emergent      Project    Proposed
 Program                              Budget          Year         works &     Savings /    Budget
                                       (BR1)       Scheduling     Variations   Transfers     (BR2)
 Capital Works
   Bridges                                 2,002        (300)                      (634)       1,068
   Cemeteries                                89                                                  89
   Coastal Canals and Waterways            3,163        (700)                      (221)       2,242
   Commercial Land & Properties             120                                                 120
   Community Facilities                    1,413                        125                    1,538
   Corporate Buildings                     1,876                         68                    1,944
   Environmental Assets, Bushland,
                                            878                                                 878
   Tracks and Trails




                                                                                                Page 57 of 93

Page 58

GENERAL COMMITTEE MEETING                                                       20 JANUARY 2025


   Gravel Road Network                     401                                                 401
   Holiday Parks                           120                                                 120
   Libraries and Galleries                 481                                                 481
   Parks & Playgrounds                   2,970                                               2,970
   Pathways & Boardwalks                 2,384                       60         (55)         2,389
   Public Amenities                        722                      220                        942
   Public Transport Infrastructure         712                                                 712
   Sealed Roads Network                  8,282                      457                      8,739
   Sports Ground and Facilities          2,246       (1,000)        150                      1,396
   Stormwater Drainage                   1,984         (400)         76                      1,660
   Streetscapes and Road
 Corridors
                                            88                       62                        150
  Transport and Infrastructure
                                         1,100                      (62)                     1,038
  Mgmt
   Waste Management                     10,147       (5,750)                                 4,397
 Other Works
   Asset Management                      1,997                                 (713)         1,284
   Fleet - Plant Replacement             3,906                      946                      4,852
   Strategic Planning                    4,801         (351)        196                      4,646
   ZEN Program                             743                                                 743
   Loan Redemption                       1,241                                               1,241
 Total Base Capital Program             53,866       (8,501)       2,297     (1,623)        46,040
 QRA Funded Disaster Program
   Disaster Recovery works              78,727                       150                    78,877
 Grand Total                           132,593       (8,501)       2,447     (1,623)       124,917


3. Fees and Charges Amendments

Holiday Park Fees and Charges

Current fees and charges for the Noosa Holiday Parks apply until 26 January 2026. Council
maintains an ‘advance’ fees and charges schedule for the parks to allow for forward booking of sites
by customers.

Twice yearly, Council reviews and amends the fees, including benchmarking and suitability
assessment of the fee and charge categories.

This report proposes the adoption of fees and charges for the Noosa Holiday Parks for a further six
(6) months to the end of the July 2026 school holiday period, as indicated in Tables 1-4.




                                                                                              Page 58 of 93

Page 59

GENERAL COMMITTEE MEETING                                                              20 JANUARY 2025


Table 1. Boreen Point Campground


                                         27 January 2026 to 12 July 2026
                                           OFF PEAK                                    PEAK
                                                    Change Change                  Change Change
                          Current        Proposed                 Current Proposed
                                                      $      %                       $      %
  Powered Sites           $51.00          $53.00     $2.00     3.9%        $56.00   $58.00     $2.00   3.6%

  Unpowered Sites         $45.00          $47.00     $2.00     4.4%        $50.00   $52.00     $2.00   4.0%


Table 2. Noosa North Shore Campground


                                         27 January 2026 to 12 July 2026
                                            OFF PEAK                                   PEAK
                                                    Change Change                  Change Change
                          Current        Proposed                 Current Proposed
                                                      $      %                       $      %
  Powered Sites – Bush        $59.00      $61.00     $2.00     3.4%        $67.00   $69.00     $2.00   3.0%
  Powered Sites – Beach       $63.00      $65.00     $2.00     3.2%        $70.00   $72.00     $2.00   2.9%

  Unpowered Sites             $46.00      $48.00     $2.00     4.3%        $54.00   $56.00     $2.00   3.7%

Table 3. Noosa River Holiday Park


                                          27 January 2026 to 12 July 2026

                              OFF PEAK                         PEAK                          SHOULDER
                                           Change                          Change                  Change
                    Current Proposed              Current    Proposed             Current Proposed
                                             %                               %                       %
    Powered          $64.00     $66.00      3.1%    $79.00     $81.00       2.5%    $71.00    $73.00    2.8%
     Sites

    Unpowered        $55.00     $57.00      3.6%    $69.00     $71.00       2.9%    $62.00    $64.00    3.2%
      Sites
    Unpowered
    Waterfront       $60.00     $62.00      3.3%    $75.00     $77.00       2.7%    $67.00    $69.00    3.0%
      Sites
     Powered
                $57.00          $59.00      3.5%    $74.00     $76.00       2.7%    $65.00    $67.00    3.1%
  Motorhome Bay




                                                                                                       Page 59 of 93

Page 60

GENERAL COMMITTEE MEETING                                                           20 JANUARY 2025


Table 4. Other Noosa Holiday Park Fees and Charges


                                  27 January 2026 to 12 July 2026
                                                                                       Change Change
                                                                     Current Proposed
                                                                                         %       %
  Extra Persons Nightly – Over 5 Years – Boreen Point & Northshore    $12.00    $12.00 $0.00   0.0%
  Extra Persons Nightly – Over 5 Years – Noosa River                  $14.00    $14.00 $0.00   0.0%
  Extra Vehicles Nightly – if space allows                             $5.50     $6.00 $0.50   9.1%
  Unpowered short term budget site – All Periods – Noosa River        $32.00    $32.00     $0.00      0.0%
  Public Use of Amenities – Per Day                                    $4.00     $4.00     $0.00      0.0%
  Late Checkout                                                       $18.00    $19.00     $0.00      5.6%
  Group Fee (20+) – per booking                                       $13.00    $14.00     $1.00      7.7%
  Washing Machine Charges                                              $6.00     $6.00     $0.00      0.0%
  Dryer Charges                                                        $4.00     $4.00     $0.00      0.0%
  Administration Fee (Cancellations & Amendments)                     $32.00    $32.00     $0.00      0.0%
  Electricity – Daily Access Charge per day                           $1.20     $1.20      $0.00      0.0%
  Electricity – Usage rate per kWh                                    $0.45     $0.45      $0.00      0.0%

Revenue generated by the holiday parks is shared between the Noosa Holiday Parks Management
contractor and Council based on a revenue split arrangement. The cost of delivering the services
associated with the holiday parks as like any business are subject to inflationary
pressures. Accordingly, the proposed fees and charges consider these cost increases to effectively
deliver the Noosa Holiday Parks program into the future.

The proposed fees and charges have also been benchmarked and tested against fees and charges
adopted by government and privately owned camping and caravan parks located in the Fraser Coast
Council, Gympie Regional Council, Sunshine Coast Council, Tweed Shire Council and Byron Bay
Council regions to ensure the proposed fees and charges are in line with industry pricing.

Over time, the Noosa Holiday Park program has developed into a high quality and popular
recreational camping and caravaning tourism offering. Visitation levels have consistently grown year
on year. The proposed fees and charges are considered commensurate with safeguarding and
maintaining the viability of the Noosa Holiday Parks into the future.

Superseded Planning Scheme

With the recent endorsement of Amendment No 2. to the Noosa 2020 plan by Council, a fee for a
development application to be considered under the superseded planning scheme is also being
proposed.

 Fee Name                                        Fee         Legislative        GST     Fee Type
                                              (inc GST)      Reference

 Request for an application to                $1,560.00   Local Government      N       Application
 considered under the Superseded                          Act 2009 | 97(2)(a)           Fee
 Planning Scheme (BASE FEE)




                                                                                                      Page 60 of 93

Page 61

GENERAL COMMITTEE MEETING                                                                         20 JANUARY 2025


4. Organisational Establishment

The last review of the organisational structure was reported to the Council at the Special Meeting on
28 June 2024 as part of budget adoption process. Several submissions were received
as part of the budget review process for new and extended temporary and permanent
positions, as well as the conversion of 2 temporary positions to permanent establishment. Details
of these submissions are outlined in the table below.




* The increase in workplace health and safety positions is being funded through savings in workcover premiums resulting
from the change in service provider.

# Previously the Heritage Coordinator position (0.26 FTE) was part funded via the heritage levy. With the cessation and

redesign of the coordinator position the new Heritage Librarian position (0.51 FTE) will now be part funded by the heritage
levy.

Link to Corporate Plan

Theme No. 5 - Excellence
This theme focuses on customer experience, financial sustainability, innovation and technology,
levels of service, governance, our employees and volunteers, funding streams and asset
management practices.


Previous Council Consideration
The 2024/25 original budget was adopted by Council resolution on 28 June 2024 (Ref. Special
Meeting Minutes, 28 June 2024, Item 2.4, Page 72).

The original 2024/25 fees and charges were adopted by Council resolution on 20 June 2024 (Ref.
Ordinary Meeting Minutes, 20 June 2024, Item 8.4, Page 12).

The 2024/25 budget review 1 (BR1) was adopted by Council resolution on 15 August 2024 (Ref.
Ordinary Meeting Minutes, 15 August 2024, Item 8.3, Page 8).

The revised 2024/25 fees and charges were adopted by Council resolution on 15 August 2024 (Ref.
Ordinary Meeting Minutes, 15 August 2024, Item 8.3, Page 8).




                                                                                                                    Page 61 of 93

Page 62

GENERAL COMMITTEE MEETING                                                         20 JANUARY 2025



Finance
Budget Review 2 continues Council’s focus on, and compliance with, its Financial Sustainability
Policy. Council has an ongoing responsibility to ensure that it has sufficient resources now and
into the future to provide levels of service that are both affordable and considered appropriate
by the community. This responsibility encompasses how decisions are made regarding the
allocation of ratepayer funds to Council’s day to day operations as well as towards the
replacement of existing assets and procurement of new assets.

The key measurement criteria for whether Council is achieving its financial sustainability objectives
over the short and medium term are the achievement of set targets for a variety of financial
sustainability ratios which are required to be published under legislation. These ratios effectively
allow the community to determine:
1. If Council is appropriately funding its day to day operations and asset consumption costs (i.e.
   the operating surplus ratio);
2. Ensuring its debt is at a level that can be repaid from current operating revenues (i.e. the net
   financial liabilities ratio); and
3. Replacing community infrastructure when required and to ensure asset service levels can be
   maintained (i.e. the asset sustainability ratio).
Budget Review 2 continues Council’s financial sustainability commitment with all ratios within the
benchmark ranges set by the Queensland Government:
                                                                    Original
Indicator                               Target                                       BR1        BR2
                                                                    Budget
Council Controlled Revenue Ratio        No set target                 75.9%         75.2%     74.05%

Operating Surplus Ratio                 Greater than 0%               0.10%         (0.1%)      0.1%

Operating Cash Ratio                    Greater than 0%              18.10%         17.7%      17.8%

Unrestricted Cash Expense Cover Ratio Greater than 3 months       7.7 months    7.3 months 7.4 months

Total Cash Expense Cover Ratio          Greater than 3 months     8.9 months    9.4 months 9.5 months

Asset Sustainability Ratio              Greater than 80%            102.70%        136.7%     116.6%

Leverage Ratio                          0-3 times                   1.1 times    1.2 times 0.94 times

Net Liabilities Ratio                   Less than 60%                 0.70%         (3.2%)     (7.0%)




Risk & Opportunities
In order to manage and mitigate these risks Council uses various tools which include monthly
ongoing financial reporting to identify and address emerging issues, conservative budgeting,
compliance with the Financial Sustainability Policy, regular budget reviews, effective liquidity
management to ensure sufficient fiscal flexibility, as well as adhering to the Reserves and Restricted
Cash policy which requires that Council maintains both a disaster management reserve and a
minimum 3 months cash cover to fund emergent matters.

Some examples of potential risks that may impact on Council’s operational performance, capital
program delivery, cashflow and cash reserves include:
•   substantial damage to or failure of Council infrastructure due to natural disaster or other
    emergent issue that may require significant unplanned investment;



                                                                                                Page 62 of 93

Page 63

GENERAL COMMITTEE MEETING                                                                20 JANUARY 2025


•       Prolonged closure of Council facilities due to unforeseen circumstances;
•       A prolonged IT system failure affecting Council’s ability to deliver services or issue rates notices;
•       Economic conditions affecting ratepayers’ ability to pay rates;
•       Market driven increases in construction and operational costs significantly above estimates;
•       Labour and material shortages and delays.
•       Fraud attempts may result in financial impacts to Council if funds cannot be recovered
•       Reliance on non-recurrent revenue streams (ie interest revenue on grants and short term cash
        holdings) to fund business as usual operations may result in higher rate increases in future years
        or service level cuts to fund potential shortfalls.
Council is currently in the process of negotiating its new Certified Agreement, with the current
agreement expiring in February 2025. As these negotiations are ongoing and have not yet been
finalised, no financial impact arising from these negotiations has been recognised in this budget
review.

Human Rights
Human Rights Compatibility Statement
In developing this Report, the subject matter has been considered in accordance with the
requirements of the Queensland Human Rights Act 2019. It is considered that the subject matter
does not conflict with any human rights and supports a human rights approach to decision making
by Council. Council representatives will endeavour to act and make decisions under this report in a
manner that is compatible with human rights. This report should be read in conjunction with
Council’s Human Rights Policy.

Consultation
External Consultation - Community & Stakeholder
Nil.


Internal Consultation
Financial Services have been in contact with all Council branches. Directors of each department
have reviewed endorsed all submissions received. The Executive Team has also reviewed and
endorsed all submissions received.
Departments consulted:
        Office of the CEO, Mayor &            Community Services                 Corporate Services
                Councillors
    x     Mayor & Councillors           x   Director                      x   Director
    x     Chief Executive Officer       x   Community Development         x   Financial Services

    x     Executive Officers            x   Sport & Active Lifestyles     x   Fleet

    x     Community Engagement          x   Arts & Culture                x   Revenue Services

    x     People & Culture              x   Community Connection          x   ICT

    x     Governance                   x    Customer Experience           x   Procurement

                                                                          x   Commercial Property

         Strategy & Environment             Development & Regulation           Infrastructure Services
    x     Director                      x   Director                      x   Director




                                                                                                         Page 63 of 93

Page 64

GENERAL COMMITTEE MEETING                                                          20 JANUARY 2025


 x   Strategic Land Use Planning       x   Development Assessment   x   Infrastructure Planning, Design
                                                                        and Delivery
 x   Economic Development          &   x   Local Laws               x   Civil and Asset operations
     Destination Management
 x   Environmental Services            x   Environmental Health     x   Waste
 x   Innovation & Digital Hub          x   Building & Plumbing      x   Building & Facilities
                                       x   Property / Permits       x   Disaster Management




                                                                                                     Page 64 of 93

Page 65

Attachment 1

2024/25 Budget Review 2 - Operating Submissions

                                                                                                                                                                                            Expense               Revenue           Proposed BR2
Item                                         Description                                                                                                                                     ($'000)               ($'000)           adjustment
                                                                                                                                                                                             increase /           (increase) /         ($'000)
                                                                                                                                                                                            (decrease)*            decrease*        increase / (decrease)

Additional Revenue
Financial Services                           Additional Interest Revenue YTD upside                                                                                                                                    (561,000)                   561,000
Holiday Parks                                YTD Holiday Park Revenue upside offset with additional associated expenditure                                                                          193,983            (193,983)                            -
Local Laws                                   Additional Infringement revenue offset by casual staffing requirements                                                                                  80,000             (80,000)                         -
Property and Facilities                      Recoupment of utility costs from leased properties                                                                                                                         (50,000)                    50,000
Additional Revenue Total                                                                                                                                                                            273,983            (884,983)                   611,000
General Rate Funded (Emergent)
All Departments                              Workforce planning (position responsibility reviews, market adjustments and redesigns)                                                                 231,789                                      (231,789)
                                             Vacancy Dividend YTD recoupment                                                                                                                        580,000                                      (580,000)
                                             Vacancy Savings YTD                                                                                                                                  (580,000)                                        580,000
Buildings and Facilities                     Asset Management Planning reallocate M&S to Emp Costs                                                                                                            -                                             -
Cemeteries                                   Cemetaries mowing contract                                                                                                                              30,000                                       (30,000)
Civil Operations                             Deck and Boardwalk contract savings                                                                                                                    (40,000)                                        40,000
                                             Noosa Botanic Gardens Masterplan                                                                                                                        91,100                                       (91,100)
Community Engagement                         New temporary Community Engagement Officer (12 mths)                                                                                                    54,830                                       (54,830)
                                             Equipment & for new temporary Community Engagement Officer (12 mths)                                                                                     5,000                                         (5,000)
Heritage                                     Redesign Hertitage Coordinator posiiton to Heritage Advisor 0.6 FTE and Hertiage Librarian 0.8 FTE part Heritage Levy funded                           (10,438)                                        10,438
North Shore Ferry                            North shore ferry operational costs offset by increased revenue                                                                                         26,000              (26,000)                           -
People and Culture                           Temporary position extension - Employee Relations Officer (6mths)                                                                                       68,060                                       (68,060)
                                             Permanent Conversion of Temporary Payroll Officer position                                                                                              48,523                                       (48,523)
Procurement and Contracts                    Permanent Conversion of Temporary Procurement & Contracts Officer                                                                                       44,369                                       (44,369)
Property and Facilities                      Lifeguard Services contract savings                                                                                                                    (70,200)                                        70,200
                                             Council property maintenance cost saving                                                                                                                (7,500)                                         7,500
                                             Commercial property lease terminations - revenue reduction                                                                                                                   64,520                  (64,520)
                                             Commercial lease default costs                                                                                                                          29,000                                       (29,000)
                                             Temporary Events and Permit revenue forecast reduction                                                                                                                       30,333                  (30,333)
Revenue Services                             YTD Shortfall in Rates revenue from valuation charges                                                                                                                        90,000                  (90,000)
Workplace Health and Safety                  New Position : Senior WHS Advisor (1.0 FTE) funded from Workcover premium savings                                                                      104,067                                      (104,067)
                                             FTE Increase : WHS Support Office (0.5 to 1.0 FTE) funded from Workcover premium savings                                                                24,305                                       (24,305)
                                             FTE Increase :Employee Wellbeing & Injury Management Officer (0.6 to 0.7 FTE) funded from Workcover premium savings                                      5,366                                         (5,366)
                                             Forecast Workcover premium savings                                                                                                                   (258,667)                                        258,667
General Rate Funded (Emergent) Total                                                                                                                                                                375,603              158,853                 (534,456)
Grant / Partnership Funded
Art Gallery and Butter Factory               Floating Land 2025                                                                                                                                      63,000              (63,000)                           -
Community Development                        Disaster Management Risk Audit Grant - expenditure in FY 2024                                                                                                               (78,809)                   78,809
                                             Recovery and Resilience Officer - Cat C Grant reallocation                                                                                             (55,723)              55,723                            -
                                             Recovery and Resilience Officer - Cat C reallocate M&S to Emp Costs                                                                                              -                                             -
                                             Youth Justice Community-based Crime Action Grant reallocate M&S to Emp Costs                                                                                     -                                             -
Community Facilities                         QRA FRRP Grant - Girraween Sports Oval Embankment                                                                                                        1,340              (26,280)                   24,940
Economic Development                         Additional funding ANU Colab Program - BOAR                                                                                                             63,122              (63,122)                           -
                                             Eco-Certified Tourism Destination Program                                                                                                               50,744              (50,744)                           -
                                             Living Fire Tech Lab - Disaster Rec Cat D final grant payment                                                                                                               (97,988)                   97,988
                                             Regional Enablers Grant Program                                                                                                                         90,000              (90,000)                           -
Environmental Services and Protection        Roost Management Plans - Pinaroo Park Grant                                                                                                             10,850              (10,850)                           -
Noosa Community Support                      Seniors Social Isolation Grant Program                                                                                                                  30,000              (30,000)                           -
Waste Management                             Let’s Get it Sorted Partnership Program                                                                                                                127,455            (127,455)                         -
Grant / Partnership Funded Total                                                                                                                                                                    380,788            (582,525)                   201,737
Levy Funded
Heritage                                     Redesign Hertitage Coordinator posiiton to Heritage Advisor 0.6 FTE and Hertiage Librarian 0.8 FTE part Heritage Levy funded                                 (0)                                           (0)
Levy Funded Total                                                                                                                                                                                         (0)                                           (0)
Grand Total                                                                                                                                                                                      1,030,374          (1,308,654)                   278,281

* Positive and negative signage applied to this table to reflect accounting debit and credit principles. For example, an increase in cost or a reduction in revenue is denoted as a positive / debit amount




                                                                                                                                                                                                                                                                Page 65 of 93

Page 66

                                                                                                                                                                                                                                            Attachment 2
                                                                                                                                                                                 RENEWAL, NEW, EXPANSIONS & UPGRADE CAPITAL PROJECTS
                                                                                                                                                                                                            2024/25 Capital Program - Budget Review 2
                                                                                                                                                                                                               Depreciation     General
                                                                          Current Budget  Multi Year  Emergent Works &     Savings &                                                    Levy        Other
  Program                                                                                                                                  Total        Grants       Loans                                     funded Cash        Cash            Total
                                                                              (BR1)      Rescheduling    Variations        Transfers                                                Reserves     Reserves
                                                                                                                                                                                                                   Reserve      Reserve

Asset Management
  Renewal
      Shire Bridge Annual Level 3 Bridge & Structure Inspections                159,900                                        (99,000)        60,900                                                                 60,900                       60,900
      Shire Pavement Management System Road Surface Condition Modelling          50,000                                                        50,000                                                                 50,000                       50,000
      Shire CCTV Drainage Condition Assessment Program                           66,720                                         99,000        165,720                                                                165,720                      165,720
  New, Expansion & Upgrade
      Shire - Survey Equipment                                                  129,592                                                       129,592                                                                             129,592         129,592
      VHF Communication System                                                 1,590,502                                      (712,500)       878,002     778,000                                                                 100,002         878,002
Asset Management Total                                                         1,996,714               -               -      (712,500)     1,284,214     778,000            -             -           -             276,620      229,594       1,284,214

Bridges
  Renewal
  Tewantin Doonella Bridge Renewal                                             1,025,000      (300,000)                                       725,000     362,500                                                    362,500                      725,000
  Noosa Heads Garth Prowd Bridge Renewal                                        977,239                                       (634,000)       343,239     171,620                                                  171,619.00                     343,239
Bridges Total                                                                  2,002,239      (300,000)                -      (634,000)     1,068,239     534,120            -             -           -             534,119          -         1,068,239

Cemeteries
  Renewal
  Cooroy Cemetery Burial Beam                                                     41,000                                                       41,000                                                                  41,000                      41,000
  Cooroy Cemetery Entrance Renewal                                                28,429                                                       28,429                                                                  28,429                      28,429
  New, Expansion & Upgrade
  Tewanting Cemetery Shoring                                                      20,000                                                       20,000                                                                              20,000          20,000
Cemeteries Total                                                                 89,429            -               -               -           89,429            -           -             -           -              69,429       20,000          89,429

Coastal Canals and Waterways
  Renewal
  Noosa Heads Main Beach Sand Recycling System Pipework Renewal                  200,000                                                      200,000                                  200,000                                                    200,000
  Noosaville - Renewal Rock Armour Around Noosa River                            200,000                                                      200,000                                                                 200,000                     200,000
  Shire Beach Access Renewal Program                                             256,300                                                      256,300                                                                 256,300                     256,300
  Shire Beach Shower Renewal Program                                              62,600                                                       62,600                                                                  62,600                      62,600
  Renewal of revetment wall at O-Boats Gympie Tce, Noosaville                    417,296      (300,000)                                       117,296                                                                 117,296                     117,296
  Noosa Shire Council’s Noosa Main Beach Sea Wall Detailed Design                532,466      (100,000)                                       432,466      216,233                                                    216,233                     432,466
  Noosa Waters Revetment Wall                                                     32,902                                                       32,902                                                                  32,902                      32,902
  Claude Batten Drive – Mains Water Supply Renewal                               198,420                                                      198,420                                                                 198,420                     198,420
  Moorindil St Ferry Landings - Ferry landings/banks stabilisation               165,184                                                      165,184                                                                 165,184                     165,184
  Noosa Heads Dog Beach SEMP                                                     616,028                                      (221,000)       395,028                                                                 395,028                     395,028
  New, Expansion & Upgrade
  Noosa Main Beach Removable Sand Break Seating Structure                         50,000                                                       50,000                                                                              50,000          50,000
  Living Foreshores Hilton Esplanade                                             432,253      (300,000)                                       132,253      132,253                                                                                132,253
Coastal Canals and Waterways Total                                             3,163,449      (700,000)                -      (221,000)     2,242,449     348,486            -         200,000         -            1,643,963      50,000       2,242,449

Commercial Land & Property
  New, Expansion & Upgrade
  Pomona - Kindergarten - Bathroom Facilities Upgrade                            120,171                                                      120,171                                                                  60,086      60,086         120,171
Commercial Land & Property Total                                                 120,171               -               -               -      120,171            -           -             -           -              60,086       60,086         120,171




                                                                                                                                                                                                                                            Page 66 of 93

Page 67

                                                                                                                                                                                                                                               Attachment 2
                                                                                                                                                                                 RENEWAL, NEW, EXPANSIONS & UPGRADE CAPITAL PROJECTS
                                                                                                                                                                                                               2024/25 Capital Program - Budget Review 2
                                                                                                                                                                                                                  Depreciation     General
                                                                       Current Budget  Multi Year  Emergent Works &    Savings &                                                        Levy        Other
  Program                                                                                                                              Total           Grants        Loans                                        funded Cash        Cash             Total
                                                                           (BR1)      Rescheduling    Variations       Transfers                                                    Reserves     Reserves
                                                                                                                                                                                                                      Reserve      Reserve

Community Facilities
  Renewal
  Noosa Heads - J Audio Visual Equipment Renewal Program                       90,000                                                      90,000                                                                         90,000                      90,000
  Noosaville - Noosa Leisure Centre - Renewal Work                             60,000                                                      60,000                                                                         60,000                      60,000
  Sunrise Beach - Noosa Aquatic Centre - AMP Renewals Program                 148,000                                                     148,000                                                                        148,000                     148,000
  Sunshine Beach - Lifeguard Tower - Roof Replacement                          27,082                                                      27,082                                                                         27,082                      27,082
  Noosaville - Noosa Leisure Centre - Court 2 Renewal                         147,617                                                     147,617                                                                        147,617                     147,617
  Noosa Heads - The J - Replacement of HVAC System                            547,598                                                     547,598                                                                        547,598                     547,598
  Noosa Heads - Visitor Information Centre - Building Repairs                                                 83,710                       83,710                                                                         83,710                      83,710
  Noosaville - Noosa Seniors Flooring Replacement                                                             41,000                       41,000                                                    41,000                                           41,000
  New, Expansion & Upgrade
  Tewantin Childcare (19 Moorindil St) - Roof Replacement                     180,524                                                     180,524                                                                        180,524                     180,524
  Noosaville - Wallace Park Precinct - External CCTV Camera Install           144,000                                                     144,000                                                                                    144,000         144,000
  Peregian Beach - Digital Hub - HVAC Upgrade                                  38,500                                                      38,500                                                                                     38,500          38,500
  Cooran - 12 King St - Shade Umbrellas                                        30,000                                                      30,000                                                                                     30,000          30,000
Community Facilities Total                                                  1,413,321              -         124,710               -    1,538,031               -            -             -         41,000            1,284,531     212,500        1,538,031

Corporate Buildings
  Renewal
  Tewantin - Administration Building - Replace Main Aircon Condenser          366,900                                                     366,900                                                                        366,900                     366,900
  Shire Corporate Building Renewal Program                                    300,000                      (176,741)                      123,259                                                                        123,259                     123,259
  Shire - Council Buildings - Access Control                                  194,400                                                     194,400                                                                        194,400                     194,400
  Pomona - Depot - Office Accommodation                                       100,000                         54,000                      154,000                                                                        154,000                     154,000
  Depot Building Renewal                                                       95,295                                                      95,295                                                                         95,295                      95,295
  Noosa Shire Building CCTV Program                                            50,068                                                      50,068                                                                         50,068                      50,068
  Noosaville Depot LDCC Building Roof Replacement                                                             64,086                       64,086                                                                                     64,086          64,086
  Noosa Depot & Tewantin Admin Bld ICT Core Switch Replacement                                                 4,000                           4,000                                                                                   4,000            4,000
  New, Expansion & Upgrade
  Noosaville - 90 Goodchap Street                                             769,594                        122,741                      892,335                                                                        122,741     769,594         892,335
Corporate Buildings Total                                                   1,876,257              -          68,086               -    1,944,343               -            -             -            -              1,106,663     837,680        1,944,343

Disaster Projects
  Renewal
  QRA Funded Disaster Projects (Various)                                   78,727,487                        150,000                    78,877,487      78,727,487                                                                   150,000       78,877,487
Disaster Total                                                             78,727,487              -         150,000               -   78,877,487      78,727,487            -             -            -                    -       150,000       78,877,487

Environmental Assets, Bushland, Tracks and Trails
  Renewal
  Eastern Beaches Coastal Creeks Investigation                                 57,618                                                      57,618                                                                         57,618                      57,618
  New, Expansion & Upgrade
  Kin Kin - Wahpunga (Trail 4) & Woondum (Trail 3) - Trail Renewal            820,000                                                     820,000         410,000                                                        205,000     205,000         820,000
Environmental Assets, Bushland, Tracks and Trails Total                      877,618           -                -             -           877,618         410,000            -             -            -               262,618      205,000         877,618

Fleet - Plant Replacement
  Renewal
  Council Fleet and Plant Replacement Program                               3,906,549                        873,407                     4,779,956                                                 2,546,852           2,233,104                    4,779,956
  Noosa Shire - Fire Levy - Bushfire Vehicle Modifications                                                    72,120                       72,120                                       72,120                                                        72,120
Fleet - Plant Replacement Total                                             3,906,549          -            945,527           -         4,852,076               -            -          72,120    2,546,852            2,233,104         -          4,852,076




                                                                                                                                                                                                                                               Page 67 of 93

Page 68

                                                                                                                                                                                                                                   Attachment 2
                                                                                                                                                                   RENEWAL, NEW, EXPANSIONS & UPGRADE CAPITAL PROJECTS
                                                                                                                                                                                                2024/25 Capital Program - Budget Review 2
                                                                                                                                                                                                   Depreciation       General
                                                                 Current Budget  Multi Year  Emergent Works &   Savings &                                                 Levy        Other
  Program                                                                                                                   Total         Grants       Loans                                       funded Cash          Cash             Total
                                                                     (BR1)      Rescheduling    Variations      Transfers                                             Reserves     Reserves
                                                                                                                                                                                                       Reserve        Reserve
Gravel Road Network
  Renewal
  Shire Gravel Resheeting Program                                       400,838                                                400,838                                                                    400,838                        400,838
Gravel Road Network Total                                              400,838               -            -            -       400,838             -           -             -            -              400,838            -            400,838


Holiday Parks
  New, Expansion & Upgrade
  Noosa North Shore - Campground - Generator Install                     46,200                                                 46,200                                                 46,200                                             46,200
  Noosa North Shore - Campground Water Distribution                      22,000                                                 22,000                                                 22,000                                             22,000
  Noosa River Holiday Park - Street Lighting Renewal                     51,300                                                 51,300                                                 51,300                                             51,300
Holiday Parks Total                                                    119,500           -                -            -       119,500             -           -             -        119,500                -              -            119,500

Libraries and Galleries
  Renewal
  Butter Factory Arts Centre Heritage Restoration Works                 277,400                                                277,400                                   277,400                                                         277,400
  Whole of Shire Mobile Library Service Solution                         40,000                                                 40,000                                                 40,000                                             40,000
  New, Expansion & Upgrade
  Shire - New Regional Gallery Stage 3 - Business Case                  163,463                                                163,463                                                                                  163,463          163,463
Libraries and Galleries Total                                          480,863           -                -            -       480,863             -           -         277,400       40,000                -          163,463          480,863

Loan Redemption
  New, Expansion & Upgrade
  QTC Capital Debt Redemption                                         1,241,000                                               1,241,000                                                                                1,241,000       1,241,000
Loan Redemption Total                                                 1,241,000          -                -            -     1,241,000             -           -             -            -                  -        1,241,000        1,241,000

Parks & Playgrounds
  Renewal
  Noosa Waters Entry Statement Renewal                                   94,598                                                 94,598                                                                     94,598                         94,598
  Noosaville - Apex Park Fitness Equip - Upgrade - LGIP                 124,142                                                124,142                                                                    124,142                        124,142
  Noosaville - Quota Park-Wheelchair Accessible Park Furniture           55,725                                                 55,725                                                                     55,725                         55,725
  Noosaville Lions Park Pirate Playground Renewal                       100,000                                                100,000                                                                    100,000                        100,000
  Shire BBQ Renewal Program                                              12,000                                                 12,000                                                                     12,000                         12,000
  Shire Park Furniture Renewal Program                                  200,000                                                200,000                                                                    200,000                        200,000
  Shire Park Shelter Renewal Program                                    116,200                                                116,200                                                                    116,200                        116,200
  New, Expansion & Upgrade
  Cooroy - Noosa Botanic Gardens - Plant & Equipment Shed               160,000                                                160,000                                                                     80,000        80,000          160,000
  Cooroy - Noosa Botanic Gardens - Staff Toilet Facility                 25,807                                                 25,807                                                                                   25,807           25,807
  Noosa Hinterland Priority Playground - Planning & Design              125,000                                                125,000                                                                                  125,000          125,000
  Peregian Beach Skate Park Design & Construct                          486,881                                                486,881                                                                                  486,881          486,881
  Peregian Square - Landscape Design and Delivery                        64,350                                                 64,350                                                                     32,175        32,175           64,350
  Sunshine Beach Ed Webb Park Upgrade                                 1,405,130                                               1,405,130      790,346                                                              0     614,784        1,405,130
Parks & Playgrounds Total                                             2,969,833          -                -            -     2,969,833      790,346            -             -            -              814,840      1,364,647        2,969,833




                                                                                                                                                                                                                                   Page 68 of 93

Page 69

                                                                                                                                                                                                                                                   Attachment 2
                                                                                                                                                                                          RENEWAL, NEW, EXPANSIONS & UPGRADE CAPITAL PROJECTS
                                                                                                                                                                                                                   2024/25 Capital Program - Budget Review 2
                                                                                                                                                                                                                      Depreciation     General
                                                                                  Current Budget  Multi Year  Emergent Works &    Savings &                                                      Levy      Other
  Program                                                                                                                                         Total         Grants        Loans                                   funded Cash        Cash            Total
                                                                                      (BR1)      Rescheduling    Variations       Transfers                                                  Reserves   Reserves
                                                                                                                                                                                                                          Reserve      Reserve

Pathways & Boardwalks
  Renewal
  Noosa Hinterland Condition Assessment and Prioritisation                                18,897                                                      18,897                                                                  18,897                      18,897
  Noosaville - Seagull Park - Pathway renewal                                            101,919                                                     101,919                                                                 101,919                     101,919
  Shire Wide - Pathway Renewal Program                                                 1,025,000                                                    1,025,000                                                              1,025,000                   1,025,000
  Sunshine Beach BelmoreTce Pathway Renewal                                               44,570                         60,000                      104,570                                                                 104,570                     104,570
  Tewantin - Cooroy Noosa Rd - Pathway renewal                                           237,748                                                     237,748                                                                 237,748                     237,748
  Tewantin - McKinnon Dr - Pathway renewal                                               177,789                                                     177,789                                                                 177,789                     177,789
  Noosa Hinterland Trail 7 Upgrade                                                       187,216                                                     187,216                                                                 187,216                     187,216
  New, Expansion & Upgrade
  Cooroy - Pathway Hinterland and Local Links - Kauri St                                 125,203                                                     125,203                                                                             125,203         125,203
  Pomona - Pathway Hinterland and Local Links - Factory St                                55,000                                      (55,000)             0                                                                                                 -
  Peregian Beach Coastal Pathway Upgrade and Cycle Street - Stage 1                      100,000                                                     100,000       100,000                                                                               100,000
  Pomona - Summit Road - Hinterland and local links Pathway                              198,000                                                     198,000       198,000                                                                               198,000
  Shire Information Signage Audit and Design                                              66,747                                                      66,747                                                                              66,747          66,747
  Tewantin - Griffith Avenue - Hinterland and Local Links Pathway                         45,714                                                      45,714                                                                              45,714          45,714
Pathways & Boardwalks Total                                                            2,383,803              -          60,000       (55,000)     2,388,803       298,000            -            -          -            1,853,139     237,664       2,388,803

Public Amenities
  New, Expansion & Upgrade
  Boreen Point - Mains Water replacement                                                  45,000                                                      45,000                                                                              45,000          45,000
  Noosa Heads Lions Park Upgrade Public Amenities                                        361,369                                                     361,369                                                                             361,369         361,369
  Noosaville - Gympie terrace - Changing Places Facility                                 180,735                                                     180,735       180,735                                                                               180,735
  Pomona & Boreen Point SES Bathroom Amenities                                           135,357                                                     135,357        82,417                                                                52,940         135,357
  Noosa Heads - Visitor Information Centre - Roof renewal and amenities upgrade                                         220,110                      220,110                                                                 154,077      66,033         220,110
Public Amenities Total                                                                   722,461              -         220,110               -      942,571       263,152            -            -          -             154,077      525,342         942,571

Public Transport Infrastructure
  New, Expansion & Upgrade
  Cooroy Centre - Transit Hub Investigations                                              94,445                                                      94,445        75,000                                                                19,445          94,445
  Noosa Civic - Transit Hub Investigations                                                96,407                                                      96,407        75,000                                                                21,407          96,407
  Shire Wide - Bus Stop Upgrades                                                         520,720                                                     520,720       257,720                                                   157,800     105,200         520,720
Public Transport Infrastructure Total                                                   711,572           -                -              -          711,572       407,720            -            -          -             157,800      146,052         711,572

Sealed Roads Network
  Renewal
  Shire Kerb & Channel Renewal Program                                                   205,000                                                     205,000                                                                 205,000                     205,000
  Shire Reseal Program                                                                 5,166,020                                                    5,166,020     1,913,000                                                3,253,020                   5,166,020
  Shire Wide - Heavy Patching                                                          1,537,500                                                    1,537,500                                                              1,537,500                   1,537,500
  Sunrise Beach - 56 David Low Way - Retaining Wall Construction                       1,055,068                        457,354                     1,512,422      455,889                                                 1,056,533                   1,512,422
  Shire Wide - Roundabout Signage                                                        298,207                                                     298,207                                                                 298,207                     298,207
  New, Expansion & Upgrade
  Federal Middle Creek Road Resconstruction                                               20,000                                                      20,000                                                                              20,000          20,000
Sealed Roads Network Total                                                             8,281,795          -            457,354            -        8,739,149     2,368,889            -            -          -            6,350,260      20,000       8,739,149




                                                                                                                                                                                                                                                   Page 69 of 93

Page 70

                                                                                                                                                                                                                                                 Attachment 2
                                                                                                                                                                                    RENEWAL, NEW, EXPANSIONS & UPGRADE CAPITAL PROJECTS
                                                                                                                                                                                                                 2024/25 Capital Program - Budget Review 2
                                                                                                                                                                                                                    Depreciation     General
                                                                          Current Budget  Multi Year  Emergent Works &    Savings &                                                        Levy        Other
  Program                                                                                                                                 Total           Grants        Loans                                       funded Cash        Cash            Total
                                                                              (BR1)      Rescheduling    Variations       Transfers                                                    Reserves     Reserves
                                                                                                                                                                                                                        Reserve      Reserve

Sports Grounds and Facilities
  Renewal
  Cooroy Sports Complex - Sporting Field Lighting                                500,000                        150,000                      650,000         650,000                                                                                   650,000
  New, Expansion & Upgrade
  Cooroy - Sports Complex - Design and Reconfig. Carpark and entrance              3,100                                                          3,100                                                                                  3,100           3,100
  Cooroy Sports Complex - Gymnastics Upgrade & Multi-purpose area              1,624,500     (1,000,000)                                     624,500         624,500                                                                                   624,500
  Noosa Liesure Centre - Outdoor Court Upgrade                                    53,829                                                      53,829          43,063                                                         2,153       8,613          53,829
  Sunshine Beach - Noosa Rugby Union Club - Redevelopment                         65,000                                                      65,000                                                                        32,500      32,500          65,000
Sports Grounds and Facilities Total                                            2,246,429     (1,000,000)        150,000               -    1,396,429       1,317,563            -             -            -               34,653       44,213       1,396,429

Stormwater Drainage
  Renewal
  Shire Bio-Retention Basin Renewals Program                                     151,300                                                     151,300                                                                       151,300                     151,300
  Shire Pipe Relining / Rehabilitation Renewal Program                           425,300                                                     425,300                                                                       425,300                     425,300
  Shire Pit Structure Renewal Program                                            117,900                                                     117,900                                                                       117,900                     117,900
  Sunshine Beach - Ross Crescent - Slope Stabilisation Construction              518,797      (400,000)                                      118,797          59,399                                                        59,399                     118,798
  New, Expansion & Upgrade
  Noosaville - 74 Goodchap St - Stormwater Drainage                              304,100                         76,000                      380,100                                                                       190,050     190,050         380,100
  Noosa Heads - Cooyar Street - Stormwater Bio-basin Upgrade                     284,160                                                     284,160         284,160                                                                                   284,160
  Sunshine Beach Ross Cresc Slope Stabilisation Design                           182,117                                                     182,117                                                                                   182,117         182,117
Stormwater Drainage Total                                                      1,983,674      (400,000)          76,000               -    1,659,674         343,559            -             -            -              943,949      372,167       1,659,675

Strategic Planning
  Renewal
  Coastal, Central Precincts - Local Centre Planning - Carpark Analysis           57,430                                                      57,430                                                                        57,430                      57,430
  New, Expansion & Upgrade
  Boreen Point - Campground - Development Master Plan                            47,200                                                       47,200                                                    47,200                                          47,200
  Cooroy - Lake Macdonald Drive - Residential Subdivision                      3,300,000                                                    3,300,000       3,300,000                                                                                3,300,000
  Noosa Junction - Masterplan Update                                            480,554       (300,000)                                      180,554                                      180,554                                                      180,554
  Noosa Junction Streetscape                                                     51,152         (51,152)                                             0                                                                                                     -
  Noosaville Foreshore Masterplan including Thomas Street                       138,071                         195,706                      333,777                                                                                   333,777         333,777
  Shire Wide - Place Program                                                    158,302                                                      158,302                                                                                   158,302         158,302
  Sunshine Beach - NAC - Needs Assessment and Master Plan                        68,548                                                       68,548                                                                                    68,548          68,548
  Doonan - Eumundi Landfill - Masterplan & Feasibility Study                    500,000                                                      500,000                                                   500,000                                         500,000
Strategic Planning Total                                                       4,801,257      (351,152)         195,706               -    4,645,811       3,300,000            -         180,554      547,200             57,430      560,627       4,645,811

Streetscapes and Road Corridors
  Renewal
  Noosa Parade Upgrade Stage 2 - Design                                          88,236                          62,000                      150,236                                                                       123,765      26,471         150,236
Streetscapes and Road Corridors Total                                            88,236             -           62,000           -           150,236               -            -             -            -              123,765       26,471         150,236




                                                                                                                                                                                                                                                 Page 70 of 93

Page 71

                                                                                                                                                                                                                                                            Attachment 2
                                                                                                                                                                                            RENEWAL, NEW, EXPANSIONS & UPGRADE CAPITAL PROJECTS
                                                                                                                                                                                                                           2024/25 Capital Program - Budget Review 2
                                                                                                                                                                                                                              Depreciation     General
                                                                                  Current Budget  Multi Year  Emergent Works &     Savings &                                                        Levy        Other
  Program                                                                                                                                           Total         Grants        Loans                                         funded Cash        Cash             Total
                                                                                      (BR1)      Rescheduling    Variations        Transfers                                                    Reserves     Reserves
                                                                                                                                                                                                                                  Reserve      Reserve

Transport and Infrastructure Management
  Renewal
  Noosa Heads Noosa Woods Jetty Upgrade Investigations                                    91,445                                                         91,445                                                                       91,445                       91,445
  Shire Forward Planning & Design Program Construction Ready Designs                     468,000                       (62,000)                         406,000                                                                      406,000                      406,000
  New, Expansion & Upgrade
  Noosa Heads, Noosa Drive Halse Lane to Sunshine Beach Rd                               305,307                                                        305,307                                                                                  305,307          305,307
  Pomona - Flood Warning Infrastructure                                                  235,000                                                        235,000      235,000                                                                                      235,000
Transport and Infrastructure Management Total                                           1,099,752               -      (62,000)                 -     1,037,752      235,000            -             -             -               497,445      305,307        1,037,752

Waste Management
  Renewal
  Transfer station office renewals                                                       180,000                                                        180,000                                                 180,000                                           180,000
  New, Expansion & Upgrade
  Doonan - Waste Recovery & Landfill - WHS & Environmental Compliance                    895,302                                                        895,302                                                 895,302                                           895,302
  Doonan - Landfill - Cell 2.1 Eastern batter capping                                  1,165,028                                                      1,165,028                                                1,165,028                                        1,165,028
  Doonan - Landfill - North Batter Capping                                             1,190,617      (750,000)                                         440,617                                                 440,617                                           440,617
  Doonan - Landfill - North Batter Solar                                                 226,496                                                        226,496                                                 226,496                                           226,496
  Doonan - Noosaville/Eumundi Road Landfill Expansion of Resource Recovery Area        1,289,184                                                      1,289,184                                                1,289,184                                        1,289,184
  Doonan - Noosaville/Eumundi Road Landfill - HES Basin                                5,000,000     (5,000,000)                                              0                                                                                                       -
  Container Return point                                                                 200,000                                                        200,000                                                 200,000                                           200,000
Waste Management Total                                                                 10,146,627    (5,750,000)               -                -     4,396,627            -            -             -       4,396,627                 -            -          4,396,627

Zero Emissions Program
  New, Expansion & Upgrade
  Emissions Reduction Program Implementation                                             400,000                                                        400,000                                                                                  400,000          400,000
  Community Batteries for Household Solar                                                343,068                                                        343,068      343,068                                                                                      343,068
Zero Emissions Program Total                                                             743,068            -              -                -          743,068       343,068            -             -             -                   -        400,000          743,068

Grand Total                                                                           132,593,941    (8,501,152)      2,447,493      (1,622,500)    124,917,782    90,465,390               0      730,074     7,691,179          18,859,328    7,171,812      124,917,783




                                                                                                                                                                                                                                                            Page 71 of 93

Page 72

Attachment 3 - Statement of Income and Expenditure (BR2)

Noosa Council
Statement of Income and Expenditure
For the Year Ended 30 June 2025
                                                   Current BR1      Proposed     Revised BR2
                                                        Budget    Adjustments         Budget
                                                        ($'000)        ($'000)        ($'000)

Revenue
  Recurrent Revenue
  Rates, Levies & Annual Charges                        94,398            (90)         94,308
  Fees & Charges                                        10,936              50         10,986
  Interest received                                      3,150            561           3,711
  Sale of Goods and major services                      15,632            312          15,944
  Sale of contract and recoverable works                     -               -              -
  Rental & lease income                                  2,273            (39)          2,234
  Other recurrent income                                 1,001             (5)            996
  Grants, subsidies, contributions and donations         6,653            519           7,173
  Unitywater Distributions                               5,950                          5,950
                                                       139,993          1,309         141,302
Expenses
  Recurrent Expenses
  Employee benefits                                     52,577            560          53,138
  Materials & services                                  62,343            470          62,813
  Finance costs                                          3,032              -           3,032
  Depreciation                                          21,936              -          21,936
  Other expenses                                           245              -             245
                                                       140,133          1,030         141,164

Operating Result                                          (140)           278            138


Summary of Capital Revenue and Expenditure
Capital Revenue
  Capital contributions and donations                    1,200               -         1,200
  Contributed Assets                                     1,500               -         1,500
  Grants, subsidies, contributions and donations        92,983         (2,519)        90,464
  Cash / revenue                                        33,411           (158)        33,253
  New loan borrowings                                    5,000         (5,000)             -
  Other capital revenue                                      -               -             -
Total Capital Revenue                                  134,094         (7,677)       126,417

Capital Expenditure
  Contributed assets                                     1,500               -         1,500
  Capital works - constructed assets                   119,906         (7,755)       112,151
  Capital works - other capital                         11,447              78        11,525
  Loan redemption                                        1,241               -         1,241
  Other capital expenses                                     -               -             -
Total Capital Expenditure                              134,094         (7,677)       126,417




                                                                                       Page 72 of 93

Page 73

2024-25
Budget Review 2
  Financial Statements




        noosa.qld.gov.au
                     Page 73 of 93

:                                                                                                                                     a
                                                                                                                                                  :                                         or
                      +                                                                                                                                           %   7                 eos
                                                                                                                                         :                     ;                            0
                                                                                                                                                                      4       :             ©
                               ie                                                                                                                '         La                               oD
       eto —                                                                                                                                                                         *
iS). eee air 7p ]     Ba                                                                                                                                                               a
bs Sap tet  fe 4 side ARR                                                                                                                                                             faa   wai
Z               wives.             :            a                                                                                                                                 ad   EN    ait
  a        w bi     oO    aig      oes      Sith 2    .                                                                                                                     cae & ‘ig        ees
          @) '@)                      ee os        Nes ANC ROU                     2                                                                                      a my
                                   Ei              es    a                                                                                                                      a>      a    eS
                                                    ae                                                                                                                         Ee
                                      r   :          Fa, A gre 7"                   ee                                                                               mis: ai  oe “a          :
           za     O                     bas  mn ie    aS: re        RA a ean: u                                                                          =                “a :       ee aoe    A
                                     a               nee Foo Neer                                                                                                        7         .
                                              o” a Airman  mee ihe nr hl f ee ae eg       Rs                                                            ‘                   SRE Sate Sas =
                 dg                                                                                              eet Che               on             elec,
                                                   oa oan © aN Pa ef nk Se vey    lie   eg                                                              Weg                           aie ae
               +                                                                                                  P  Ljes im Rese om   a, eee      =        —_     * Ie        x            Bes = 35
           oD .Y                                                                                                      lc                                    on.          i ~ =        ae       ,
                                                                   ,                     e  PP    a                                             :                    E              ‘      =   4
                                                                                                a 4      bt <     @ See & 35       se s   ' Fe    2      par. 8 Gat” ea .                      a
                                 ;                                                                                  Sj Ae        tae bas     Bese nS SSR ee.        eS       eae   ~~         “i
ee The                          ‘    J Ps ba        ;                                                                                        ;          ee     ae =       &       “a
                                     vit                                                                                                                  ee         ey, a a)
      ey    Sg,         Re ie. ae                  ’                                                                                                                        as. Te
                                                                                                                  p ss         Mee sat                          wR SS
  es        aspen  pee gan    Ee te                                                                                                                                            Cae oa.
PH. 4       e Ee tgs Oe, Fes       FE    iy ge         5	1	1	1	36	12	3224	1687	21	36	60	Py
4	1	1	1	37	0	6	1303	3359	506	-1	
5	1	1	1	37	1	6	1303	40	13	45	a
5	1	1	1	37	2	138	1329	24	21	0	-
5	1	1	1	37	3	180	1316	108	71	14	os
5	1	1	1	37	4	308	1341	51	38	14	2
5	1	1	1	37	5	364	1352	160	72	26	Fuga
5	1	1	1	37	6	593	1376	131	67	0	Gioia
5	1	1	1	37	7	802	1403	104	36	36	eo
5	1	1	1	37	8	970	1455	2	2	0	:
5	1	1	1	37	9	1043	1452	11	16	0 & y ile a aha PES aa ek Oral aw < ee. = ae Bs aay
            SER       ey pee      : Ce     be      a                                                                                                                               #.
    ay  :         A ARE      a  Ap ight: ‘noe gt       ma    »   .                                                                                                             .
  4g dal Pee H   Figg! Vg Pt         eg        .                                                                                                             .
“She es           ih    ae    1 es   pees: is                 A          '                                                                                                         E
i         BA byte, bp gee                ICS Ae des.     \ oo ST ,
  ee Fe page psf Le                                OO                 a                                                                            :                         =
                                                               as                                        ‘ae                                                                 i ci  es
  ee        ee        ign Ey          ee   Ge  U5 nea         i        4g          al                                                 Pik ee                           ie    aN      “
Fe Pes   Fo iM          BIE GPO.   aye      fae   7 1 hd ak    ae, Me  ‘a           .   eee                                         Bae Ome ans         ?                  i
       ie  he  Bee      og     te Pon 7 Se Pe  od   ipa    ‘ante ‘ol: eae ' ‘Se         »           :         ,                  x  VP oP et Ai     A                      ee,  ses
 Pipi Se ae   ee     Cf   et Zz     CP Te    ih a Dageg aha I Jee Pd /                             te ae     ao       ‘      on ioe ries     “eg       (3.             si
see:           re hey BEET, f BE ta eae? OT eh art                               |          shi                       ae Rees                         ee                      :
Oe Ce eA                       eR Came es i yet ap            Ke. se     ok,     te   .~                         .¥        er                      og He     ney         ‘       ,     oi
ere Ee        b      f    .   se    yh   ae e            Nes oO aig gp PED ep 5	1	1	1	49	17	1490	1891	2	4	0	»
5	1	1	1	49	18	1651	1908	2	3	24	’
5	1	1	1	49	19	1800	1934	6	3	35	R
5	1	1	1	49	20	2170	1974	35	11	44	a
5	1	1	1	49	21	2260	1989	17	5	35	bt
5	1	1	1	49	22	2310	1989	29	16	24	«hes
5	1	1	1	49	23	2595	2028	7	5	78	+
5	1	1	1	49	24	2738	2036	21	30	24	See
5	1	1	1	49	25	2805	2054	39	19	38	ae
5	1	1	1	49	26	3053	2102	6	5	12	*
5	1	1	1	49	27	3314	2133	3	5	0	‘
5	1	1	1	49	28	3396	2136	3	4	0	.
4	1	1	1	50	0	0	1692	3313	467	-1	
5	1	1	1	50	1	0	1692	31	16	23	i
5	1	1	1	50	2	46	1701	53	22	36	ig
5	1	1	1	50	3	152	1718	31	24	30	wa
5	1	1	1	50	4	240	1706	24	40	57	ht
5	1	1	1	50	5	285	1723	80	40	48	AGE
5	1	1	1	50	6	353	1719	40	48	36	A
5	1	1	1	50	7	424	1754	168	40	24	ae)
5	1	1	1	50	8	648	1781	27	27	0	S
5	1	1	1	50	9	686	1760	190	81	16	ne
5	1	1	1	50	10	891	1804	69	41	28	oe
5	1	1	1	50	11	1002	1824	70	37	21	Pi
5	1	1	1	50	12	1118	1830	49	51	15	seo
5	1	1	1	50	13	1196	1841	129	57	11	es
5	1	1	1	50	14	1334	1856	63	51	30	ae
5	1	1	1	50	15	1423	1894	40	9	44	ee
5	1	1	1	50	16	1596	1904	53	30	14	1
5	1	1	1	50	17	1738	1902	74	58	39	we
5	1	1	1	50	18	1940	1966	17	9	0	¥
5	1	1	1	50	19	2101	1981	75	32	0	Yt
5	1	1	1	50	20	2247	1999	58	29	37	wee
5	1	1	1	50	21	2494	2034	29	20	21	ns
5	1	1	1	50	22	2577	2051	46	17	23	oe
5	1	1	1	50	23	2801	2059	51	40	29	ee
5	1	1	1	50	24	2880	2086	93	30	33	ce,
5	1	1	1	50	25	3056	2111	16	8	77	=
5	1	1	1	50	26	3298	2148	15	11	29	ie
4	1	1	1	51	0	9	1700	3299	467	-1	
5	1	1	1	51	1	9	1700	56	47	26	a4
5	1	1	1	51	2	82	1721	7	41	0	*
5	1	1	1	51	3	86	1734	105	24	47	itt
5	1	1	1	51	4	214	1731	121	71	18	eee
5	1	1	1	51	5	376	1762	70	38	24	aan,
5	1	1	1	51	6	470	1798	2	2	30	by
5	1	1	1	51	7	507	1782	41	22	13	Uh
5	1	1	1	51	8	633	1806	46	41	20	pA
5	1	1	1	51	9	691	1801	55	41	0	Piake
5	1	1	1	51	10	775	1812	23	45	34	Be:
5	1	1	1	51	11	801	1817	23	36	56	pe
5	1	1	1	51	12	858	1836	37	21	31	Te
5	1	1	1	51	13	923	1836	96	47	22	pee
5	1	1	1	51	14	1035	1836	71	56	19	Lk
5	1	1	1	51	15	1134	1878	15	18	20	Ge
5	1	1	1	51	16	1161	1877	62	22	32	Phat:
5	1	1	1	51	17	1235	1889	42	30	31	wy
5	1	1	1	51	18	1319	1891	92	41	20	ees
5	1	1	1	51	19	1471	1913	14	21	50	a
5	1	1	1	51	20	1578	1934	27	23	10	1
5	1	1	1	51	21	1716	1954	75	48	30	im
5	1	1	1	51	22	1812	1948	42	82	2	it
5	1	1	1	51	23	1887	1971	38	31	10	eo
5	1	1	1	51	24	1975	1995	13	15	9	a
5	1	1	1	51	25	2087	1988	122	61	10	oe}
5	1	1	1	51	26	2236	2023	21	29	46	ie
5	1	1	1	51	27	2334	2046	4	2	19	mt
5	1	1	1	51	28	2377	2043	17	13	31	te
5	1	1	1	51	29	2468	2038	158	72	8	c/s,
5	1	1	1	51	30	2647	2073	28	19	33	iy
5	1	1	1	51	31	2811	2095	51	35	9	AO
5	1	1	1	51	32	2950	2126	24	15	35	ae
5	1	1	1	51	33	3052	2135	4	4	0	%
5	1	1	1	51	34	3129	2147	4	10	2	‘
5	1	1	1	51	35	3305	2165	53	28	43	“a
4	1	1	1	52	0	0	1746	3380	464	-1	
5	1	1	1	52	1	0	1749	12	18	0	’
5	1	1	1	52	2	28	1746	159	57	0	<etr
5	1	1	1	52	3	258	1778	8	26	24	by
5	1	1	1	52	4	283	1781	66	32	52	FE
5	1	1	1	52	5	380	1797	27	26	5	ee
5	1	1	1	52	6	488	1813	10	18	31	ELAS
5	1	1	1	52	7	544	1819	27	27	42	te
5	1	1	1	52	8	614	1826	59	27	5	dpe
PE Sea eB       Sh     oe   oy   ae  fe GF ie Ee EF teh    wf Gy Rik: ho a               Na  eae eo  a 2% noah    $2. URS     a      PNAS TT Pt .           * ieee    are              ;
ak ae       eo sate       Oe)    bs (Oe wel BE      ae     Ae op       ne     e       TG Nigh        <  Pee cris                ee  adh ee eee as               I, Rey
                                       Ns       i) Oa Oa. ee 5 A near | fy %                  Fe ee a   SE?     ake      Co Sea        Sadie Biers a        ale   es      ‘          Fb,
 yee, RZ Paea      te Oi PY  ie aed ge ae  sf    Pe  ag:   Vee pe es   Yap rok a      :   a       \     RS  Ne,  owe Petite. 2a SSO) y MET    rae igs,     :    Sik eae be      ,
bf            a Cae Ca       ae te E:    Pee eg Be i ee;           ie ah   5 .       sete “ek, a         Dyce:  ON oe alge 5) ea        is ts ne Rie.    ae     ,  rete       SS     .
SE                    PP ep era |                                                   res              re     et eae 2               ide                           Se
  og vig, Be Cute   a ES ae Ho ge        en  Ee hel hap h, eRe           oe               ss   ie ter         aa       Sy    Nero See She             a ae        “ae Pee
;    eg : Op Penk? 9 ye         z  be yee eee ay baat     g       ea    Vee     et abba ie es       a A) Bogs =    ae SS Rh        de ca  Pa     SY Ek on tht       ee ye
By 2 oo  iS L Si       a EL OTE I      v; Ce eee    fe    ME ys ie    ge  nae                ne     THE             Be  an, OE ca ae      Boe See         ae ae        ‘Se       c
S54    a ee          ae,      in 4  Cine Bee     ego Thee?    Wg be re he,          gic      San 5       ce   ee    hes S.         Pe  Ser    Fe a         '   By      “Se Tee
 ag     Pie?   5 OE tO          + igs as 2g,  :    SF a,    NT  Lae pias  oe c        Pt)      in’ Ek ange 5 Me ae   Se         Oe.     ah Ne   Wate oes        X      Pe
Bier. oid Be  ne, Be ae   Ba      vig, Bi aye:      A i) IM    Fide gee  We          gS ROS ie           Bh so ese 2 aS ee ae  a ees        Rata Fa WH en Nos   SS a   .S   r
$4 tea    On  Sy Ain rk        eT pe 4                  ge  te         <"         5, Hae     a ee ha Tay         Oana   SEY      ae                 eet.       Ae
ee    ye Ss ptt:     oo . Pegi tw ae      oo Pal        adek          big hme    eo         Gone                  * aa             se      Excel yee.
 :     PA    gre        NS. i Ss Phe phe  Mould’ AES   aie bata SN ip Sim,  zene ee 5  a ee        ewes Ss pe en       Reo       Cee       pUeLy tat  38s
 GE    EON    Z| ee ERS       ae Pg        eh    Sie OF      lieing)   Poa tae ges       Bue      ae.  3 one ae So an SOP        Roca     ee
£m   eo   gi        Seg aa oO        a pee oy ee a Pag         gh  ee t¢ z              oS A     ee   Pe   ai  er  § Paes RPT ee cg
ee Ee ese. ag ith    Le my   ae Mee, bs ff bi tage            A   ap!      *   etn 8       ot pei es a 3 aie      Bk Cans   oa
gig G:F ee rer. SM or en f Pes mh Fp SY es     a Didge   ae f  ba    i:     J      able ok 4  ex ih sera Se TO  ieee
 y    orn    oh f  ie eS, iy    ee TG     VP ae i      ag              ae     et pa i sa
lupe    ee ee     get ames ML STR ee DBS Hs       gn Be gs    © ow ae atom Kp      A ee
 Mose  et          te  ge      Pi    le tat ge eed            ye we
 Pw (igs      Swe          oe 7 Wea Rene oa    oe    i
Lb Pe he   # ae.         pees Bs, Lo    Ary   fl er
ae        ae
y  oF     Loe)
 a  Y     a ow

The text continues on page 74.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.