RENEWAL, NEW, EXPANSIONS & UPGRADE CAPITAL PROJECTS
2024/25 Capital Program - Budget Review 2
Depreciation General
Current Budget Multi Year Emergent Works & Savings & Levy Other
Program Total Grants Loans funded Cash Cash Total
(BR1) Rescheduling Variations Transfers Reserves Reserves
Reserve Reserve
Sports Grounds and Facilities
Renewal
Cooroy Sports Complex - Sporting Field Lighting 500,000 150,000 650,000 650,000 650,000
New, Expansion & Upgrade
Cooroy - Sports Complex - Design and Reconfig. Carpark and entrance 3,100 3,100 3,100 3,100
Cooroy Sports Complex - Gymnastics Upgrade & Multi-purpose area 1,624,500 (1,000,000) 624,500 624,500 624,500
Noosa Liesure Centre - Outdoor Court Upgrade 53,829 53,829 43,063 2,153 8,613 53,829
Sunshine Beach - Noosa Rugby Union Club - Redevelopment 65,000 65,000 32,500 32,500 65,000
Sports Grounds and Facilities Total 2,246,429 (1,000,000) 150,000 - 1,396,429 1,317,563 - - - 34,653 44,213 1,396,429
Stormwater Drainage
Renewal
Shire Bio-Retention Basin Renewals Program 151,300 151,300 151,300 151,300
Shire Pipe Relining / Rehabilitation Renewal Program 425,300 425,300 425,300 425,300
Shire Pit Structure Renewal Program 117,900 117,900 117,900 117,900
Sunshine Beach - Ross Crescent - Slope Stabilisation Construction 518,797 (400,000) 118,797 59,399 59,399 118,798
New, Expansion & Upgrade
Noosaville - 74 Goodchap St - Stormwater Drainage 304,100 76,000 380,100 190,050 190,050 380,100
Noosa Heads - Cooyar Street - Stormwater Bio-basin Upgrade 284,160 284,160 284,160 284,160
Sunshine Beach Ross Cresc Slope Stabilisation Design 182,117 182,117 182,117 182,117
Stormwater Drainage Total 1,983,674 (400,000) 76,000 - 1,659,674 343,559 - - - 943,949 372,167 1,659,675
Strategic Planning
Renewal
Coastal, Central Precincts - Local Centre Planning - Carpark Analysis 57,430 57,430 57,430 57,430
New, Expansion & Upgrade
Boreen Point - Campground - Development Master Plan 47,200 47,200 47,200 47,200
Cooroy - Lake Macdonald Drive - Residential Subdivision 3,300,000 3,300,000 3,300,000 3,300,000
Noosa Junction - Masterplan Update 480,554 (300,000) 180,554 180,554 180,554
Noosa Junction Streetscape 51,152 (51,152) 0 -
Noosaville Foreshore Masterplan including Thomas Street 138,071 195,706 333,777 333,777 333,777
Shire Wide - Place Program 158,302 158,302 158,302 158,302
Sunshine Beach - NAC - Needs Assessment and Master Plan 68,548 68,548 68,548 68,548
Doonan - Eumundi Landfill - Masterplan & Feasibility Study 500,000 500,000 500,000 500,000
Strategic Planning Total 4,801,257 (351,152) 195,706 - 4,645,811 3,300,000 - 180,554 547,200 57,430 560,627 4,645,811
Streetscapes and Road Corridors
Renewal
Noosa Parade Upgrade Stage 2 - Design 88,236 62,000 150,236 123,765 26,471 150,236
Streetscapes and Road Corridors Total 88,236 - 62,000 - 150,236 - - - - 123,765 26,471 150,236
Page 70 of 93
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.