GEOTECHNICAL INVESTIGATION
Proposed Unit Development
Lots 5 to 8 Settlers Cove
Serenity Close, Noosa
Submitted to:
CBD Settlers Cove Pty Ltd
PO Box 1923
NOOSA HEADS QLD 4567
Attn: Mr Gary Godfrey
REPORT
Report Number: 087682058 002 Rev.1
Distribution:
2 Copies - CBD Settlers Cove Pty Ltd
(1 Bound & 1 PDF)
2 Copies - Tate Professional Engineers Pty Ltd
(1 Bound & 1 PDF)
1 Copy - Golder Associates
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 37 pages
Page 2
LOTS 5 TO 8, SETTLERS COVE, SERENITY CLOSE, NOOSA
Table of Contents
1.0 INTRODUCTION ........................................................................................................................................................ 1
2.0 SITE DESCRIPTION .................................................................................................................................................. 1
3.0 METHOD OF INVESTIGATION ................................................................................................................................. 1
4.0 SUBSURFACE CONDITIONS ................................................................................................................................... 1
5.0 COMMENTS AND RECOMMENDATIONS................................................................................................................ 2
5.1 Slope Stability ............................................................................................................................................... 2
5.2 Earthworks .................................................................................................................................................... 3
5.2.1 Excavation............................................................................................................................................... 3
5.2.2 Filling ....................................................................................................................................................... 4
5.3 Footings ........................................................................................................................................................ 4
5.4 Retaining Structure Design ........................................................................................................................... 5
5.5 Pavements .................................................................................................................................................... 6
5.6 Drainage ....................................................................................................................................................... 6
6.0 IMPORTANT INFORMATION .................................................................................................................................... 6
TABLES
Table 2: Stability Risk Levels............................................................................................................................................... 3
Table 3: Retaining Structure Design Parameters ................................................................................................................ 5
Table 4: Presumptive CBR Values ...................................................................................................................................... 6
FIGURES
Figure 1 – Site Plan
Figure 2 – Typical Section Through Sand Dune Face
APPENDICES
APPENDIX A
Reports of Boreholes
Explanation Notes, Abbreviations & Terms Used on Borehole and Test Pit Reports
Method of Soil Description Used on Borehole and Test Pit Reports
APPENDIX B
Limitations
December 2008
Report No. 087682058 002 Rev.1 i
Page 3
LOTS 5 TO 8, SETTLERS COVE, SERENITY CLOSE, NOOSA
1.0 INTRODUCTION
This report details the results of a geotechnical investigation carried out for a proposed unit development at
Lots 5 to 8, Settlers Cove, Serenity Close, Noosa Heads. The investigation was undertaken at the request of
Tate Professional Engineers Pty Ltd (Tate), the consulting engineers for the project, on behalf of the client
CBD Settlers Cove Pty Ltd.
Information supplied to us by Tate indicates that the proposed development comprises two and four level
structures of masonry construction, a pool and associated infrastructure. The four storey buildings will be
over single level, slab on ground basements. We are advised that stormwater disposal for the site will be via
Rapid Infiltration Pits (RIPs) which discharge through a permeable base no less than 2 m below the ground
surface.
This report summarises the results of the investigation and includes an assessment of slope stability
together with geotechnical recommendations regarding the design of earthworks, footings, retaining
structures and pavements.
2.0 SITE DESCRIPTION
Site is located at the western end of Serenity Close, Noosa Heads.
At the time of the investigation (Ref. Photograph 1 below), the proposed development area was covered by
grass and mulch with stands of vegetation. The ground surface sloped towards the south and south west at
angles of between about 5o to 8o. The ground slope increases (up to about 35º) in the southern and western
parts of the site within densely vegetated land down to Noosa Inlet.
The site layout, together with ground surface contours and photographs illustrating the site conditions at the
time of the investigation are shown on Figure No. 1.
3.0 METHOD OF INVESTIGATION
The investigation comprised a terrain assessment by a senior geotechnical engineer together with a
subsurface investigation by geotechnical personnel carried out between 29 to 31 October 2008. The
subsurface investigation comprised twenty boreholes (designated BH1 to BH20) drilled using a 4WD
mounted solid flight auger rig to depths of 6 m.
In-situ soil density was assessed by conducting dynamic cone penetrometer (DCP) tests from the ground
surface adjacent to each borehole and at various depths within the boreholes following augering (in order to
minimise the effect of rod friction on the test results).
Borehole locations are shown in Figure No. 1, Site Plan. Results of the fieldwork are presented in the
Reports of Boreholes in Appendix A, along with explanatory notes.
4.0 SUBSURFACE CONDITIONS
Available geological information1 indicates that the site is underlain by Quaternary (Pleistocene) age quartz
dune sand.
The subsurface conditions encountered in the boreholes generally comprised very loose to loose sand to
depths of between 0.4 m to 2.3 m, then dense sand to between about 2.7 m and 4.1 m depth, underlain by
medium dense to dense sand to the depth of investigation (ie. about 6 m).
1
1:100,000 Geological Map, GYMPIE SPECIAL, Sheet 9445 & Part 9545, DME, 1999
December 2008
Report No. 087682058 002 Rev.1 1
Page 4
LOTS 5 TO 8, SETTLERS COVE, SERENITY CLOSE, NOOSA Some fill comprising sandy gravel was encountered in borehole BH1 to 0.4 m below ground level (BGL). Silty sand was encountered in boreholes BH2, BH3 and BH14 to depths of between 0.4 m and 0.5 m BGL. Sandy gravel was encountered in borehole BH3 from the ground surface to 0.2 m BGL. Groundwater was not encountered in any of the boreholes at the time of the investigation. These results are similar to those from previous investigations on Lots 2 and 3, nearby (ref. Golder Reports 06682026(AA) and 97680045(B)). 5.0 COMMENTS AND RECOMMENDATIONS 5.1 Slope Stability The steep dune face in the northern part of the site is described as a ‘Sand Dune Problem Area’ in Noosa Council’s Planning Scheme. Details on the stability of the site have been provided in earlier geotechnical reports by Golder Associates for the ‘Settlers Cove’ development (Ref. 91680133). These previous reports indicate that the steep dune face is marginally stable. The existing steep slope of the dune face (up to about 35º) appears to be maintained at more than the normal angle of repose for loose sand (about 27º) by the mechanical binding action of the roots associated with the dense cover of vegetation. The edge of the development area, near the crest of the steep slope, corresponds to the Zone 1/Zone 2 boundary as defined in previous reports. Zone 1 includes all the steep dune face, plus a margin on the uphill side of the crest to allow for the unlikely event that three subsequent and effectively cumulative translational slide failures develop down the dune face. The remaining near level areas are Zone 2. In accordance with previous practice in the area, it is recommended that all structures are founded below a plane rising at 27º from the toe of the steep dune face (Ref. Figure No. 2). For this proposed development, the position and levels are such that relatively shallow foundations will be suitable. Provided the dune face is managed as detailed in earlier reports (eg. retain existing vegetation), it is our opinion that there is a Very Low to Low Risk of slope instability affecting the proposed development and that the development should not detrimentally affect the stability of the dune face. Subsurface disposal of stormwater via RIPs with outlets at least 2 m below the ground surface must not occur within 5 m of the crest of the dune face (ref. Figure No. 1). The risk assessment for this project has been carried out following the Australian Geomechanics Society (AGS) Guidelines for Landslide Risk Management (March 2007). Relative levels of risk and their implications are given in Table 1 below. December 2008 Report No. 087682058 002 Rev.1 2
Page 5
LOTS 5 TO 8, SETTLERS COVE, SERENITY CLOSE, NOOSA
Table 1: Stability Risk Levels
Risk Level Example Implications(1)
VH VERY HIGH RISK Unacceptable without treatment. Extensive detailed
investigation and research, planning and implementation
of treatment options essential to reduce risk to Low; may
be too expensive and not practical. Work likely to cost
more than value of property.
H HIGH RISK Unacceptable without treatment. Detailed investigation,
planning and implementation of treatment options required
to reduce risk to Low. Work would cost a substantial sum
in relation to the value of the property.
M MODERATE RISK May be tolerated in certain circumstances (subject to
regulators’ approval) but requires investigation, planning
and implementation of treatment options to reduce risk to
Low. Treatment options to reduce to Low risk should be
implemented as soon as practicable.
L LOW RISK Usually acceptable to regulators. Where treatment has
been required to reduce the risk to this level, ongoing
maintenance required.
VL VERY LOW RISK Acceptable. Manage by normal slope maintenance
procedures.
Note: (1) The implications for a particular situation are to be determined by all parties to the risk assessment and may
depend on the nature of the property at risk; these are only given as a general guide.
5.2 Earthworks
5.2.1 Excavation
We understand that the proposed earthworks for the development comprise cutting to depths of up to a
maximum of about 5 m for the basement car park. The toe of the excavation will be setback at least 5 m
from the side boundaries and a minimum of 8 m from the steep dune face. Such excavations should
encounter very loose to loose sand grading to medium dense sand that should be excavatable using
conventional earthmoving equipment.
The sands encountered at this site should stand unsupported at slopes of about 1V:2H in the short-term
provided that groundwater seepage is not encountered and batters are protected from erosion. Given the
boundary setbacks mentioned above, trimming of excavation batters should be achievable at the specified
slopes, however should temporary support be required we understand that sheet piles are the preferred
shoring method.
The use of sheet piles would require consideration of the impact from vibrations on adjacent structures and
underground services. It is recommended that pre-drilling be undertaken to prevent vibration impacts from
sheet piling. A dilapidation survey of adjoining structures and pavements should be carried out prior to sheet
piling. It would be prudent to conduct vibration monitoring, at least during the initial stages of sheet piling, to
confirm the vibration impacts.
December 2008
Report No. 087682058 002 Rev.1 3
Page 6
LOTS 5 TO 8, SETTLERS COVE, SERENITY CLOSE, NOOSA Section 5.4 below provides advice and design parameters for retaining structures, however detailed design and construction advice should be obtained from a specialist contractor. This should include potential impact on adjacent buildings and services. Design drawings provided by Tate indicate that a ‘working platform’ comprising a minimum 150 mm thick layer of CBR15 material will be placed across the building area following bulk earthworks and compacted to 95% of the Maximum Standard Dry Density. Furthermore, the drawings indicate that assessment of the subgrade shall be carried out by DCP testing following construction of the working platform. 5.2.2 Filling The sand materials excavated from the site should be suitable for re-use as structural fill, provided any deleterious and/or organic materials are excluded. Fill should be compacted at moisture contents within the range of -2% to +1% of optimum moisture content for Standard Compaction. Select fill should have a maximum particle size of 100 mm for an uncompacted layer thickness of 200 mm and should be compacted by repeated rolling to achieve a dry density ratio of at least 95% of the Maximum Standard Dry Density for cohesive soils, or 75% Dry Density Index (DDI) for cohesionless soils. Further details for control and testing of fill are given in Australian Standard AS 3798-1996 "Guidelines on Earthworks for Commercial and Residential Developments". Our experience in similar ground conditions indicates that the achievement of 75% DDI in ‘clean’ dune sands will require the application of significant water and vibration, together with confinement of the layer under compaction. 5.3 Footings The results of our investigation indicate that medium dense (or denser) natural sands occur below about 0.4 m to 2.3 m depth across the site. Given the depth of the proposed basement excavation, such sands should occur across the building subgrade level following bulk earthworks. Conventional high level strip or pad footings may be used where there is a medium dense sand foundation. Strip or pad footings founded in the medium dense sand may be designed using an allowable bearing capacity of 200 kPa, with resultant settlements less than 25 mm. Golder Associates should carry out inspection and testing of the foundations during construction in order to confirm the allowable bearing capacity. All footings should found such that they are not adversely affected by any adjacent excavations batter slopes, trenches, or retaining walls that are not designed to support building loads. To minimise the potential for any adverse interaction effects, footings should found at least below a plane extending 1 m horizontally from the base of trenches/batter slopes/excavations/retaining walls, then rising up at 1V:2H, as illustrated in the following diagram. December 2008 Report No. 087682058 002 Rev.1 4
Page 7
LOTS 5 TO 8, SETTLERS COVE, SERENITY CLOSE, NOOSA
TRENCH BACKFILL
GROUND LEVEL
FOUND FOOTINGS
TRENCH SIDEWALL BELOW THIS LINE
45°
1.0m
1.0m
SEWER / STORMWATER PIPE
If any soil conditions encountered during excavations or piling are found to differ from those noted in the
geotechnical investigation, Golder Associates should be notified immediately, and an inspection carried out
to determine if changes to design are required.
5.4 Retaining Structure Design
The design of any retention system for this site should be conducted with due consideration of embedded
depth below the excavation level (ie. cantilever for sheet piles), variability in stratigraphy over the anchor
embedment length and anticipated ground conditions. Temporary support design must also take into
account the position of adjoining building foundations and underground services. It would be necessary to
gain permission from adjacent site owners and Noosa Council to install anchors below ground level into
adjoining properties.
Retaining structure design may be carried out using a triangular pressure distribution applicable to the wall
type (ie. active pressures for a cantilever wall or at rest pressures for a propped/anchored wall) and based
on the parameters in Table 3. The values in Table 3 assume that the walls are fully drained and no
allowance is included for construction loading, adjacent foundation loadings, the effect of sloping ground, or
backfill compaction stresses.
Table 2: Retaining Structure Design Parameters
Retained Material Unit Weight Friction Lateral Earth Pressure Coefficient
(t/m3) Angle (º)
Ka Ko Kp
Loose to Medium 1.8 28 0.36 0.5 2.7
Dense Sand
Compacted Fill * * * * *
Note: * Variable dependent upon the type of material used and the degree of compaction achieved.
Positive permanent drainage must be installed behind retaining walls.
December 2008
Report No. 087682058 002 Rev.1 5
Page 8
LOTS 5 TO 8, SETTLERS COVE, SERENITY CLOSE, NOOSA
5.5 Pavements
The design of pavements (flexible and rigid) is based upon the CBR value of the subgrade material. The
subgrade CBR may be obtained by i) laboratory soaked CBR tests, ii) correlations with DCP tests, and iii) the
Queensland Transport Pavement Design Manual – 1990 which provides presumptive insitu CBR values
based on soil type and site conditions.
At this site, the subgrade material is expected to be natural loose to medium dense silty sand/sand and/or
future fill. Section 5.3.3, Table 5.5 of the Queensland Transport Pavement Design Manual, suggests the
CBR values in Table 4 for various subgrade soil types and site conditions.
Table 3: Presumptive CBR Values
Subgrade Type Drainage conditions Presumptive CBR (%)
Silty Sand/Sand Poor 7
Good 10
For this site, we recommend that a preliminary design CBR of 10% be adopted for pavement design within
the anticipated subgrade. The subgrade CBR must be confirmed by DCP testing following earthworks
and/or excavation to subgrade level.
5.6 Drainage
Drainage should be designed to direct water away from building walls and footings. Waters collected from
hard surface (eg. terraces and paved areas) should be directed to the Council stormwater system along the
road frontage. Subsurface disposal of stormwater via RIPs with outlets at least 2 m below the ground
surface is not recommended within 5 m of the crest of the slopes in the western part of the site as shown on
Figure No. 1. The stormwater collection and disposal system should be designed by a hydraulic engineer.
6.0 IMPORTANT INFORMATION
Your attention is drawn to the document - “Important Information About Your Geotechnical Engineering
Report”, which is included in Appendix B of this report.
December 2008
Report No. 087682058 002 Rev.1 6
Page 9
é ¢ CitAy LOTS 5 TO 8, SETTLERS COVE, SERENITY CLOSE, NOOSA Report Signature Page GOLDER ASSOCIATES PTY LTD David Pollock BE(Civil) MIEAust Geoff Hurley MSc DIC C.Geol RPEQ 5716 Geotechnical Engineer Associate DJP/GAH/djp A.B.N. 64 006 107 857 j\2008\geotechnical\087682058\correspondence out\087682058 002 r rev1.doc December 2008 Golder Report No. 087682058 002 Rev.1 Associates
Page 10
Approximate. :
/ ~~ rest of Stopal. ?
Photo 1 - General Site Appearance
(Looking West Across Southern Part of Site)
. y Approximate
; Crest of Slope
Photo 2 - General Site Appearance <
(Looking West Across Northern Part of Site) we
LEGEND _ /
Denotes Area Where Subsurface
Disposal of Storm Water is Not Recommended
. . CLIENT PROJECT
Ss BH4 Denotes Approximate Borehole Location CBD Settlers Cove Pty Ltd Lots 5 & 6, Settlers Cove, Noosa
js Denotes Slope Angle and Direction ~_ DJP oe 10-11-08 mm SITE PLAN
CHECKED GAH* DATE 10-1 1-08
Note: Baseplans Prepared by Tate Professional Engineers Pty Ltd (Ref. Dwg. No.s S3000/08/L5-6&L7-8/ES‘). sens 1:500 (Approx.) sme 087682058 "| (Sheet 1 of 2)| 0 | A3
4J:\2008\ Geotechnical\087682058\ Figures Drawings\087682058 001 L F0001 Rev1Site Plan.dwg NOTE: THE * BESIDE THE TYPED INITIALS DENOTES THE ORIGINAL DRAWING ISSUE WAS SIGNED OR INITIALLED BY THAT RESPECTIVE PERSON.
Page 11
2 oie “BROPERTY BOUNDARY ee oe \ \ \ secant Photo 2 - ite Appearance (Looking West Across Northern Part of Site) LEGEND PROJECT CBD Settlers Cove Pty Ltd Lots 7 & 8, Settlers Cove, Noosa Denotes A\ imate Borehole Locati S BH4 Denotes Approximate Borehole Location ; a DRAWN DUP PE 40-44-08 . . Golder ‘CHECKED a DATE SITE PLAN ps Denotes Slope Angle and Direction Associates GAH 10-11-08 Note: Baseplans Prepared by Tate Professional Engineers Pty Ltd (Ref. Dwg. No.s S3000/08/L5-6&L7-8/ES1). sens 1:500 (Approx.) Prowse 087682058 “t (Sheet 2 of 2) O. A3 NOTE: THE * BESIDE THE TYPED ¥:\2008\Geotechnical\087682058\Figures Drawings\087682058 001 L F000! Rev1 TIALS DENOTES THE ORIGINAL DRAWING ISSUE WAS SIGNED OR INITIALLED BY THAT RESPECTIVE PERSON. te Plan.dwg
Page 12
Information contained on this drawing is the copyright of Golder Associates Pty Ltd. Unauthorised use or reproduction of this plan either wholly or in part without written permission infringes copyright . © Golder Associates Pty Ltd.
8m 40 m maximum
minimum
Basement
Wo De
rst ns
C ase e Ve
–A g
ngl eta
eo tio
fR n
epo
se
27º
35º
CLIENT PROJECT
CBD Settlers Cove Pty Ltd Lots 5 to 8, Serenity Close
DRAWN DATE TITLE
DJP 28/11/08 TYPICAL SECTION THROUGH
CHECKED DATE
SAND DUNE FACE
SCALE PROJECT No FIGURE No
1:400 A4 087682058 2
J:\2006\Geotechnical\06682026\TASK_1000\03_FIGURES_DRAWINGS\Fig02.ppt
Page 13
LOTS 5 TO 8, SETTLERS COVE, SERENITY CLOSE, NOOSA APPENDIX A Reports of Boreholes Explanation Notes, Abbreviations & Terms Used on Borehole and Test Pit Reports Method of Soil Description Used on Borehole and Test Pit Reports December 2008 Report No. 087682058 002 Rev.1
Page 14
Pisie:.. CBD Settlers Cove Geotechnical Investigation Lots 5-8, Serenity Cl, Settlers Cove INCLINATION: -90° REPORT OF BOREHOLE: BH 1 COORDS: mE mN AMG66 SURFACE RL: m DATUM: AHD HOLE DIA: mm_HOLE DEPTH: 6.00 m SHEET: 1 OF 1 DRILL RIG: Edson CP1 DRILLER: LOGGED: PGH _ DATE: 29/10/08 CHECKED: FE) DATE: -/2<% ORE.GLB FULL PAGE JA20081GEOTECHNICALWS76820S\ITECHNICAL DOC\GINTW87682058BH.GPJ GAPS_1.GDT 24/11/2008 1:34:16 PM GAPS_+_MD This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for information only and do not necessarily indicate the presence or absence of soi! or groundwater contamination. Sampling Field Material Description Zz > eg a 3 y 2 DCP TEST (AS1289.6.3.2) 8 \eale| ee eAVPLEOR eye 7 & SOIL / ROCK MATERIAL DESCRIPTION 5 loz Blows per 100 mm Elza gl hs 3lsa1 39 8 azo 5 10 15 20 26 ii = |pe|s| o& Z6o/38 2138 6.0 GP] Sandy GRAVEL (FILL) fine to medium size, brown a SAND | fine to medium grained, grey, trace of silt [becomingpalegrey =——i‘(Cié‘(Cs;é‘C;é;*~:S Qa = 2 g s 8 & z s 8 2 5 8 o 2 = 9 | Augered out to 5.2m 4 | END OF [email protected] m 7 J LJoje il bei GAP gINT FN. FO1b RL2
Page 15
PF ccite REPORT OF BOREHOLE:
cs SHEET: 1 OF 1
BH 2
2008 1:34:29 PM
ULL PAGE_J:\2008\GEOTECHNICALNO87682058\TECHNICAL DOCIGINT\087662058BH.GPJ GAPS_4.GDT 24/11.
GAPS_1_MDORE GLB Fl
This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for
gectechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for
information only and do not necessarily indicate the presence or absence of soil or groundwater contamination.
CLIENT: CBD Settlers Cove COORDS: mE mN AMG66 DRILL RIG: Edson CP1
PROJECT: Geotechnical Investigation SURFACE RL: m DATUM: AHD DRILLER:
LOCATION: Lots 5-8, Serenity Ci, Settlers Cove INCLINATION: -90° LOGGED: PGH DATE: 29/10/08
JOB NO: 087682058 HOLE DIA: mm HOLE DEPTH: 6.00 m CHECKED: PEP DATE: (-f2-09"
Drilling Sampling Field Material Description
2 >
23 a 3 w [2 DCP TEST (AS1289.6.3.2)
SEs «| <= SAMPLEOR |wi)2 | & SOIL / ROCK MATERIAL DESCRIPTION Slee Blows per 100 mm
= 5G w Es FIELD TEST gle. @ 5 26
2H oo s Zz
u lee) $| BE [oar 8] 83/8 giege §
0.0 = TSM] Sitty SAND
7 * fine to medium grained, dark grey, trace of tree roots 1
| 050 |
06 SAND 7
7 fine to medium grained, pale grey 7
105 4
15 4
g 4 4
g) J > 1
2 4 = 4
5 | 20-4 4
$ 4 4
2 4 ered out to 2.2 4
2 4 4
oO
2.54 4
2 3.0 = 4
35 4
404 4
4.5 +
| ® |
5.0 4
5.5 4
‘| 6.00 J
i END OF [email protected] m |
pte-teL J Loi ___ 8 wd LJ tet LLL
GAP gINT FN. FO1b
RL2
Page 16
Biss. CBD Settlers Cove REPORT OF BOREHOLE: BH 3 COORDS: mE mN AMG66 SHEET: 1 OF 1 DRILL RIG: Edson CP1 ULL. PAGE_J:\2008\GEOTECHNICAL\087662058\TECHNICAL DOCIGINT\0876820586H.GPJ GAPS 7.GDT 24/11/2008 1:34.32 PM GAPS_1_MDORE.GLB Fl This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for information only and do not necessarily indicate the presence or absence of soil or groundwater contamination. Geotechnical Investigation SURFACE RL: m DATUM: AHD DRILLER: Lots 5-8, Serenity Cl, Settlers Cove INCLINATION: -90° LOGGED: PG! DATE: 29/10/08 HOLE DIA: mm HOLE DEPTH: 6.00 m CHECKED: DATE: (12-78 Field Material Description z o 3 eg red 2 w |z DCP TEST (AS1289.6.3.2) 8 ze a) xg wy 2 & SOIL / ROCK MATERIAL DESCRIPTION p IGE Blows per 100 mm x |we 4 Oye @ Igo F jzo| & asd oO Oo a |22 wee) 3| 22 B/ 88] 8 gjeae_ 8S 00 Po 2°] GP | Sandy GRAVEL og! fine to meduim size, grey brown. 7 TO Sitty SAND 1 . fine to medium grained, dark grey, trace of tree roots 7 SAND 7 fine to medium grained, pale grey | [becoming palegrey =——si<“‘CSS*”*~*~<S;*=<=~=<=~:~=*;*;W 1 i 1 8 4 & 2 4 € ad s g 4 € gered out to 2.3m 4 & | 2 = 4 Augered out to 5.2 m 4 a 4 END OF [email protected] m "] LJ Uo LLL GAP gINT FN. FO1b RL2
Page 17
ULL PAGE J 2008\GEOTECHNICALIO876820S8\TECHNICAL_DOCIGINT\O87682058BH.GPJ GAPS_1.GDT 24/11/2008 1:34:33 PM
GAPS_1_MOORE GLB Fl
Pi cou:., REPORT OF BOREHOLE: BH 4
SHEET: 1 OF 1
CLIENT: CBD Settlers Cove COORDS: mE mN AMG66 DRILL RIG: Edson CP1
PROJECT: Geotechnical Investigation SURFACE RL: m DATUM: AHD DRILLER:
LOCATION: Lots 5-8, Serenity Cl, Settlers Cove INCLINATION: -90° LOGGED: PGH DATE: 29/10/08
JOB NO: 087682058 HOLE DIA: mm HOLE DEPTH: 6.00 m CHECKED: pst? DATE: j 42-O%
Drilling Sampling Field Material Description
z >
Bg 8 3 wig DCP TEST (AS1289.6.3.2)
SE «| se Papier, «(8g |& SOIL / ROCK MATERIAL DESCRIPTION 5 ee Blows per 100 mm
& 2a] @ | 88 locem 8) $2| 9 222 5 tt
3 (Hel S| Be fork Z/ 59/3 3 |88
0.0 TSP] SAND
7 . fine to medium grained, grey, trace of root matter 7
4
0.5 0.50 a — 4
1 becoming pale grey 4
1.0-] 4
1544 4
8 d J
2 4 4
ile g 7
2 4 J
g 4 4
oO
25 4
2 3.0 = 4
4 gered out to 3.1 4
3.5 +
40 4
45 4
4 o 4
5.0 4
5.5 4
‘| 2.00 2 J
me] END OF [email protected] m i
PIL J JL a | JoJo tt Lie
This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for
geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for
information only and do not necessarily indicate the presence or absence of soil or groundwater contamination. GAP gINT FN. FO1b
RL2
Page 18
24/11/2008 1:34:34 PN, E.GLB FULL PAGE J:\2008\GEOTECHNICALI087662058\TECHNICAL DOC\GINT\087682058BH.GPJ GAPS_1.GDT GAPS_1_MOOR' : REPORT OF BOREHOLE: BH 5 SHEET: 1 OF 1 CLIENT: CBD Settlers Cove COORDS: mE mN_ AMG66 DRILL RIG: Edson CP1 PROJECT: Geotechnical Investigation SURFACE RL: m DATUM: AHD DRILLER: LOCATION: Lots 5-8, Serenity C!, Settlers Cove INCLINATION: -90° LOGGED: PGH DATE: 29/10/08 JOB NO: 087682058 HOLE DIA: _mm_ HOLE DEPTH: 6.00 m CHECKED: pd) DATE: (-£2-64 Drilling Sampling Field Material Description z a & 23 g 3 wiz DCP TEST (AS1289.6.3.2) 8 = Ale | on Peep TEST wie Te SOIL / ROCK MATERIAL DESCRIPTION 2 Be Blows per 100 mm & lea) 2| 83 ae 8 3 221 5 10 15 20 25 3 be S| ae Pa z/SS/3 3 \88 0.0 TSP] SAND 7 1 fine to medium grained, grey and dark grey, trace of root 7 4 matter, trace of silt a 4 1950 |__| J 087 [becoming grey ~=—SOSC*~CS~<CS a 1 4 2 4 os} eg | | 1 J becoming pale grey 4 10 4 154 4 2 § 4 4 = 4 4 5 2.0 4 3 1 4 3 1 2 : 3 4 = 4 oO 25 4 2 3.0 = 4 3.54 | 404 4 45— augered out 3.9 - 5/4m 4 J a 1 5.0 | 5.5 4 | 6.00 A 4 “ END OF [email protected] m q Pot LJ LLL a LJ 21 lob i _f This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for information only and do not necessarily indicate the presence or absence of soil or groundwater contamination. GAP gINT FN. Fore
Page 19
Pisses. REPORT OF BOREHOLE: BH 6 E.GLB FULL PAGE J:\2008\GEOTECHNICAL(067682058\TECHNICAL_DOCIGINT\087662058EH.GPJ GAPS 1.GDT 24/17/2008 7:34:36 PM GAPS_1_MDOR' This report of borehole must be read in conjunction with accompanying notes and abbreviations. it has been prepared for geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for information only and do not necessarily indicate the presence or absence of soil or groundwater contamination. SHEET: 1 OF 1 CBD Settlers Cove COORDS: mE mN AMG66 DRILL RIG: Edson CP1 Geotechnical Investigation SURFACE RL: m DATUM: AHD DRILLER: Lots 5-8, Serenity Ci, Settlers Cove INCLINATION: -90° LOGGED: PGH DATE: 29/10/08 087682058 HOLE DIA: mm_ HOLE DEPTH: 6.00 m CHECKED: j>er"__‘ DATE: CIA Sampling Field Material Description z a 3 FS y 3 wu |Z DCP TEST (AS1289.6.3.2) SlExle| og heiptes, «(8/2 15 SOIL / ROCK MATERIAL DESCRIPTION Slee Blows per 100 mm Eggle | es B/e0l9 2 23 0 168 «020 g lBE S| BE Pa #169] 8 gigar_ 8 PD 6.0 SP] SAND 71 fine to medium grained, grey and dark grey, trace of root 7 q matter, trace of silt 7 05—-] com Tosh ff ee Ee 1 J becoming pale grey q 1.0 4 3 1.5 4 ? 4 4 gs) | 1 5 | 20 4 g 4 4 3 4 4 25 4 2 30-4 = 4 3.54 4 4044 4 45-4 4 5.0 4 5.5 om | 6.00 J J END OF [email protected] m d 4 —e eH ee EES LJ iJ —-—4 a GAP gINT FN. FO1b RL2
Page 20
ULL PAGE_J.\2008\GEOTECHNICALI087682058\TECHNICAL_DOCIGINT\087682058BH GPJ GAPS_1.GDT 24/11/2008 1:34.37 PM GAP5_1_MDORE GLB Fi Pease, REPORT OF BOREHOLE: BH 7 SHEET; 1 OF 1 CLIENT: CBD Settlers Cove COORDS: mE mN_ AMG66 DRILL RIG: Edson CP1 PROJECT: Geotechnical Investigation SURFACE RL: m DATUM: AHD DRILLER: LOCATION: Lots 5-8, Serenity Cl, Settlers Cove INCLINATION: -90° LOGGED: PG DATE: 30/10/08 JOB NO: 087682058 HOLE DIA: mm HOLE DEPTH: 6.00 m CHECKED: DATE: (-/2-29 Drilling Sampling Field Material Description Su a » Eg w 3 ws a DCP TEST (AS1289.6.3.2) Sez e| oe SAMPLER ele | SOIL / ROCK MATERIAL DESCRIPTION 5 \ee Blows per 100 mm = 2a) =| ES | peor 8/S013 gl2Zl 5 5s = [#2] $ | BE Pee 2153/3 2/88 0.0 TSP ]SAND 7 + fine to medium grained, grey and dark grey, trace of silt 7 - too}! | pey poo |__| J os 4 becoming pale grey 7 1.0 4 15 4 3 2 1 4 g = 4 4 8 4 4 5 g 4 4 3 2.0—- 4 8 4 4 3 a eT] 2 | 6 7 4 25 4 2 3.0 = ered out to 3.1m 4 3.56 4 404 4 45 4 4 Augered out to 5.3 m 4 50-4 ° 4 5.54 | 600 4 J END OF [email protected] m J pioIettL_ J ~L Joa Lio i te ble This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for information only and do not necessarily indicate the presence or absence of soil or groundwater contamination. GAP gINT FN. Fore
Page 21
ORE.GLE FULL PAGE J:12008\GEOTECHNICALI087682058\TECHNICAL DOCIGINT\087682058BH.GPJ GAP5_1.GDT 24/71/2008 1:34:38 PM GAPS_1_MD« Peo: REPORT OF BOREHOLE: BH 8 es SHEET: 1 OF 1 CLIENT: CBD Settlers Cove COORDS: mE mN AMG66 DRILL RIG: Edson CP1 PROJECT: Geotechnical Investigation SURFACE RL: m DATUM: AHD DRILLER: LOCATION: Lots 5-8, Serenity Cl, Settlers Cove INCLINATION: -90° LOGGED: PGH DATE: 30/10/08 JOB NO: 087682058 HOLE DIA: mm HOLE DEPTH: 6.00 m CHECKED: TAP DATE -/2-0% Drilling Sampling Field Material Description Su 2 = Eg sampteor |Zlo |2 w |é DCP TEST (AS1289.6.3.2) a |Z ~ w/o € Be Blows per 100 2 Be ae z FiEwDTest 8 i 5 SOIL / ROCK MATERIAL DESCRIPTION 2 a re mm ee 2 lee] $ | BE [OR #189] 8 2 [gee fT 0 SP | SAND 7 fine to medium grained, grey and dark grey, trace of silt 7 05 4 O60} eed Ld J d becoming pale grey 4 1.04 on 154 4 3 8 4 4 | J 1 3 4 4 5 | 20-5 4 ff | 1 3 4 4 © 25-4 4 g 3.0 4 3.54 4 40 4 4544 4 5.0 a 4 5.5 4 ‘| 6.00 J J END OF [email protected] m q This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for information only and do not necessarily indicate the presence or absence of soil or groundwater contamination. GAP gINT FN. FO1b RL2
Page 22
Biot. CBD Settlers Cove Geotechnical Investigation REPORT OF BOREHOLE: BH 9 COORDS: mE mN AMG66 SURFACE RL: m DATUM: AHD Lots 5-8, Serenity Cl, Settlers Cove INCLINATION: -90° SHEET: 1 OF 1 DRILL RIG: Edson CP1 DRILLER: LOGGED: PGH DATE: 30/10/08 CHECKED: TAS]? _ DATE: j-42-09 ‘ULL PAGE _J:\2008\GEOTECHNICAL\087682058\TECHNICAL DOC\GINT\087682058BH GPJ GAPS_1.GDT 24/14/2008 7:34:39 PM GAPS_1_MDOREGLB Fi This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for information only and do not necessarily indicate the presence or absence of soil or groundwater contamination. 087682058 HOLE DIA: mm HOLE DEPTH: 6.00 m Sampling Field Material Description bu a & 2 8 B 3 w |& DCP TEST (AS1289.6.3.2) Slee w| og Save R wie 7 & SOIL / ROCK MATERIAL DESCRIPTION 8 [be Blows per 100 mm = go| io | Es BiSolg Bi22 065 08 @ |DEPTI 2 ee S| ae Pa” 2|83/8 g isa 9.0 “| SP | SAND fine to medium grained, grey and dark grey, trace of tree 7 roots 4 4 4 050} tee Pd J becoming pale grey d ; 4 3 4 g 2 4 g 4 3 4 e 4 = 2 4 2 4 8 é 4 it to 3.0m 4 2 = 4 Augered out to 5.2 m 4 a 4 5}. 6.00 J ne END OF [email protected] m Pj Uo tb GAP gINT FN. FO1b RL2
Page 23
REPORT OF BOREHOLE: BH 10 SHEET: 1 OF 1 .MDORE.GLB FULL PAGE J\2008\GEOTECHNICALIOS7682058\TECHNICAL DOCIGINT\087682058BH.GPJ GAPS_1.GDT 24/71/2008 1:34:17 PM GAPS_1 CLIENT: CBD Settlers Cove COORDS: mE mN AMG66 DRILL RIG: Edson CP1 PROJECT: Geotechnical Investigation SURFACE RL: m DATUM: AHD DRILLER: LOCATION: Lots 5-8, Serenity Cl, Settlers Cove INCLINATION: -90° LOGGED: PGH DATE: 30/10/08 JOB NO: 087682058 HOLE DIA: mm HOLE DEPTH: 6.00 m cHecken: SE pate: (1209) Drilling Sampling Field Material Description z ° 3 23 a 3 w [2 DCP TEST (AS1289.6.3.2) e\szl | io SAMPLEOR [wi2 | € SOIL / ROCK MATERIAL DESCRIPTION 5 ibe Blows per 100 mm 2 Ga) &| £8 FieoTest |a|z |@ 2 |e Be l2K ag Oo} tao|o 5 |zz2 2 [es ee Pe #88) get _§ 8 § 2 2 0.0 TSP] SAND 7 5 fine to medium grained, grey and dark grey, trace of silt 7 7 0.50 7 0.8—| [becoming pale grey —=—=S=CS*~CS~CSCSsStS - 7 10-4 |_| J _ | 184 4 g 4 J s | 5 | 20 4 z) J | 3 4 4 oO J 5 J 25 = 4 2 3.0 = 4 4 Augered out to 3.7 m 4 354 4 40 4 45 4 5.0—| ° 4 55 4 ‘| 6.00 | ; | END OF [email protected] m 1 Jot abo i a | J_U _1__4 Lit _ Jt This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for information only and do not necessarily indicate the presence or absence of soil or groundwater contamination. GAP gINT FN. FO1b RL2
Page 24
Piss: REPORT OF BOREHOLE: BH 11 SHEET: 1 OF 1 DRILL RIG: Edson CP1 E.GLB FULL PAGE J\2008\GEOTECHNICAL\O87682058\TECHNICAL DOC\GINT\087682058BH GPJ GAPS_1.GDT 24/11/2008 1.34.18 PM GAPS5_1_MDORI This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for information only and do not necessarily indicate the presence or absence of soil or groundwater contamination. CLIENT: CBD Settlers Cove COORDS: mE mN AMG66 PROJECT: Geotechnical Investigation SURFACE RL: m DATUM: AHD DRILLER: LOCATION: Lots 5-8, Serenity Cl, Settlers Cove INCLINATION: -90° LOGGED: PGH ) DATE: 30/10/08 JOB NO: 087682058 HOLE DIA: mm HOLE DEPTH: 6.00 m CHECKED: Ke DATEL 1 2-e% Drilling Sampling Field Material Description Su a j Eg e 3 w lg DCP TEST (AS1289.6.3.2) Sléflelaog Pitprest (SIE 1 & SOIL / ROCK MATERIAL DESCRIPTION alta Blows per 100 mm Ege les 820/38 Bee 5 g ee) S| BE PR #/6S|3 gar of 2 8 2 60 ~]SP] SAND 7 | fine to medium grained, grey and dark grey, trace of silt 71 4 s 4 054 4 060) ee |_| d J becoming pale grey d 4 4 4 1.0] t—} 4 15 4 a 4 4 2 4 4 2 4 4 5 | 204 4 & 1 4 el] | 2 1 = 25 + 2 3.04 = It to 3.0 In 4 3.5 4 4.05 on 45 4 4 ° 4 5.0 4 55 5 | 6.00 J | END OF BOREHOLE @ 6,00 m d pitoi-tL io jJ ~L doit Poet Lt LLL GAP gINT FN. FO1b RL2
Page 25
PF ecie. REPORT OF BOREHOLE: BH 12
SHEET: 1 OF 14
1/2008 1:34:19 PM
LL PAGE JA2008\GEOTECHNICALI08768205@\T ECHNICAL DOCIGINTI087682058BH.GPJ GAPS_1.GDT 24/1
GAPS_1_MDORE GiB FU!
CLIENT: CBD Settlers Cove COORDS: mE mN AMG66 DRILL RIG: Edson CP1
PROJECT: Geotechnical Investigation SURFACE RL: m DATUM: AHD DRILLER:
LOCATION: Lots 5-8, Serenity Cl, Settlers Cove INCLINATION: -90° LOGGED: PGH DATE: 30/10/08
JOB NO: 087682058 HOLE DIA: mm HOLE DEPTH: 6.00 m CHECKED: (2¢' _ DATE: 1-42-08
Drilling Sampling Field Material Description
Su 3 z
eg y 3 wiz DCP TEST (AS1289.6.3.2)
8lézl «| oe eevRLEOR ele |] & SOIL / ROCK MATERIAL DESCRIPTION > BE Blows per 100 mm
eegle| es 8/ze1 8 ae 0
2 yee) S| we Pam #/ 89/3 gigso 5 19 «15
9.0 TSP] SAND
71 fine to medium grained, grey and dark grey, trace of silt 1
054 4
060 fe pt 4
J becoming pale grey q
4 Ss 4
1.05 4
~ | 18 4
z 4 4
5 2.04 4 i”
5 4 4
a] | LI |
oO
25 4
g 3.0 s tt to 3.41 4
4 9 4
2
3.56 4
40 4
45 4
5.04 ° +
5.54 4
| 6.00 J
J END OF [email protected] |
PILL J LL ____4 Jott ee | Jot fbi
This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for
geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for
information only and do not necessarily indicate the presence or absence of soil or groundwater contamination. GAP gINT FN. Fore
Page 26
LB _FULL PAGE J\2008\GEOTECHNICALIO87682058\TECHNICAL DOC\GINTW0876820583H.GPJ GAPS_1.GDT 24/11/2008 1:34:21 PM
GAPS_1_MDORE.G
PF citer, REPORT OF BOREHOLE: BH 13
es SHEET: 1 OF 1
CLIENT: CBD Settlers Cove COORDS: mE mN AMG66 DRILL RIG: Edson CP1
PROJECT: Geotechnical Investigation SURFACE RL: m DATUM: AHD DRILLER:
LOCATION: Lots 5-8, Serenity Ci, Settlers Cove INCLINATION: -90° LOGGED: PGH DATE: 30/10/08
JOB NO: 087682058 HOLE DIA: _mm_ HOLE DEPTH: 6.00m CHECKED: {>O(? DATE: (-72-2%
Drilling Sampling Fieid Material Description
Bu 2 &
23 g 3 wile DCP TEST (AS1289.6.3.2)
8 é fel xg PANPLE OR 8 g \5 SOIL / ROCK MATERIAL DESCRIPTION p (BE Blows per 100 mm
Flza/&| a8 Oo] sQ/0 222
g [e8] s | Be je 2/88 /8 giao ft
0.0 TSP] SAND
4 fine to medium grained, grey and dark grey, trace of tree 7
4 roots g 7
4 > 4
] 0.60. 1
08 [becoming pale grey ~=—S=~C*~CS*~CS~SsSCtiCStstStCSt«* [1 7
1.0 5 +
15 4
3 4 |_| 4
g 4 4
5 | 20 +
g] 4 |
z 1 J
25 4
| 9 |
=
2 3.0 = 4
35 -|
40-4 — 4
45— 4
5.0 a 4
55 4
1 6.00 . 4
a END OF [email protected] m |
pte to Le J LL a [Jeu t__4 -lL__H_
This report of borehole must be read in conjunction with accompanying notes and abbreviations. it has been prepared for
geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for
information only and do not necessarily indicate the presence or absence of soil or groundwater contamination. GAP gINT FN. FO1b
RL2
Page 27
ILL PAGE _J:\2008\GEOTECHNICALI087662058\TECHNICAL_DOC\GINTW876820S8BH.GPJ GAP5_1.GDT 24/11/2008 1:34:22 PM GAPS_1_MDORE.GLB FUI Pisses. JOB NO: 087682058 CLIENT: CBD Settlers Cove PROJECT: Geotechnical Investigation LOCATION: Lots 5-8, Serenity Cl, Settlers Cove INCLINATION: -90° HOLE DIA: _mm_ HOLE DEPTH: 6.00 m REPORT OF BOREHOLE: BH 14 COORDS: mE mN AMGE66 SURFACE RL: m DATUM: AHD SHEET: 1 OF 1 DRILL RIG: Edson CP1 DRILLER: LOGGED: PGH _ DATE: 30/10/08 CHECKED: §245U"_ DATE: t-!2-0$ Drilling Sampling Field Material Description PENETRATION RESISTANCE METHOD WATER DEPTH] RL ©] DEPTH 1 (metres) SAMPLE OR FIELD TEST RECOVERED GRAPHIC LOG USC Symbol SOIL / ROCK MATERIAL DESCRIPTION DCP TEST (AS1289.6.3.2) Blows per 100 mm lo 5 10 15 20 25 tt it tt CONSISTENCY MOISTURE DENSITY ° a | Is 3 Groundwater not encountered N i AD » Oo | 6.00 | =| Sity SAND fine to medium grained, dark grey, trace of tree roots “| SP] SAND fine to medium grained, pale grey It to 3.1m + 4 — L —lL we J LE _ This report of borehole must be read in conjunction with accompanying notes and abbreviations. |t has been prepared for geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for information only and do not necessarily indicate the presence or absence of soi! or groundwater contamination. END OF [email protected] m a ee GAP gINT FN. FO1b RL2
Page 28
Peau: REPORT OF BOREHOLE: BH 15 SHEET: 1 OF 1 IDORE GLB FULL PAGE J\2008\GEOTECHNICALI087682058\TECHNICAL DOCIGINT\0876820588H GPJ GAPS_1.GDT 24/11/2008 1.34-23 PM GAPS_1_M This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for information only and do not necessarily indicate the presence or absence of soil or groundwater contamination. CLIENT: CBD Settlers Cove COORDS: mE mN AMG66 DRILL RIG: Edson CP1 PROJECT: Geeotechnical Investigation SURFACE RL: m DATUM: AHD DRILLER: LOCATION: Lots 5-8, Serenity Cl, Settlers Cove INCLINATION: -90° LOGGED: PGH DATE: 30/10/08 JOB NO: 087682058 HOLE DIA: _mm_ HOLE DEPTH: 6.00 m CHECKED: s2§¥__ DATE: [12-08% Drilling Sampling Field Material Description z > 29 g 3 y 2 DCP TEST (AS1289.6.3.2) 8 ge g| 23 Be TEST g gié SOIL / ROCK MATERIAL DESCRIPTION > [Be Blows per 100 mm EF lzao| ek) a8 Oo} solo 2 \z2 2 fe] § | BE [PRM B/ 88/8 gigge § eS 5.0 TSPTSAND 7 fine to medium grained, grey and dark grey, trace of silt a 7 4 s 4 ‘| 040 || 1 0.5 — 4 0.60 |__| J 1.0 + 154 4 a 4 4 g 3 4 4 5 | 204 4 e| | ] 3 J 2 4 oO = 254 4 2 3.0 s gered out to 3.1m 4 35 an 404 |_| 4 45 4 5.0 a 4 5.54 om | 6.00 a END OF [email protected] m d | |} Ly i ttt LJ tot LLL GAP gINT FN. FO1b RL2
Page 29
Pou. CBD Settlers Cove Geotechnical Investigation REPORT OF BOREHOLE: BH 16 SHEET: 1 OF 1 PENETRATION RESISTANCE WATER RECOVERED GRAPHIC LOG USC Symbol METHOD ©] DEPTH ©] (metres) a u Groundwater not encountered AD L PAGE Ji2008\GEOTECHNICALIOS7682058\TECHNICAL DOCIGINTIG876820S88H.GPJ GAPS_1.GDT 24/11/2008 1.34:24 PM This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for information only and do not necessarily indicate the presence or absence of soil or groundwater contamination. GAPS_*_MDORE.GLB FULL COORDS: mE mN AMG66 DRILL RIG: Edson CP14 SURFACE RL: m DATUM: AHD DRILLER: Lots 5-8, Serenity Cl, Settlers Cove INCLINATION: -90° LOGGED: PGH DATE: 30/10/08 HOLE DIA: mm _ HOLE DEPTH: 6.00m CHECKED: ru DATE: (-(2-°9F Field Material Description > w 2 DCP TEST (AS1289.6.3.2) SOIL / ROCK MATERIAL DESCRIPTION > lor Blows per 100 mm 2 8 Zao 5 10 15 20 26 2 joa an) fine to medium grained, grey and dark grey, trace of silt 7 [becomingpalegrey == | _ 1 a ] = — gered out to 3.1m 4 = 4 a 4 END OF [email protected] y GAP gINT FN. FO1b RL2
Page 30
REGLB FULL PAGE J\2008\GEOTECHNICALIOB7682058TECHNICAL DOCIGINT\087682058BH.GPJ GAPS_1.GDT 24/11/2008 1:34:26 PM.
GAPS_1_MDO}
SHEET: 1 OF 1
CLIENT: CBD Settlers Cove COORDS: mE mN_ AMG66 DRILL RIG: Edson CP1
PROJECT: Geotechnical investigation SURFACE RL: m DATUM: AHD DRILLER:
LOCATION: Lots 5-8, Serenity Cl, Settlers Cove INCLINATION: -90° LOGGED: PGH DATE: 31/10/08
JOB NO: 087682058 HOLE DIA: mm _ HOLE DEPTH: 6.00m CHECKED: 6t DATE: (-12-%
Drilling Sampling Field Material Description
Sw 3 &
2 Q wy 3 wy a DCP TEST (AS1289.6.3.2)
Sléz| «| se roe «(8S 1s SOIL / ROCK MATERIAL DESCRIPTION Sloe Blows per 100 mm
E eal | 88 loco 8/82] 8 S\2z7 6 0 1% 20 2%
3 He] S| 36 [oR zjoS|3 gjss. 2 PO
0.0 *| SP | SAND
1 . fine to medium grained, grey and dark grey, trace of root 7
7 matter 4
Tos |] ep EP J
o6 4 becoming pale grey 4
4 3 4
1.04 4
1.5 om
3 4 | 4
g
= 4 4
8 4 an 4
5
3 4 4
3 | 207] |— a”
& 4 4
38
& 4 4
25-4 4
4 o 4
2 3.04 z/= gered out to 3.1 4
3.5
40-4 4
454 4
504 ° 4
5.5 a
| 6.00 ole J
° J END OF [email protected] m d
J joi-L. J -L-_____4/ Jette eee | Jot tLe
This report of borehole must be read in conjunction with accompanying notes and abbreviations. it has been prepared for
geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for
information only and do not necessarily indicate the presence or absence of scil or groundwater contamination. GAP giNT FN. Forte
Page 31
PF ccter REPORT OF BOREHOLE: BH 18 es SHEET: 1 OF 1 |MOORE.GLB FULL PAGE J:\2008&\GEOTECHNICALI087682058ITECHNICAL DOCIGINT\087682058BH GPJ GAPS_4.GDT 24/11/2008 1:34.27 PM GAPS_1 CLIENT: CBD Settlers Cove COORDS: mE mN_ AMG66 DRILL RIG: Edson CP1 PROJECT: Geotechnical Investigation SURFACE RL: m DATUM: AHD ORILLER: LOCATION: Lots 5-8, Serenity Cl, Settlers Cove INCLINATION: -90° LOGGED: PGH DATE: 31/10/08 JOB NO: 087682058 HOLE DIA: mm_ HOLE DEPTH: 6.00m CHECKED: CY DATE: (4z-04 Drilling Sampling Field Material Description Sw 9 3 Eg 2 3 wiz DCP TEST (AS1289.6.3.2) 8 ee «| xe BANPLE OR were SOIL / ROCK MATERIAL DESCRIPTION > |= Blows per 100 mm = |bo| a! Zs ole |e & loa G28) =| &® loser Gl 28/38 3 1650 5 10 15 20 25 3 lac] S| o£] Re Zj}oS| 5 3 joo 0.0 “| SP | SAND 7 | fine to medium grained, grey and dark grey, trace of silt 7 J > J jos) | eee EP |_| 4 05 d becoming paie grey q 10-4 4 4 4 4 1.56 4 8 4 4 2 ] 4 = 2.0 | 4 3 1 a g 4 4 oO 25-4 4 4 > 1 7 3 2 3.04 = 4 3.5 4 40—- 4 454 a 4 oO 4 5.0 4 5.5 4 9_| 600 2 w J END OF [email protected] m | ptJe-LotLe 4s ~Lo~_-_—-—-l a a pI Uo 4 bb This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for information only and do not necessarily indicate the presence or absence of soil or groundwater contamination. GAP giNT FN. FO1b RL2
Page 32
GLB FULL PAGE JA2008IGEOTECHNICALW87682058\TECHNICAL DOCIGINT\087682058BH.GPJ GAPS_1.GDT 24/17/2008 1:34:28 PM GAPS_1_MDORE. SHEET: 1 OF 4 CLIENT: CBD Settlers Cove COORDS: mE mN AMG66 DRILL RIG: Edson CP1 PROJECT: Geotechnical Investigation SURFACE RL: m DATUM: AHD DRILLER: LOCATION: Lots 5-8, Serenity Cl, Settlers Cove INCLINATION: -90° LOGGED: PGH DATE: 31/10/08 JOB NO: 087682058 HOLE DIA: mm HOLE DEPTH: 6.00 m CHECKED: DATE: (-(2 --¥ Drilling Sampling Field Material Description Zz > 23 a 3 y 2 DCP TEST (AS1289.6.3.2) Slefle| xz SaMPLrOR jgl2 7 & SOIL / ROCK MATERIAL DESCRIPTION 5 [be Blows per 100 mm E leg) | as DEPTH 8/32 3 8 |22lo 5 10 15 20-28 3 [Be] S| BE [Pre =|82| 8 2 [sah 90 SP} SAND 7 fine to medium grained, grey and dark grey, trace of sift 1 of ee P > J J becoming grey J 0.50 | 057 [becoming pala gray SCS I 1 1.0 on 4 “ 4 15 4 3 4 4 s = 4 | 4 8 4 4 & z 4 4 3 2.0 7 s 4 4 5 2 4 4 oO 254 4 4 a 4 4 = 4 2 3.044 = Augered out to 3.0 in 4 3.54 4 4.0 4 45 4 4 a 4 5.0 4 5.5 4 | 6.00 J J END OF [email protected] m 4 pete t—t J Li ——-H Jolt EE Pio Ud LL This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for information only and do not necessarily indicate the presence or absence of soil or groundwater contamination. GAP gINT FN. re
Page 33
E.GLB FULL PAGE J\2008\GEOTECHNICAL\O87682058\TECHNICAL DOCIGINT\087682058BH GPJ GAPS_1.GDT 24/11/2008 1.34.30 PM
PFiccise , REPORT OF BOREHOLE: BH 20
es SHEET: 1 OF 1
GAPS_1_MDOR
CLIENT: CBD Settlers Cove COORDS: mE mN AMG66 DRILL RIG: Edson CP1
PROJECT: Geotechnical Investigation SURFACE RL: m DATUM: AHD DRILLER:
LOCATION: Lots 5-8, Serenity Cl, Settiers Cove INCLINATION: -90° LOGGED: PGH DATE: 31/10/08
JOB NO: 087682058 HOLE DIA: mm HOLE DEPTH: 6.00 m CHECKED: BP DATE: i-(2-0&
Drilling Sampling Field Material Description
Sw a 3
EQ SAMPLE OR wy © 3 wy 2 DCP TEST (AS1289.6.3.2)
a |sZ = wie & a> Blows per 100 mm
g Bo & z 8 FIELD TEST 3 Eo a SOIL/ ROCK MATERIAL DESCRIPTION 5 a5 ; ; 0 ‘s - -
2 [ee S| ae Pe” 2/59] 3 2 [88
0.0 SP] SAND
1 fine to medium grained, grey and dark grey, trace of silt 7
| 3 |
052.50. Pod |__| |
J becoming pale grey J
1.0-4 4
4 4 4
15 4
g 4 4
a} | |
5
3 4 —_ 4
5 | 20-4 4
8 4 4
3 J 4
6
254 4
4 a 4
a 3.0 s/= ered out to 3.1m |
3.5 4
40 4
454 4
5.04 4
5.54 4
|| 6.00 4
END OF [email protected] m d
J Joi Lo} -L-_____ 4d ne Lt oof bb
This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for
geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for
information only and do not necessarily indicate the presence or absence of soil or groundwater contamination. GAP giNT FN. FO1b
RL2
Page 34
EXPLANATION OF NOTES, ABBREVIATIONS & TERMS Bicou USED ON BOREHOLE AND TEST PIT REPORTS DRILLING/EXCAVATION METHOD HQ Diamond Core - 63 mm AS* Auger Screwing RD Rotary blade or drag bit AD* Auger Drilling RT Rotary Tricone bit NMLC Diamond Core - 52 mm "vv V-Bit RAB __ Rotary Air Blast NQ Diamond Core - 47 mm ‘T TC-Bit, e.g. ADT RC Reverse Circulation BH Tractor Mounted Backhoe HA Hand Auger PT Push Tube EX Tracked Hydraulic Excavator ADH Hollow Auger CT Cable Tool Rig EE Existing Excavation DTC Diatube Coring JET Jetting HAND Excavated by Hand Methods WB Washbore or Bailer NDD Non-destructive drilling PENETRATION/EXCAVATION RESISTANCE L Low resistance. Rapid penetration possible with little effort from the equipment used. M Medium resistance. Excavation/possible at an acceptable rate with moderate effort from the equipment used. H High resistance to penetration/excavation. Further penetration is possible at a slow rate and requires significant effort from the equipment. R Refusal or Practical Refusal. No further progress possible without the risk of damage or unacceptable wear to the digging implement or machine. These assessments are subjective and are dependent on many factors including the equipment power, weight, condition of excavation or drilling tools, and the experience of the operator. WATER Ww Water level at date shown <J Partial water loss Cc Water inflow <4 Complete water loss GROUNDWATER NOT The observation of groundwater, whether present or not, was not possible due to drilling OBSERVED water, surface seepage or cave in of the borehole/test pit. GROUNDWATER NOT The borehole/test pit was dry soon after excavation. However, groundwater could be ENCOUNTERED present in less permeable strata. Inflow may have been observed had the borehole/test pit been left open for a longer period. SAMPLING AND TESTING SPT Standard Penetration Test to AS1289.6.3.1-1993 4,7,11 N=18 4,7,11 = Blows per 150mm. _N = Blows per 300mm penetration following 150mm seating 30/80mm Where practical refusal occurs, the blows and penetration for that interval are reported RW Penetration occurred under the rod weight only HW Penetration occurred under the hammer and rod weight only HB Hammer double bouncing on anvil DS Disturbed sample BDS Bulk disturbed sample G Gas Sample Ww Water Sample FP Field permeability test over section noted FV Field vane shear test expressed as uncorrected shear strength (sy = peak value, s, = residual value) PID Photoionisation Detector reading in ppm PM Pressuremeter test over section noted PP Pocket penetrometer test expressed as instrument reading in kPa U63 Thin walied tube sample - number indicates nominal sample diameter in millimetres WPT Water pressure tests Ranking of Visually Observable Contamination and Odour (for specific soil contamination assessment projects) R=0 No visible evidence of contamination R=A No non-natural odours identified R=1 Slight evidence of visible contamination R=B Slight non-natural odours identified R=2 Visible contamination R=C Moderate non-natura! odours identified R=3 Significant visible contamination R=D Strong non-natural odours identified ROCK CORE RECOVERY TCR = Total Core Recovery (%) SCR = Solid Core Recovery (%) RQD = Rock Quality Designation (%) _ SAxial lengths of core > 100mm « - Length of core run _ Length of core recovered «100 - > Length of cylindrical core recovered x 100 Length of core run Length of core run 100 GAP Form No. 6 RLS
Page 35
METHOD OF SOIL DESCRIPTION USED ON BOREHOLE AND TEST PIT REPORTS Crom. FILL ~~~] CLAY (CL, Cl or CH) Pose] GRAVEL (GP or GW) *“ 34 ORGANIC SOILS (OL or OH or Pt) 96 %d ty vy Pose pC v.| SAND (SP or SW) SU COBBLES or BOULDERS ° te Pe * x1 SILT (ML or MH) Combinations of these basic symbols may be used to indicate mixed materials such as sandy clay. CLASSIFICATION AND INFERRED STRATIGRAPHY Soil and Rock is classified and described in Reports of Boreholes and Test Pits using the preferred method given in AS1726 — 1993, Appendix A. The material properties are assessed in the field by visual/tactile methods. Particle Size Plasticity Properties Major Division | Sub Division Particle Size 40 BOULDERS > 200 mm cH cl High plasticity COBBLES 63 to 200 mm 30 Low Sty Modan clay Coarse 20 to 63 mm = oley clay 4 GRAVEL Medium 6.0 to 20mm 3 - = 20 OH or MH, Fine 2.0 to 6.0 mm 2 High liquid limit Coarse 0.6 to 2.0 mm 3 “ SAND Medium 0.2 to0.6mm a 10 | cit q CLUML Clay/Silt limit sitt Fine 0.075 to 0.2 mm OL it iow teas mit sitt SILT 0.002 to 0.075 mm 9 0 10 20 30 40 50 60 70 80 CLAY < 0.002 mm Liquid Limit (%) MOISTURE CONDITION AS1726 - 1993 Symbol Term Description D Dry Sands and gravels are free flowing. Clays & Silts may be brittle or friable and powdery. M Moist Soils are darker than in the dry condition & may feel cool. Sands and gravels tend to cohere. WwW Wet Soils exude free water. Sands and gravels tend to cohere. CONSISTENCY AND DENSITY AS1726 - 1993 Symbol Term Undrained Shear Symbol Term Density Index % SPT “N’ # Strength vs Very Soft 0 to 12 kPa VL Very Loose Less than 15 Oto4 $s Soft 12 to 25 kPa L Loose 15 to 35 4 to 10 F Firm 25 to 50 kPa MD Medium Dense 35 to 65 10 to 30 St Stiff 50 to 100 kPa D Dense 65 to 85 30 to 50 vst Very Stiff 100 to 200 kPa VD Very Dense Above 85 Above 50 H Hard Above 200 kPa the material. In the absence of test results, consistency and density may be assessed from correlations with the observed behaviour of # SPT correlations are not stated in AS1726 — 1993, and may be subject to corrections for overburden pressure and equipment type. GAP Form No. 5 RL7
Page 36
LOTS 5 TO 8, SETTLERS COVE, SERENITY CLOSE, NOOSA APPENDIX B Limitations December 2008 Report No. 087682058 002 Rev.1
Page 37
Golder L/ Associates LIMITATIONS This Document has been provided by Golder Associates Pty Ltd (“Golder”) subject to the following limitations: This Document has been prepared for the particular purpose outlined in Golder’s proposal and no responsibility is accepted for the use of this Document, in whole or in part, in other contexts or for any other purpose. The scope and the period of Golder’s Services are as described in Golder’s proposal, and are subject to restrictions and limitations. Golder did not perform a complete assessment of all possible conditions or circumstances that may exist at the site referenced in the Document. Ifa service is not expressly indicated, do not assume it has been provided. If a matter is not addressed, do not assume that any determination has been made by Golder in regards to it. ‘ Conditions may exist which were undetectable given the limited nature of the enquiry Golder was retained to undertake with respect to the site. Variations in conditions may occur between investigatory locations, and there may be special conditions pertaining to the site which have not been revealed by the investigation and which have not therefore been taken into account in the Document. Accordingly, additional studies and actions may be required. In addition, it is recognised that the passage of time affects the information and assessment provided in this Document. Golder’s opinions are based upon information that existed at the time of the production of the Document. It is understood that the Services provided allowed Golder to form no more than an opinion of the actual conditions of the site at the time the site was visited’and cannot be used to assess the effect of any subsequent changes in the quality of the site, or its surroundings, or any laws or regulations. Any assessments made in this Document are based on the conditions indicated from published sources and the investigation described. No warranty is included, either express or implied, that the actual conditions will conform exactly to the assessments contained in this Document. Where data supplied by the client or other external sources, including previous site investigation data, have been used, it has been assumed that the information is correct unless otherwise stated. No responsibility is accepted by Golder for incomplete or inaccurate data supplied by others. Golder may have retained subconsultants affiliated with Golder to provide Services for the benefit of Golder. To the maximum extent allowed by law, the Client acknowledges and agrees it will not have any direct legal recourse to, and waives any claim, demand, or cause of action against, Golder’s affiliated companies, and their employees, officers and directors. This Document is provided for sole use by the Client and is confidential to it and its professional advisers. No responsibility whatsoever for the contents of this Document will be accepted to any person other than the Client. Any use which a third party makes of this Document, or any reliance on or decisions to be made based on it, is the responsibility of such third parties. Golder accepts no responsibility for damages, if any, suffered by any third party as a result of decisions made or actions based on this Document. Golder Associates GAP Form No, LEGO4 RLI
Page 38
Golder Associates Pty Ltd 55 Kingsford Smith Parade Maroochydore Queensland 4558 Australia T: +61 7 5475 5900
Used in these records
About this file
- File size
- 15.5 MB (very large file)
- File type
No other editions are linked here.
Original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.