         December 2008




         GEOTECHNICAL INVESTIGATION




         Proposed Unit Development
         Lots 5 to 8 Settlers Cove
         Serenity Close, Noosa

         Submitted to:
         CBD Settlers Cove Pty Ltd
         PO Box 1923
         NOOSA HEADS QLD 4567
         Attn: Mr Gary Godfrey
REPORT




         Report Number:       087682058 002 Rev.1
         Distribution:
         2 Copies - CBD Settlers Cove Pty Ltd
         (1 Bound & 1 PDF)
         2 Copies - Tate Professional Engineers Pty Ltd
         (1 Bound & 1 PDF)
         1 Copy - Golder Associates
Full text of the other 37 pages

Page 2

                                              LOTS 5 TO 8, SETTLERS COVE, SERENITY CLOSE, NOOSA



Table of Contents

1.0     INTRODUCTION ........................................................................................................................................................ 1

2.0     SITE DESCRIPTION .................................................................................................................................................. 1

3.0     METHOD OF INVESTIGATION ................................................................................................................................. 1

4.0     SUBSURFACE CONDITIONS ................................................................................................................................... 1

5.0     COMMENTS AND RECOMMENDATIONS................................................................................................................ 2

        5.1         Slope Stability ............................................................................................................................................... 2

        5.2         Earthworks .................................................................................................................................................... 3

        5.2.1            Excavation............................................................................................................................................... 3

        5.2.2            Filling ....................................................................................................................................................... 4

        5.3         Footings ........................................................................................................................................................ 4

        5.4         Retaining Structure Design ........................................................................................................................... 5

        5.5         Pavements .................................................................................................................................................... 6

        5.6         Drainage ....................................................................................................................................................... 6

6.0     IMPORTANT INFORMATION .................................................................................................................................... 6



TABLES
Table 2: Stability Risk Levels............................................................................................................................................... 3

Table 3: Retaining Structure Design Parameters ................................................................................................................ 5

Table 4: Presumptive CBR Values ...................................................................................................................................... 6



FIGURES
Figure 1 – Site Plan
Figure 2 – Typical Section Through Sand Dune Face

APPENDICES
APPENDIX A
Reports of Boreholes

Explanation Notes, Abbreviations & Terms Used on Borehole and Test Pit Reports

Method of Soil Description Used on Borehole and Test Pit Reports

APPENDIX B
Limitations




December 2008
Report No. 087682058 002 Rev.1                                                            i

Page 3

                                  LOTS 5 TO 8, SETTLERS COVE, SERENITY CLOSE, NOOSA



1.0         INTRODUCTION
This report details the results of a geotechnical investigation carried out for a proposed unit development at
Lots 5 to 8, Settlers Cove, Serenity Close, Noosa Heads. The investigation was undertaken at the request of
Tate Professional Engineers Pty Ltd (Tate), the consulting engineers for the project, on behalf of the client
CBD Settlers Cove Pty Ltd.
Information supplied to us by Tate indicates that the proposed development comprises two and four level
structures of masonry construction, a pool and associated infrastructure. The four storey buildings will be
over single level, slab on ground basements. We are advised that stormwater disposal for the site will be via
Rapid Infiltration Pits (RIPs) which discharge through a permeable base no less than 2 m below the ground
surface.
This report summarises the results of the investigation and includes an assessment of slope stability
together with geotechnical recommendations regarding the design of earthworks, footings, retaining
structures and pavements.



2.0         SITE DESCRIPTION
Site is located at the western end of Serenity Close, Noosa Heads.
At the time of the investigation (Ref. Photograph 1 below), the proposed development area was covered by
grass and mulch with stands of vegetation. The ground surface sloped towards the south and south west at
angles of between about 5o to 8o. The ground slope increases (up to about 35º) in the southern and western
parts of the site within densely vegetated land down to Noosa Inlet.
The site layout, together with ground surface contours and photographs illustrating the site conditions at the
time of the investigation are shown on Figure No. 1.



3.0         METHOD OF INVESTIGATION
The investigation comprised a terrain assessment by a senior geotechnical engineer together with a
subsurface investigation by geotechnical personnel carried out between 29 to 31 October 2008. The
subsurface investigation comprised twenty boreholes (designated BH1 to BH20) drilled using a 4WD
mounted solid flight auger rig to depths of 6 m.
In-situ soil density was assessed by conducting dynamic cone penetrometer (DCP) tests from the ground
surface adjacent to each borehole and at various depths within the boreholes following augering (in order to
minimise the effect of rod friction on the test results).
Borehole locations are shown in Figure No. 1, Site Plan. Results of the fieldwork are presented in the
Reports of Boreholes in Appendix A, along with explanatory notes.



4.0         SUBSURFACE CONDITIONS
Available geological information1 indicates that the site is underlain by Quaternary (Pleistocene) age quartz
dune sand.
The subsurface conditions encountered in the boreholes generally comprised very loose to loose sand to
depths of between 0.4 m to 2.3 m, then dense sand to between about 2.7 m and 4.1 m depth, underlain by
medium dense to dense sand to the depth of investigation (ie. about 6 m).


1
    1:100,000 Geological Map, GYMPIE SPECIAL, Sheet 9445 & Part 9545, DME, 1999


December 2008
Report No. 087682058 002 Rev.1                                1

Page 4

                                 LOTS 5 TO 8, SETTLERS COVE, SERENITY CLOSE, NOOSA



Some fill comprising sandy gravel was encountered in borehole BH1 to 0.4 m below ground level (BGL). Silty
sand was encountered in boreholes BH2, BH3 and BH14 to depths of between 0.4 m and 0.5 m BGL.
Sandy gravel was encountered in borehole BH3 from the ground surface to 0.2 m BGL.
Groundwater was not encountered in any of the boreholes at the time of the investigation.
These results are similar to those from previous investigations on Lots 2 and 3, nearby (ref. Golder Reports
06682026(AA) and 97680045(B)).



5.0      COMMENTS AND RECOMMENDATIONS
5.1      Slope Stability
The steep dune face in the northern part of the site is described as a ‘Sand Dune Problem Area’ in Noosa
Council’s Planning Scheme.
Details on the stability of the site have been provided in earlier geotechnical reports by Golder Associates for
the ‘Settlers Cove’ development (Ref. 91680133). These previous reports indicate that the steep dune face
is marginally stable. The existing steep slope of the dune face (up to about 35º) appears to be maintained at
more than the normal angle of repose for loose sand (about 27º) by the mechanical binding action of the
roots associated with the dense cover of vegetation. The edge of the development area, near the crest of
the steep slope, corresponds to the Zone 1/Zone 2 boundary as defined in previous reports. Zone 1 includes
all the steep dune face, plus a margin on the uphill side of the crest to allow for the unlikely event that three
subsequent and effectively cumulative translational slide failures develop down the dune face. The
remaining near level areas are Zone 2.
In accordance with previous practice in the area, it is recommended that all structures are founded below a
plane rising at 27º from the toe of the steep dune face (Ref. Figure No. 2). For this proposed development,
the position and levels are such that relatively shallow foundations will be suitable. Provided the dune face is
managed as detailed in earlier reports (eg. retain existing vegetation), it is our opinion that there is a Very
Low to Low Risk of slope instability affecting the proposed development and that the development should
not detrimentally affect the stability of the dune face. Subsurface disposal of stormwater via RIPs with
outlets at least 2 m below the ground surface must not occur within 5 m of the crest of the dune face (ref.
Figure No. 1). The risk assessment for this project has been carried out following the Australian
Geomechanics Society (AGS) Guidelines for Landslide Risk Management (March 2007). Relative levels of
risk and their implications are given in Table 1 below.




December 2008
Report No. 087682058 002 Rev.1                         2

Page 5

                                 LOTS 5 TO 8, SETTLERS COVE, SERENITY CLOSE, NOOSA




Table 1: Stability Risk Levels
Risk Level                               Example Implications(1)

VH            VERY HIGH RISK             Unacceptable without treatment. Extensive detailed
                                         investigation and research, planning and implementation
                                         of treatment options essential to reduce risk to Low; may
                                         be too expensive and not practical. Work likely to cost
                                         more than value of property.

H             HIGH RISK                  Unacceptable without treatment. Detailed investigation,
                                         planning and implementation of treatment options required
                                         to reduce risk to Low. Work would cost a substantial sum
                                         in relation to the value of the property.

M             MODERATE RISK              May be tolerated in certain circumstances (subject to
                                         regulators’ approval) but requires investigation, planning
                                         and implementation of treatment options to reduce risk to
                                         Low. Treatment options to reduce to Low risk should be
                                         implemented as soon as practicable.

L             LOW RISK                   Usually acceptable to regulators. Where treatment has
                                         been required to reduce the risk to this level, ongoing
                                         maintenance required.

VL            VERY LOW RISK              Acceptable. Manage by normal slope maintenance
                                         procedures.

Note:   (1) The implications for a particular situation are to be determined by all parties to the risk assessment and may
        depend on the nature of the property at risk; these are only given as a general guide.




5.2       Earthworks
5.2.1       Excavation
We understand that the proposed earthworks for the development comprise cutting to depths of up to a
maximum of about 5 m for the basement car park. The toe of the excavation will be setback at least 5 m
from the side boundaries and a minimum of 8 m from the steep dune face. Such excavations should
encounter very loose to loose sand grading to medium dense sand that should be excavatable using
conventional earthmoving equipment.

The sands encountered at this site should stand unsupported at slopes of about 1V:2H in the short-term
provided that groundwater seepage is not encountered and batters are protected from erosion. Given the
boundary setbacks mentioned above, trimming of excavation batters should be achievable at the specified
slopes, however should temporary support be required we understand that sheet piles are the preferred
shoring method.
The use of sheet piles would require consideration of the impact from vibrations on adjacent structures and
underground services. It is recommended that pre-drilling be undertaken to prevent vibration impacts from
sheet piling. A dilapidation survey of adjoining structures and pavements should be carried out prior to sheet
piling. It would be prudent to conduct vibration monitoring, at least during the initial stages of sheet piling, to
confirm the vibration impacts.




December 2008
Report No. 087682058 002 Rev.1                             3

Page 6

                                 LOTS 5 TO 8, SETTLERS COVE, SERENITY CLOSE, NOOSA



Section 5.4 below provides advice and design parameters for retaining structures, however detailed design
and construction advice should be obtained from a specialist contractor. This should include potential impact
on adjacent buildings and services.
Design drawings provided by Tate indicate that a ‘working platform’ comprising a minimum 150 mm thick
layer of CBR15 material will be placed across the building area following bulk earthworks and compacted to
95% of the Maximum Standard Dry Density. Furthermore, the drawings indicate that assessment of the
subgrade shall be carried out by DCP testing following construction of the working platform.



5.2.2       Filling
The sand materials excavated from the site should be suitable for re-use as structural fill, provided any
deleterious and/or organic materials are excluded.
Fill should be compacted at moisture contents within the range of -2% to +1% of optimum moisture content
for Standard Compaction. Select fill should have a maximum particle size of 100 mm for an uncompacted
layer thickness of 200 mm and should be compacted by repeated rolling to achieve a dry density ratio of at
least 95% of the Maximum Standard Dry Density for cohesive soils, or 75% Dry Density Index (DDI) for
cohesionless soils.
Further details for control and testing of fill are given in Australian Standard AS 3798-1996 "Guidelines on
Earthworks for Commercial and Residential Developments".
Our experience in similar ground conditions indicates that the achievement of 75% DDI in ‘clean’ dune sands
will require the application of significant water and vibration, together with confinement of the layer under
compaction.



5.3       Footings
The results of our investigation indicate that medium dense (or denser) natural sands occur below about
0.4 m to 2.3 m depth across the site. Given the depth of the proposed basement excavation, such sands
should occur across the building subgrade level following bulk earthworks. Conventional high level strip or
pad footings may be used where there is a medium dense sand foundation. Strip or pad footings founded in
the medium dense sand may be designed using an allowable bearing capacity of 200 kPa, with resultant
settlements less than 25 mm.
Golder Associates should carry out inspection and testing of the foundations during construction in order to
confirm the allowable bearing capacity.
All footings should found such that they are not adversely affected by any adjacent excavations batter
slopes, trenches, or retaining walls that are not designed to support building loads. To minimise the potential
for any adverse interaction effects, footings should found at least below a plane extending 1 m horizontally
from the base of trenches/batter slopes/excavations/retaining walls, then rising up at 1V:2H, as illustrated in
the following diagram.




December 2008
Report No. 087682058 002 Rev.1                         4

Page 7

                                 LOTS 5 TO 8, SETTLERS COVE, SERENITY CLOSE, NOOSA



                                     TRENCH BACKFILL
      GROUND LEVEL




                                                                  FOUND FOOTINGS
      TRENCH SIDEWALL                                             BELOW THIS LINE
                                                           45°


                                             1.0m
                                                    1.0m



       SEWER / STORMWATER PIPE

If any soil conditions encountered during excavations or piling are found to differ from those noted in the
geotechnical investigation, Golder Associates should be notified immediately, and an inspection carried out
to determine if changes to design are required.



5.4       Retaining Structure Design
The design of any retention system for this site should be conducted with due consideration of embedded
depth below the excavation level (ie. cantilever for sheet piles), variability in stratigraphy over the anchor
embedment length and anticipated ground conditions. Temporary support design must also take into
account the position of adjoining building foundations and underground services. It would be necessary to
gain permission from adjacent site owners and Noosa Council to install anchors below ground level into
adjoining properties.

Retaining structure design may be carried out using a triangular pressure distribution applicable to the wall
type (ie. active pressures for a cantilever wall or at rest pressures for a propped/anchored wall) and based
on the parameters in Table 3. The values in Table 3 assume that the walls are fully drained and no
allowance is included for construction loading, adjacent foundation loadings, the effect of sloping ground, or
backfill compaction stresses.
Table 2: Retaining Structure Design Parameters
Retained Material      Unit Weight   Friction              Lateral Earth Pressure Coefficient
                       (t/m3)        Angle (º)

                                                           Ka           Ko               Kp

Loose to Medium          1.8             28                0.36         0.5              2.7
Dense Sand



Compacted Fill           *               *                 *            *                *



Note: * Variable dependent upon the type of material used and the degree of compaction achieved.


Positive permanent drainage must be installed behind retaining walls.


December 2008
Report No. 087682058 002 Rev.1                         5

Page 8

                                 LOTS 5 TO 8, SETTLERS COVE, SERENITY CLOSE, NOOSA



5.5       Pavements
The design of pavements (flexible and rigid) is based upon the CBR value of the subgrade material. The
subgrade CBR may be obtained by i) laboratory soaked CBR tests, ii) correlations with DCP tests, and iii) the
Queensland Transport Pavement Design Manual – 1990 which provides presumptive insitu CBR values
based on soil type and site conditions.
At this site, the subgrade material is expected to be natural loose to medium dense silty sand/sand and/or
future fill. Section 5.3.3, Table 5.5 of the Queensland Transport Pavement Design Manual, suggests the
CBR values in Table 4 for various subgrade soil types and site conditions.
Table 3: Presumptive CBR Values
Subgrade Type          Drainage conditions         Presumptive CBR (%)
Silty Sand/Sand            Poor                    7
                           Good                    10


For this site, we recommend that a preliminary design CBR of 10% be adopted for pavement design within
the anticipated subgrade. The subgrade CBR must be confirmed by DCP testing following earthworks
and/or excavation to subgrade level.

5.6       Drainage
Drainage should be designed to direct water away from building walls and footings. Waters collected from
hard surface (eg. terraces and paved areas) should be directed to the Council stormwater system along the
road frontage. Subsurface disposal of stormwater via RIPs with outlets at least 2 m below the ground
surface is not recommended within 5 m of the crest of the slopes in the western part of the site as shown on
Figure No. 1. The stormwater collection and disposal system should be designed by a hydraulic engineer.



6.0      IMPORTANT INFORMATION
Your attention is drawn to the document - “Important Information About Your Geotechnical Engineering
Report”, which is included in Appendix B of this report.




December 2008
Report No. 087682058 002 Rev.1                         6

Page 9

 

é ¢
CitAy LOTS 5 TO 8, SETTLERS COVE, SERENITY CLOSE, NOOSA

Report Signature Page

 

GOLDER ASSOCIATES PTY LTD

David Pollock BE(Civil) MIEAust Geoff Hurley MSc DIC C.Geol RPEQ 5716
Geotechnical Engineer Associate

DJP/GAH/djp

A.B.N. 64 006 107 857

j\2008\geotechnical\087682058\correspondence out\087682058 002 r rev1.doc

 

December 2008 Golder
Report No. 087682058 002 Rev.1 Associates

Page 10

 

 

   

           
    

 

Approximate. :
/ ~~ rest of Stopal. ?

   

Photo 1 - General Site Appearance
(Looking West Across Southern Part of Site)

 

 

 

 

 

 

 

 

. y Approximate
; Crest of Slope
Photo 2 - General Site Appearance <
(Looking West Across Northern Part of Site) we
LEGEND _ /
Denotes Area Where Subsurface
Disposal of Storm Water is Not Recommended
. . CLIENT PROJECT
Ss BH4 Denotes Approximate Borehole Location CBD Settlers Cove Pty Ltd Lots 5 & 6, Settlers Cove, Noosa
js Denotes Slope Angle and Direction ~_ DJP oe 10-11-08 mm SITE PLAN
CHECKED GAH* DATE 10-1 1-08
Note: Baseplans Prepared by Tate Professional Engineers Pty Ltd (Ref. Dwg. No.s S3000/08/L5-6&L7-8/ES‘). sens 1:500 (Approx.) sme 087682058 "| (Sheet 1 of 2)| 0 | A3

 

 

 

 

 

 

 

4J:\2008\ Geotechnical\087682058\ Figures Drawings\087682058 001 L F0001 Rev1Site Plan.dwg NOTE: THE * BESIDE THE TYPED INITIALS DENOTES THE ORIGINAL DRAWING ISSUE WAS SIGNED OR INITIALLED BY THAT RESPECTIVE PERSON.

 

Page 11

 

 

 

 

2 oie

“BROPERTY BOUNDARY
ee oe
\ \ \

secant

 

 

 

 

 

 

 

 

 

 

 

Photo 2 - ite Appearance
(Looking West Across Northern Part of Site)
LEGEND
PROJECT
CBD Settlers Cove Pty Ltd Lots 7 & 8, Settlers Cove, Noosa
Denotes A\ imate Borehole Locati
S BH4 Denotes Approximate Borehole Location ; a DRAWN DUP PE 40-44-08
. . Golder ‘CHECKED a DATE SITE PLAN
ps Denotes Slope Angle and Direction Associates GAH 10-11-08
Note: Baseplans Prepared by Tate Professional Engineers Pty Ltd (Ref. Dwg. No.s S3000/08/L5-6&L7-8/ES1). sens 1:500 (Approx.) Prowse 087682058 “t (Sheet 2 of 2) O. A3

 

 

 

 

NOTE: THE * BESIDE THE TYPED

 

¥:\2008\Geotechnical\087682058\Figures Drawings\087682058 001 L F000! Rev1 TIALS DENOTES THE ORIGINAL DRAWING ISSUE WAS SIGNED OR INITIALLED BY THAT RESPECTIVE PERSON.

 

te Plan.dwg

 

Page 12

Information contained on this drawing is the copyright of Golder Associates Pty Ltd. Unauthorised use or reproduction of this plan either wholly or in part without written permission infringes copyright . © Golder Associates Pty Ltd.




                                                                                                                                8m                                                                     40 m maximum
                                                                                                                              minimum



                                                                               Basement



                                                                                                                                          Wo                                                      De
                                                                                                                                            rst                                                        ns
                                                                                                                                                C        ase                                              e   Ve
                                                                                                                                                                 –A                                              g
                                                                                                                                                                       ngl                                           eta
                                                                                                                                                                           eo                                              tio
                                                                                                                                                                                   fR                                         n
                                                                                                                                                                                        epo
                                                                                                                                                                                           se




                                                                                                                                                                                                                                                         27º
                                                                                                                                                                                                                                                               35º




                                                                                                                                                            CLIENT                                                                          PROJECT
                                                                                                                                                                      CBD Settlers Cove Pty Ltd                                                            Lots 5 to 8, Serenity Close
                                                                                                                                                            DRAWN                                     DATE                                  TITLE
                                                                                                                                                                            DJP                                 28/11/08                              TYPICAL SECTION THROUGH
                                                                                                                                                            CHECKED                                   DATE
                                                                                                                                                                                                                                                           SAND DUNE FACE
                                                                                                                                                            SCALE                                                                           PROJECT No                      FIGURE No
                                                                                                                                                                                           1:400                                    A4                     087682058                     2
J:\2006\Geotechnical\06682026\TASK_1000\03_FIGURES_DRAWINGS\Fig02.ppt

Page 13

                                 LOTS 5 TO 8, SETTLERS COVE, SERENITY CLOSE, NOOSA




APPENDIX A
Reports of Boreholes
Explanation Notes, Abbreviations & Terms Used on Borehole
and Test Pit Reports
Method of Soil Description Used on Borehole and Test Pit
Reports




December 2008
Report No. 087682058 002 Rev.1

Page 14

 

Pisie:..

CBD Settlers Cove
Geotechnical Investigation
Lots 5-8, Serenity Cl, Settlers Cove INCLINATION: -90°

REPORT OF BOREHOLE: BH 1

COORDS: mE mN AMG66
SURFACE RL: m DATUM: AHD

HOLE DIA: mm_HOLE DEPTH: 6.00 m

SHEET: 1 OF 1
DRILL RIG: Edson CP1

DRILLER:

LOGGED: PGH _ DATE: 29/10/08
CHECKED: FE) DATE: -/2<%

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ORE.GLB FULL PAGE JA20081GEOTECHNICALWS76820S\ITECHNICAL DOC\GINTW87682058BH.GPJ GAPS_1.GDT 24/11/2008 1:34:16 PM

 

 

 

 

 

GAPS_+_MD

 

 

 

 

 

This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for
geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for
information only and do not necessarily indicate the presence or absence of soi! or groundwater contamination.

 

Sampling Field Material Description
Zz >
eg a 3 y 2 DCP TEST (AS1289.6.3.2)
8 \eale| ee eAVPLEOR eye 7 & SOIL / ROCK MATERIAL DESCRIPTION 5 loz Blows per 100 mm
Elza gl hs 3lsa1 39 8 azo 5 10 15 20 26
ii
= |pe|s| o& Z6o/38 2138
6.0 GP] Sandy GRAVEL (FILL)
fine to medium size, brown
a
SAND |
fine to medium grained, grey, trace of silt
[becomingpalegrey =——i‘(Cié‘(Cs;é‘C;é;*~:S
Qa
=
2
g
s
8
&
z
s
8
2
5
8
o
2 =
9 |
Augered out to 5.2m 4
| END OF [email protected] m 7
J LJoje il bei

 

 

 

 

 

 

 

 

GAP gINT FN. FO1b
RL2

 

 

Page 15

 

PF ccite REPORT OF BOREHOLE:
cs SHEET: 1 OF 1

BH 2

 

 

 

 

 

2008 1:34:29 PM

ULL PAGE_J:\2008\GEOTECHNICALNO87682058\TECHNICAL DOCIGINT\087662058BH.GPJ GAPS_4.GDT 24/11.

 

 

 

 

    
 

 

 

 

GAPS_1_MDORE GLB Fl

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for
gectechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for
information only and do not necessarily indicate the presence or absence of soil or groundwater contamination.

 

CLIENT: CBD Settlers Cove COORDS: mE mN AMG66 DRILL RIG: Edson CP1
PROJECT: Geotechnical Investigation SURFACE RL: m DATUM: AHD DRILLER:
LOCATION: Lots 5-8, Serenity Ci, Settlers Cove INCLINATION: -90° LOGGED: PGH DATE: 29/10/08
JOB NO: 087682058 HOLE DIA: mm HOLE DEPTH: 6.00 m CHECKED: PEP DATE: (-f2-09"
Drilling Sampling Field Material Description
2 >
23 a 3 w [2 DCP TEST (AS1289.6.3.2)
SEs «| <= SAMPLEOR |wi)2 | & SOIL / ROCK MATERIAL DESCRIPTION Slee Blows per 100 mm
= 5G w Es FIELD TEST gle. @ 5 26
2H oo s Zz
u lee) $| BE [oar 8] 83/8 giege §
0.0 = TSM] Sitty SAND
7 * fine to medium grained, dark grey, trace of tree roots 1
| 050 |
06 SAND 7
7 fine to medium grained, pale grey 7
105 4
15 4
g 4 4
g) J > 1
2 4 = 4
5 | 20-4 4
$ 4 4
2 4 ered out to 2.2 4
2 4 4
oO
2.54 4
2 3.0 = 4
35 4
404 4
4.5 +
| ® |
5.0 4
5.5 4
‘| 6.00 J
i END OF [email protected] m |
pte-teL J Loi ___ 8 wd LJ tet LLL

 

 

 

GAP gINT FN. FO1b
RL2

 

 

Page 16

 

Biss.

CBD Settlers Cove

REPORT OF BOREHOLE: BH 3

COORDS: mE mN AMG66

SHEET: 1 OF 1
DRILL RIG: Edson CP1

 

 

 

 

 

 

 

 

 

 

 

ULL. PAGE_J:\2008\GEOTECHNICAL\087662058\TECHNICAL DOCIGINT\0876820586H.GPJ GAPS 7.GDT 24/11/2008 1:34.32 PM

  
 

 

 

 

 

 

 

 

 

 

 

 

GAPS_1_MDORE.GLB Fl

 

This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for
geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for
information only and do not necessarily indicate the presence or absence of soil or groundwater contamination.

 

Geotechnical Investigation SURFACE RL: m DATUM: AHD DRILLER:
Lots 5-8, Serenity Cl, Settlers Cove INCLINATION: -90° LOGGED: PG! DATE: 29/10/08
HOLE DIA: mm HOLE DEPTH: 6.00 m CHECKED: DATE: (12-78
Field Material Description
z o 3
eg red 2 w |z DCP TEST (AS1289.6.3.2)
8 ze a) xg wy 2 & SOIL / ROCK MATERIAL DESCRIPTION p IGE Blows per 100 mm
x |we 4 Oye @ Igo
F jzo| & asd oO Oo a |22
wee) 3| 22 B/ 88] 8 gjeae_ 8S
00 Po 2°] GP | Sandy GRAVEL
og! fine to meduim size, grey brown. 7
TO Sitty SAND 1
. fine to medium grained, dark grey, trace of tree roots 7
SAND 7
fine to medium grained, pale grey |
[becoming palegrey =——si<“‘CSS*”*~*~<S;*=<=~=<=~:~=*;*;W 1
i 1
8 4
&
2 4
€ ad
s
g 4
€ gered out to 2.3m 4
& |
2 = 4
Augered out to 5.2 m 4
a 4
END OF [email protected] m "]
LJ Uo LLL

 

 

 

 

 

 

 

 

GAP gINT FN. FO1b
RL2

 

 

Page 17

ULL PAGE J 2008\GEOTECHNICALIO876820S8\TECHNICAL_DOCIGINT\O87682058BH.GPJ GAPS_1.GDT 24/11/2008 1:34:33 PM

GAPS_1_MOORE GLB Fl

 

 

Pi cou:., REPORT OF BOREHOLE: BH 4
SHEET: 1 OF 1

 

 

 

 

 

 

 

      

 

CLIENT: CBD Settlers Cove COORDS: mE mN AMG66 DRILL RIG: Edson CP1
PROJECT: Geotechnical Investigation SURFACE RL: m DATUM: AHD DRILLER:
LOCATION: Lots 5-8, Serenity Cl, Settlers Cove INCLINATION: -90° LOGGED: PGH DATE: 29/10/08
JOB NO: 087682058 HOLE DIA: mm HOLE DEPTH: 6.00 m CHECKED: pst? DATE: j 42-O%
Drilling Sampling Field Material Description
z >
Bg 8 3 wig DCP TEST (AS1289.6.3.2)
SE «| se Papier, «(8g |& SOIL / ROCK MATERIAL DESCRIPTION 5 ee Blows per 100 mm
& 2a] @ | 88 locem 8) $2| 9 222 5 tt
3 (Hel S| Be fork Z/ 59/3 3 |88
0.0 TSP] SAND
7 . fine to medium grained, grey, trace of root matter 7
4
0.5 0.50 a — 4
1 becoming pale grey 4
1.0-] 4
1544 4
8 d J
2 4 4
ile g 7
2 4 J
g 4 4
oO
25 4
2 3.0 = 4
4 gered out to 3.1 4
3.5 +
40 4
45 4
4 o 4
5.0 4
5.5 4
‘| 2.00 2 J
me] END OF [email protected] m i
PIL J JL a | JoJo tt Lie

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for
geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for

information only and do not necessarily indicate the presence or absence of soil or groundwater contamination. GAP gINT FN. FO1b

RL2

 

 

Page 18

24/11/2008 1:34:34 PN,

E.GLB FULL PAGE J:\2008\GEOTECHNICALI087662058\TECHNICAL DOC\GINT\087682058BH.GPJ GAPS_1.GDT

GAPS_1_MOOR'

 

 

: REPORT OF BOREHOLE: BH 5
SHEET: 1 OF 1

 

 

 

 

 

 

 

 

 

 

CLIENT: CBD Settlers Cove COORDS: mE mN_ AMG66 DRILL RIG: Edson CP1
PROJECT: Geotechnical Investigation SURFACE RL: m DATUM: AHD DRILLER:
LOCATION: Lots 5-8, Serenity C!, Settlers Cove INCLINATION: -90° LOGGED: PGH DATE: 29/10/08
JOB NO: 087682058 HOLE DIA: _mm_ HOLE DEPTH: 6.00 m CHECKED: pd) DATE: (-£2-64
Drilling Sampling Field Material Description
z a &
23 g 3 wiz DCP TEST (AS1289.6.3.2)
8 = Ale | on Peep TEST wie Te SOIL / ROCK MATERIAL DESCRIPTION 2 Be Blows per 100 mm
& lea) 2| 83 ae 8 3 221 5 10 15 20 25
3 be S| ae Pa z/SS/3 3 \88
0.0 TSP] SAND
7 1 fine to medium grained, grey and dark grey, trace of root 7
4 matter, trace of silt a 4
1950 |__| J
087 [becoming grey ~=—SOSC*~CS~<CS a 1
4 2 4
os} eg | | 1
J becoming pale grey 4
10 4
154 4
2
§ 4 4
= 4 4
5 2.0 4
3 1 4
3 1 2 :
3 4 = 4
oO
25 4
2 3.0 = 4
3.54 |
404 4
45— augered out 3.9 - 5/4m 4
J a 1
5.0 |
5.5 4
| 6.00 A 4
“ END OF [email protected] m q
Pot LJ LLL a LJ 21 lob i _f

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for
geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for

information only and do not necessarily indicate the presence or absence of soil or groundwater contamination. GAP gINT FN. Fore

 

 

Page 19

 

Pisses.

REPORT OF BOREHOLE: BH 6

 

 

 

 

 

 

E.GLB FULL PAGE J:\2008\GEOTECHNICAL(067682058\TECHNICAL_DOCIGINT\087662058EH.GPJ GAPS 1.GDT 24/17/2008 7:34:36 PM

 

 

 

 

 

 

GAPS_1_MDOR'

 

 

This report of borehole must be read in conjunction with accompanying notes and abbreviations. it has been prepared for
geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for
information only and do not necessarily indicate the presence or absence of soil or groundwater contamination.

 

 

 

 

 

SHEET: 1 OF 1
CBD Settlers Cove COORDS: mE mN AMG66 DRILL RIG: Edson CP1
Geotechnical Investigation SURFACE RL: m DATUM: AHD DRILLER:
Lots 5-8, Serenity Ci, Settlers Cove INCLINATION: -90° LOGGED: PGH DATE: 29/10/08
087682058 HOLE DIA: mm_ HOLE DEPTH: 6.00 m CHECKED: j>er"__‘ DATE: CIA
Sampling Field Material Description
z a 3
FS y 3 wu |Z DCP TEST (AS1289.6.3.2)
SlExle| og heiptes, «(8/2 15 SOIL / ROCK MATERIAL DESCRIPTION Slee Blows per 100 mm
Eggle | es B/e0l9 2 23 0 168 «020
g lBE S| BE Pa #169] 8 gigar_ 8 PD
6.0 SP] SAND
71 fine to medium grained, grey and dark grey, trace of root 7
q matter, trace of silt 7
05—-] com
Tosh ff ee Ee 1
J becoming pale grey q
1.0 4
3 1.5 4
? 4 4
gs) | 1
5 | 20 4
g 4 4
3 4 4
25 4
2 30-4 = 4
3.54 4
4044 4
45-4 4
5.0 4
5.5 om
| 6.00 J
J END OF [email protected] m d
4 —e eH ee EES LJ iJ —-—4 a

 

 

 

 

 

 

 

 

GAP gINT FN. FO1b
RL2

 

 

Page 20

 

 

 

 

 

 

ULL PAGE_J.\2008\GEOTECHNICALI087682058\TECHNICAL_DOCIGINT\087682058BH GPJ GAPS_1.GDT 24/11/2008 1:34.37 PM

 

 

 

  
 

 

 

GAP5_1_MDORE GLB Fi

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Pease, REPORT OF BOREHOLE: BH 7
SHEET; 1 OF 1
CLIENT: CBD Settlers Cove COORDS: mE mN_ AMG66 DRILL RIG: Edson CP1
PROJECT: Geotechnical Investigation SURFACE RL: m DATUM: AHD DRILLER:
LOCATION: Lots 5-8, Serenity Cl, Settlers Cove INCLINATION: -90° LOGGED: PG DATE: 30/10/08
JOB NO: 087682058 HOLE DIA: mm HOLE DEPTH: 6.00 m CHECKED: DATE: (-/2-29
Drilling Sampling Field Material Description
Su a »
Eg w 3 ws a DCP TEST (AS1289.6.3.2)
Sez e| oe SAMPLER ele | SOIL / ROCK MATERIAL DESCRIPTION 5 \ee Blows per 100 mm
= 2a) =| ES | peor 8/S013 gl2Zl 5 5s
= [#2] $ | BE Pee 2153/3 2/88
0.0 TSP ]SAND
7 + fine to medium grained, grey and dark grey, trace of silt 7
-
too}! | pey poo |__| J
os 4 becoming pale grey 7
1.0 4
15 4
3
2 1 4
g
= 4 4
8 4 4
5
g 4 4
3 2.0—- 4
8 4 4
3 a
eT] 2 |
6 7 4
25 4
2 3.0 = ered out to 3.1m 4
3.56 4
404 4
45 4
4 Augered out to 5.3 m 4
50-4 ° 4
5.54
| 600 4
J END OF [email protected] m J
pioIettL_ J ~L Joa Lio i te ble
This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for
geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for
information only and do not necessarily indicate the presence or absence of soil or groundwater contamination. GAP gINT FN. Fore

 

 

Page 21

ORE.GLE FULL PAGE J:12008\GEOTECHNICALI087682058\TECHNICAL DOCIGINT\087682058BH.GPJ GAP5_1.GDT 24/71/2008 1:34:38 PM

GAPS_1_MD«

 

 

Peo: REPORT OF BOREHOLE: BH 8
es SHEET: 1 OF 1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CLIENT: CBD Settlers Cove COORDS: mE mN AMG66 DRILL RIG: Edson CP1
PROJECT: Geotechnical Investigation SURFACE RL: m DATUM: AHD DRILLER:
LOCATION: Lots 5-8, Serenity Cl, Settlers Cove INCLINATION: -90° LOGGED: PGH DATE: 30/10/08
JOB NO: 087682058 HOLE DIA: mm HOLE DEPTH: 6.00 m CHECKED: TAP DATE -/2-0%
Drilling Sampling Field Material Description
Su 2 =
Eg sampteor |Zlo |2 w |é DCP TEST (AS1289.6.3.2)
a |Z ~ w/o € Be Blows per 100
2 Be ae z FiEwDTest 8 i 5 SOIL / ROCK MATERIAL DESCRIPTION 2 a re mm ee
2 lee] $ | BE [OR #189] 8 2 [gee fT
0 SP | SAND
7 fine to medium grained, grey and dark grey, trace of silt 7
05 4
O60} eed Ld J
d becoming pale grey 4
1.04 on
154 4
3
8 4 4
| J 1
3 4 4
5 | 20-5 4
ff | 1
3 4 4
©
25-4 4
g 3.0 4
3.54 4
40 4
4544 4
5.0 a 4
5.5 4
‘| 6.00 J
J END OF [email protected] m q

 

 

 

 

 

 

 

 

 

This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for
geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for

information only and do not necessarily indicate the presence or absence of soil or groundwater contamination. GAP gINT FN. FO1b

RL2

 

 

Page 22

 

Biot.

CBD Settlers Cove

Geotechnical Investigation

REPORT OF BOREHOLE: BH 9

COORDS: mE mN AMG66
SURFACE RL: m DATUM: AHD

Lots 5-8, Serenity Cl, Settlers Cove INCLINATION: -90°

SHEET: 1 OF 1

DRILL RIG: Edson CP1

DRILLER:

LOGGED: PGH DATE: 30/10/08
CHECKED: TAS]? _ DATE: j-42-09

 

 

 

 

 

 

‘ULL PAGE _J:\2008\GEOTECHNICAL\087682058\TECHNICAL DOC\GINT\087682058BH GPJ GAPS_1.GDT 24/14/2008 7:34:39 PM

 

   

 

 

 

 

 

 

GAPS_1_MDOREGLB Fi

 

 

This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for
geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for
information only and do not necessarily indicate the presence or absence of soil or groundwater contamination.

 

 

 

 

 

087682058 HOLE DIA: mm HOLE DEPTH: 6.00 m
Sampling Field Material Description
bu a &
2 8 B 3 w |& DCP TEST (AS1289.6.3.2)
Slee w| og Save R wie 7 & SOIL / ROCK MATERIAL DESCRIPTION 8 [be Blows per 100 mm
= go| io | Es BiSolg Bi22 065 08
@ |DEPTI
2 ee S| ae Pa” 2|83/8 g isa
9.0 “| SP | SAND
fine to medium grained, grey and dark grey, trace of tree 7
roots 4
4 4
050} tee Pd J
becoming pale grey d
; 4
3 4
g
2 4
g 4
3 4
e 4
= 2 4
2 4
8
é 4
it to 3.0m 4
2 = 4
Augered out to 5.2 m 4
a 4
5}. 6.00 J
ne END OF [email protected] m
Pj Uo tb

 

 

 

 

 

 

 

 

GAP gINT FN. FO1b
RL2

 

 

Page 23

 

REPORT OF BOREHOLE: BH 10

SHEET: 1 OF 1

 

 

 

 

 

 

 

  
 

 

 

.MDORE.GLB FULL PAGE J\2008\GEOTECHNICALIOS7682058\TECHNICAL DOCIGINT\087682058BH.GPJ GAPS_1.GDT 24/71/2008 1:34:17 PM

GAPS_1

CLIENT: CBD Settlers Cove COORDS: mE mN AMG66 DRILL RIG: Edson CP1
PROJECT: Geotechnical Investigation SURFACE RL: m DATUM: AHD DRILLER:
LOCATION: Lots 5-8, Serenity Cl, Settlers Cove INCLINATION: -90° LOGGED: PGH DATE: 30/10/08
JOB NO: 087682058 HOLE DIA: mm HOLE DEPTH: 6.00 m cHecken: SE pate: (1209)
Drilling Sampling Field Material Description
z ° 3
23 a 3 w [2 DCP TEST (AS1289.6.3.2)
e\szl | io SAMPLEOR [wi2 | € SOIL / ROCK MATERIAL DESCRIPTION 5 ibe Blows per 100 mm
2 Ga) &| £8 FieoTest |a|z |@ 2 |e
Be l2K ag Oo} tao|o 5 |zz2
2 [es ee Pe #88) get _§ 8 § 2 2
0.0 TSP] SAND
7 5 fine to medium grained, grey and dark grey, trace of silt 7
7 0.50 7
0.8—| [becoming pale grey —=—=S=CS*~CS~CSCSsStS - 7
10-4 |_| J
_ | 184 4
g 4 J
s |
5 | 20 4
z) J |
3 4 4
oO
J 5 J
25 = 4
2 3.0 = 4
4 Augered out to 3.7 m 4
354 4
40 4
45 4
5.0—| ° 4
55 4
‘| 6.00 |
; | END OF [email protected] m 1
Jot abo i a | J_U _1__4 Lit _ Jt

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for

geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for

information only and do not necessarily indicate the presence or absence of soil or groundwater contamination.

 

 

 

 

GAP gINT FN. FO1b
RL2

 

 

Page 24

 

Piss:

REPORT OF BOREHOLE: BH 11

SHEET: 1 OF 1
DRILL RIG: Edson CP1

 

 

 

 

 

E.GLB FULL PAGE J\2008\GEOTECHNICAL\O87682058\TECHNICAL DOC\GINT\087682058BH GPJ GAPS_1.GDT 24/11/2008 1.34.18 PM

 

 

 

   

 

GAPS5_1_MDORI

 

 

 

 

 

 

This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for
geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for
information only and do not necessarily indicate the presence or absence of soil or groundwater contamination.

 

 

 

 

CLIENT: CBD Settlers Cove COORDS: mE mN AMG66
PROJECT: Geotechnical Investigation SURFACE RL: m DATUM: AHD DRILLER:
LOCATION: Lots 5-8, Serenity Cl, Settlers Cove INCLINATION: -90° LOGGED: PGH ) DATE: 30/10/08
JOB NO: 087682058 HOLE DIA: mm HOLE DEPTH: 6.00 m CHECKED: Ke DATEL 1 2-e%
Drilling Sampling Field Material Description
Su a j
Eg e 3 w lg DCP TEST (AS1289.6.3.2)
Sléflelaog Pitprest (SIE 1 & SOIL / ROCK MATERIAL DESCRIPTION alta Blows per 100 mm
Ege les 820/38 Bee 5
g ee) S| BE PR #/6S|3 gar of 2 8 2
60 ~]SP] SAND
7 | fine to medium grained, grey and dark grey, trace of silt 71
4
s 4
054 4
060) ee |_| d
J becoming pale grey d
4 4 4
1.0] t—} 4
15 4
a 4 4
2 4 4
2 4 4
5 | 204 4
& 1 4
el] | 2 1
=
25 +
2 3.04 = It to 3.0 In 4
3.5 4
4.05 on
45 4
4 ° 4
5.0 4
55 5
| 6.00 J
| END OF BOREHOLE @ 6,00 m d
pitoi-tL io jJ ~L doit Poet Lt LLL

 

 

 

 

 

 

 

 

 

GAP gINT FN. FO1b
RL2

 

 

Page 25

 

PF ecie. REPORT OF BOREHOLE: BH 12
SHEET: 1 OF 14

 

 

 

 

 

1/2008 1:34:19 PM

LL PAGE JA2008\GEOTECHNICALI08768205@\T ECHNICAL DOCIGINTI087682058BH.GPJ GAPS_1.GDT 24/1

 

 

      

 

GAPS_1_MDORE GiB FU!

 

CLIENT: CBD Settlers Cove COORDS: mE mN AMG66 DRILL RIG: Edson CP1
PROJECT: Geotechnical Investigation SURFACE RL: m DATUM: AHD DRILLER:
LOCATION: Lots 5-8, Serenity Cl, Settlers Cove INCLINATION: -90° LOGGED: PGH DATE: 30/10/08
JOB NO: 087682058 HOLE DIA: mm HOLE DEPTH: 6.00 m CHECKED: (2¢' _ DATE: 1-42-08
Drilling Sampling Field Material Description
Su 3 z
eg y 3 wiz DCP TEST (AS1289.6.3.2)
8lézl «| oe eevRLEOR ele |] & SOIL / ROCK MATERIAL DESCRIPTION > BE Blows per 100 mm
eegle| es 8/ze1 8 ae 0
2 yee) S| we Pam #/ 89/3 gigso 5 19 «15
9.0 TSP] SAND
71 fine to medium grained, grey and dark grey, trace of silt 1
054 4
060 fe pt 4
J becoming pale grey q
4 Ss 4
1.05 4
~ | 18 4
z 4 4
5 2.04 4 i”
5 4 4
a] | LI |
oO
25 4
g 3.0 s tt to 3.41 4
4 9 4
2
3.56 4
40 4
45 4
5.04 ° +
5.54 4
| 6.00 J
J END OF [email protected] |
PILL J LL ____4 Jott ee | Jot fbi

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for
geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for

information only and do not necessarily indicate the presence or absence of soil or groundwater contamination. GAP gINT FN. Fore

 

 

Page 26

LB _FULL PAGE J\2008\GEOTECHNICALIO87682058\TECHNICAL DOC\GINTW0876820583H.GPJ GAPS_1.GDT 24/11/2008 1:34:21 PM

GAPS_1_MDORE.G

 

 

PF citer, REPORT OF BOREHOLE: BH 13
es SHEET: 1 OF 1

 

 

 

 

 

 

 

 

 

CLIENT: CBD Settlers Cove COORDS: mE mN AMG66 DRILL RIG: Edson CP1
PROJECT: Geotechnical Investigation SURFACE RL: m DATUM: AHD DRILLER:
LOCATION: Lots 5-8, Serenity Ci, Settlers Cove INCLINATION: -90° LOGGED: PGH DATE: 30/10/08
JOB NO: 087682058 HOLE DIA: _mm_ HOLE DEPTH: 6.00m CHECKED: {>O(? DATE: (-72-2%
Drilling Sampling Fieid Material Description
Bu 2 &
23 g 3 wile DCP TEST (AS1289.6.3.2)
8 é fel xg PANPLE OR 8 g \5 SOIL / ROCK MATERIAL DESCRIPTION p (BE Blows per 100 mm
Flza/&| a8 Oo] sQ/0 222
g [e8] s | Be je 2/88 /8 giao ft
0.0 TSP] SAND
4 fine to medium grained, grey and dark grey, trace of tree 7
4 roots g 7
4 > 4
] 0.60. 1
08 [becoming pale grey ~=—S=~C*~CS*~CS~SsSCtiCStstStCSt«* [1 7
1.0 5 +
15 4
3 4 |_| 4
g 4 4
5 | 20 +
g] 4 |
z 1 J
25 4
| 9 |
=
2 3.0 = 4
35 -|
40-4 — 4
45— 4
5.0 a 4
55 4
1 6.00 . 4
a END OF [email protected] m |
pte to Le J LL a [Jeu t__4 -lL__H_

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

This report of borehole must be read in conjunction with accompanying notes and abbreviations. it has been prepared for
geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for

information only and do not necessarily indicate the presence or absence of soil or groundwater contamination. GAP gINT FN. FO1b

RL2

 

 

Page 27

ILL PAGE _J:\2008\GEOTECHNICALI087662058\TECHNICAL_DOC\GINTW876820S8BH.GPJ GAP5_1.GDT 24/11/2008 1:34:22 PM

GAPS_1_MDORE.GLB FUI

 

Pisses.

JOB NO: 087682058

CLIENT: CBD Settlers Cove
PROJECT: Geotechnical Investigation
LOCATION: Lots 5-8, Serenity Cl, Settlers Cove INCLINATION: -90°
HOLE DIA: _mm_ HOLE DEPTH: 6.00 m

REPORT OF BOREHOLE: BH 14

COORDS: mE mN AMGE66
SURFACE RL: m DATUM: AHD

SHEET: 1 OF 1
DRILL RIG: Edson CP1

DRILLER:

LOGGED: PGH _ DATE: 30/10/08
CHECKED: §245U"_ DATE: t-!2-0$

 

 

Drilling

Sampling

Field Material Description

 

PENETRATION
RESISTANCE

METHOD
WATER

DEPTH]
RL

©] DEPTH
1 (metres)

SAMPLE OR
FIELD TEST

RECOVERED
GRAPHIC
LOG

USC Symbol

SOIL / ROCK MATERIAL DESCRIPTION

DCP TEST (AS1289.6.3.2)
Blows per 100 mm

lo 5 10 15 20 25
tt it tt

CONSISTENCY

MOISTURE
DENSITY

 

 

°
a
|
Is
3

 

Groundwater not encountered
N
i

AD
»
Oo

|

6.00

 

|
=|

Sity SAND

fine to medium grained, dark grey, trace of tree roots

 

 

“| SP] SAND

fine to medium grained, pale grey

 

  

It to 3.1m +

 

 

 

 

 

 

 

4
— L —lL we J LE _
This report of borehole must be read in conjunction with accompanying notes and abbreviations. |t has been prepared for
geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for
information only and do not necessarily indicate the presence or absence of soi! or groundwater contamination.

 

 

 

END OF [email protected] m

 

 

 

 

 

a ee

 

 

 

 

GAP gINT FN. FO1b
RL2

 

 

Page 28

 

Peau: REPORT OF BOREHOLE: BH 15
SHEET: 1 OF 1

 

 

 

 

 

 

 

 

  

 

IDORE GLB FULL PAGE J\2008\GEOTECHNICALI087682058\TECHNICAL DOCIGINT\0876820588H GPJ GAPS_1.GDT 24/11/2008 1.34-23 PM

GAPS_1_M

 

 

 

 

 

 

 

 

 

 

 

 

 

 

This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for
geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for
information only and do not necessarily indicate the presence or absence of soil or groundwater contamination.

 

  

CLIENT: CBD Settlers Cove COORDS: mE mN AMG66 DRILL RIG: Edson CP1
PROJECT: Geeotechnical Investigation SURFACE RL: m DATUM: AHD DRILLER:
LOCATION: Lots 5-8, Serenity Cl, Settlers Cove INCLINATION: -90° LOGGED: PGH DATE: 30/10/08
JOB NO: 087682058 HOLE DIA: _mm_ HOLE DEPTH: 6.00 m CHECKED: s2§¥__ DATE: [12-08%
Drilling Sampling Field Material Description
z >
29 g 3 y 2 DCP TEST (AS1289.6.3.2)
8 ge g| 23 Be TEST g gié SOIL / ROCK MATERIAL DESCRIPTION > [Be Blows per 100 mm
EF lzao| ek) a8 Oo} solo 2 \z2
2 fe] § | BE [PRM B/ 88/8 gigge § eS
5.0 TSPTSAND
7 fine to medium grained, grey and dark grey, trace of silt a 7
4 s 4
‘| 040 || 1
0.5 — 4
0.60 |__| J
1.0 +
154 4
a 4 4
g
3 4 4
5 | 204 4
e| | ]
3 J 2 4
oO =
254 4
2 3.0 s gered out to 3.1m 4
35 an
404 |_| 4
45 4
5.0 a 4
5.54 om
| 6.00 a
END OF [email protected] m d
| |} Ly i ttt LJ tot LLL

 

 

 

GAP gINT FN. FO1b
RL2

 

 

Page 29

 

Pou.
CBD Settlers Cove
Geotechnical Investigation

REPORT OF BOREHOLE: BH 16

SHEET: 1 OF 1

 

 

 

PENETRATION
RESISTANCE
WATER
RECOVERED
GRAPHIC

LOG
USC Symbol

METHOD

 

 

©] DEPTH
©] (metres)

a
u

 

Groundwater not encountered

AD

L PAGE Ji2008\GEOTECHNICALIOS7682058\TECHNICAL DOCIGINTIG876820S88H.GPJ GAPS_1.GDT 24/11/2008 1.34:24 PM

 

   

 

 

 

 

 

 

 

 

 

 

This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for
geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for
information only and do not necessarily indicate the presence or absence of soil or groundwater contamination.

GAPS_*_MDORE.GLB FULL

 

COORDS: mE mN AMG66 DRILL RIG: Edson CP14
SURFACE RL: m DATUM: AHD DRILLER:
Lots 5-8, Serenity Cl, Settlers Cove INCLINATION: -90° LOGGED: PGH DATE: 30/10/08
HOLE DIA: mm _ HOLE DEPTH: 6.00m CHECKED: ru DATE: (-(2-°9F
Field Material Description
>
w 2 DCP TEST (AS1289.6.3.2)
SOIL / ROCK MATERIAL DESCRIPTION > lor Blows per 100 mm
2
8 Zao 5 10 15 20 26
2 joa an)
fine to medium grained, grey and dark grey, trace of silt 7
[becomingpalegrey == | _ 1
a ]
=
— gered out to 3.1m 4
= 4
a 4
END OF [email protected] y

 

 

 

 

 

 

 

 

 

GAP gINT FN. FO1b
RL2

 

 

Page 30

REGLB FULL PAGE J\2008\GEOTECHNICALIOB7682058TECHNICAL DOCIGINT\087682058BH.GPJ GAPS_1.GDT 24/11/2008 1:34:26 PM.

GAPS_1_MDO}

 

 

 

 

 

 

 

 

 

      

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SHEET: 1 OF 1
CLIENT: CBD Settlers Cove COORDS: mE mN_ AMG66 DRILL RIG: Edson CP1
PROJECT: Geotechnical investigation SURFACE RL: m DATUM: AHD DRILLER:
LOCATION: Lots 5-8, Serenity Cl, Settlers Cove INCLINATION: -90° LOGGED: PGH DATE: 31/10/08
JOB NO: 087682058 HOLE DIA: mm _ HOLE DEPTH: 6.00m CHECKED: 6t DATE: (-12-%
Drilling Sampling Field Material Description
Sw 3 &
2 Q wy 3 wy a DCP TEST (AS1289.6.3.2)
Sléz| «| se roe «(8S 1s SOIL / ROCK MATERIAL DESCRIPTION Sloe Blows per 100 mm
E eal | 88 loco 8/82] 8 S\2z7 6 0 1% 20 2%
3 He] S| 36 [oR zjoS|3 gjss. 2 PO
0.0 *| SP | SAND
1 . fine to medium grained, grey and dark grey, trace of root 7
7 matter 4
Tos |] ep EP J
o6 4 becoming pale grey 4
4 3 4
1.04 4
1.5 om
3 4 | 4
g
= 4 4
8 4 an 4
5
3 4 4
3 | 207] |— a”
& 4 4
38
& 4 4
25-4 4
4 o 4
2 3.04 z/= gered out to 3.1 4
3.5
40-4 4
454 4
504 ° 4
5.5 a
| 6.00 ole J
° J END OF [email protected] m d
J joi-L. J -L-_____4/ Jette eee | Jot tLe
This report of borehole must be read in conjunction with accompanying notes and abbreviations. it has been prepared for
geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for
information only and do not necessarily indicate the presence or absence of scil or groundwater contamination. GAP giNT FN. Forte

 

 

Page 31

 

PF ccter REPORT OF BOREHOLE: BH 18
es SHEET: 1 OF 1

 

 

 

 

 

 

 

 

 

 

|MOORE.GLB FULL PAGE J:\2008&\GEOTECHNICALI087682058ITECHNICAL DOCIGINT\087682058BH GPJ GAPS_4.GDT 24/11/2008 1:34.27 PM

GAPS_1

 

CLIENT: CBD Settlers Cove COORDS: mE mN_ AMG66 DRILL RIG: Edson CP1
PROJECT: Geotechnical Investigation SURFACE RL: m DATUM: AHD ORILLER:
LOCATION: Lots 5-8, Serenity Cl, Settlers Cove INCLINATION: -90° LOGGED: PGH DATE: 31/10/08
JOB NO: 087682058 HOLE DIA: mm_ HOLE DEPTH: 6.00m CHECKED: CY DATE: (4z-04
Drilling Sampling Field Material Description
Sw 9 3
Eg 2 3 wiz DCP TEST (AS1289.6.3.2)
8 ee «| xe BANPLE OR were SOIL / ROCK MATERIAL DESCRIPTION > |= Blows per 100 mm
= |bo| a! Zs ole |e & loa
G28) =| &® loser Gl 28/38 3 1650 5 10 15 20 25
3 lac] S| o£] Re Zj}oS| 5 3 joo
0.0 “| SP | SAND
7 | fine to medium grained, grey and dark grey, trace of silt 7
J > J
jos) | eee EP |_| 4
05 d becoming paie grey q
10-4 4
4 4 4
1.56 4
8 4 4
2 ] 4
= 2.0 | 4
3 1 a
g 4 4
oO
25-4 4
4 > 1
7 3
2 3.04 = 4
3.5 4
40—- 4
454 a
4 oO 4
5.0 4
5.5 4
9_| 600 2
w J END OF [email protected] m |
ptJe-LotLe 4s ~Lo~_-_—-—-l a a pI Uo 4 bb

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for
geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for

information only and do not necessarily indicate the presence or absence of soil or groundwater contamination. GAP giNT FN. FO1b

RL2

 

 

Page 32

GLB FULL PAGE JA2008IGEOTECHNICALW87682058\TECHNICAL DOCIGINT\087682058BH.GPJ GAPS_1.GDT 24/17/2008 1:34:28 PM

GAPS_1_MDORE.

 

 

 

 

 

 

 

 

 

 

   
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SHEET: 1 OF 4
CLIENT: CBD Settlers Cove COORDS: mE mN AMG66 DRILL RIG: Edson CP1
PROJECT: Geotechnical Investigation SURFACE RL: m DATUM: AHD DRILLER:
LOCATION: Lots 5-8, Serenity Cl, Settlers Cove INCLINATION: -90° LOGGED: PGH DATE: 31/10/08
JOB NO: 087682058 HOLE DIA: mm HOLE DEPTH: 6.00 m CHECKED: DATE: (-(2 --¥
Drilling Sampling Field Material Description
Zz >
23 a 3 y 2 DCP TEST (AS1289.6.3.2)
Slefle| xz SaMPLrOR jgl2 7 & SOIL / ROCK MATERIAL DESCRIPTION 5 [be Blows per 100 mm
E leg) | as DEPTH 8/32 3 8 |22lo 5 10 15 20-28
3 [Be] S| BE [Pre =|82| 8 2 [sah
90 SP} SAND
7 fine to medium grained, grey and dark grey, trace of sift 1
of ee P > J
J becoming grey J
0.50 |
057 [becoming pala gray SCS I 1
1.0 on
4 “ 4
15 4
3 4 4
s
= 4 | 4
8 4 4
&
z 4 4
3 2.0 7
s 4 4
5
2 4 4
oO
254 4
4 a 4
4 = 4
2 3.044 = Augered out to 3.0 in 4
3.54 4
4.0 4
45 4
4 a 4
5.0 4
5.5 4
| 6.00 J
J END OF [email protected] m 4
pete t—t J Li ——-H Jolt EE Pio Ud LL
This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for
geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for
information only and do not necessarily indicate the presence or absence of soil or groundwater contamination. GAP gINT FN. re

 

 

Page 33

E.GLB FULL PAGE J\2008\GEOTECHNICAL\O87682058\TECHNICAL DOCIGINT\087682058BH GPJ GAPS_1.GDT 24/11/2008 1.34.30 PM

 

PFiccise , REPORT OF BOREHOLE: BH 20
es SHEET: 1 OF 1

 

 

 

 

 

 

 

    

 

GAPS_1_MDOR

 

   

CLIENT: CBD Settlers Cove COORDS: mE mN AMG66 DRILL RIG: Edson CP1
PROJECT: Geotechnical Investigation SURFACE RL: m DATUM: AHD DRILLER:
LOCATION: Lots 5-8, Serenity Cl, Settiers Cove INCLINATION: -90° LOGGED: PGH DATE: 31/10/08
JOB NO: 087682058 HOLE DIA: mm HOLE DEPTH: 6.00 m CHECKED: BP DATE: i-(2-0&
Drilling Sampling Field Material Description
Sw a 3
EQ SAMPLE OR wy © 3 wy 2 DCP TEST (AS1289.6.3.2)
a |sZ = wie & a> Blows per 100 mm
g Bo & z 8 FIELD TEST 3 Eo a SOIL/ ROCK MATERIAL DESCRIPTION 5 a5 ; ; 0 ‘s - -
2 [ee S| ae Pe” 2/59] 3 2 [88
0.0 SP] SAND
1 fine to medium grained, grey and dark grey, trace of silt 7
| 3 |
052.50. Pod |__| |
J becoming pale grey J
1.0-4 4
4 4 4
15 4
g 4 4
a} | |
5
3 4 —_ 4
5 | 20-4 4
8 4 4
3 J 4
6
254 4
4 a 4
a 3.0 s/= ered out to 3.1m |
3.5 4
40 4
454 4
5.04 4
5.54 4
|| 6.00 4
END OF [email protected] m d
J Joi Lo} -L-_____ 4d ne Lt oof bb

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for
geotechnical purposes only, without attempt to assess possible contamination. Any references to potential contamination are for

information only and do not necessarily indicate the presence or absence of soil or groundwater contamination. GAP giNT FN. FO1b

RL2

 

 

Page 34

 

 

EXPLANATION OF NOTES, ABBREVIATIONS & TERMS

Bicou USED ON BOREHOLE AND TEST PIT REPORTS

DRILLING/EXCAVATION METHOD

 

HQ Diamond Core - 63 mm

AS* Auger Screwing RD Rotary blade or drag bit

AD* Auger Drilling RT Rotary Tricone bit NMLC Diamond Core - 52 mm

"vv V-Bit RAB __ Rotary Air Blast NQ Diamond Core - 47 mm

‘T TC-Bit, e.g. ADT RC Reverse Circulation BH Tractor Mounted Backhoe
HA Hand Auger PT Push Tube EX Tracked Hydraulic Excavator
ADH Hollow Auger CT Cable Tool Rig EE Existing Excavation

DTC Diatube Coring JET Jetting HAND Excavated by Hand Methods
WB Washbore or Bailer NDD  Non-destructive drilling

 

PENETRATION/EXCAVATION RESISTANCE
L Low resistance. Rapid penetration possible with little effort from the equipment used.
M Medium resistance. Excavation/possible at an acceptable rate with moderate effort from the equipment used.
H High resistance to penetration/excavation. Further penetration is possible at a slow rate and requires
significant effort from the equipment.
R Refusal or Practical Refusal. No further progress possible without the risk of damage or unacceptable wear to
the digging implement or machine.

These assessments are subjective and are dependent on many factors including the equipment power, weight, condition
of excavation or drilling tools, and the experience of the operator.

 

WATER
Ww Water level at date shown <J Partial water loss
Cc Water inflow <4 Complete water loss
GROUNDWATER NOT The observation of groundwater, whether present or not, was not possible due to drilling
OBSERVED water, surface seepage or cave in of the borehole/test pit.
GROUNDWATER NOT The borehole/test pit was dry soon after excavation. However, groundwater could be
ENCOUNTERED present in less permeable strata. Inflow may have been observed had the borehole/test pit

been left open for a longer period.

 

SAMPLING AND TESTING

 

 

 

 

 

 

SPT Standard Penetration Test to AS1289.6.3.1-1993

4,7,11 N=18 4,7,11 = Blows per 150mm. _N = Blows per 300mm penetration following 150mm seating

30/80mm Where practical refusal occurs, the blows and penetration for that interval are reported

RW Penetration occurred under the rod weight only

HW Penetration occurred under the hammer and rod weight only

HB Hammer double bouncing on anvil

DS Disturbed sample

BDS Bulk disturbed sample

G Gas Sample

Ww Water Sample

FP Field permeability test over section noted

FV Field vane shear test expressed as uncorrected shear strength (sy = peak value, s, = residual value)

PID Photoionisation Detector reading in ppm

PM Pressuremeter test over section noted

PP Pocket penetrometer test expressed as instrument reading in kPa

U63 Thin walied tube sample - number indicates nominal sample diameter in millimetres

WPT Water pressure tests

Ranking of Visually Observable Contamination and Odour (for specific soil contamination assessment projects)
R=0 No visible evidence of contamination R=A No non-natural odours identified
R=1 Slight evidence of visible contamination R=B Slight non-natural odours identified
R=2 Visible contamination R=C Moderate non-natura! odours identified
R=3 Significant visible contamination R=D Strong non-natural odours identified

ROCK CORE RECOVERY

TCR = Total Core Recovery (%) SCR = Solid Core Recovery (%) RQD = Rock Quality Designation (%)

_ SAxial lengths of core > 100mm «
- Length of core run

_ Length of core recovered «100 - > Length of cylindrical core recovered x 100

Length of core run Length of core run

100

 

 

GAP Form No. 6
RLS

Page 35

 

METHOD OF SOIL DESCRIPTION
USED ON BOREHOLE AND TEST PIT REPORTS

Crom.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FILL ~~~] CLAY (CL, Cl or CH)
Pose] GRAVEL (GP or GW) *“ 34 ORGANIC SOILS (OL or OH or Pt)
96 %d ty vy
Pose pC
v.| SAND (SP or SW) SU COBBLES or BOULDERS
° te
Pe * x1 SILT (ML or MH)

Combinations of these basic symbols may be used to indicate mixed materials such as sandy clay.

 

CLASSIFICATION AND INFERRED STRATIGRAPHY
Soil and Rock is classified and described in Reports of Boreholes and Test Pits using the preferred method given in
AS1726 — 1993, Appendix A. The material properties are assessed in the field by visual/tactile methods.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Particle Size Plasticity Properties
Major Division | Sub Division Particle Size 40
BOULDERS > 200 mm cH
cl High plasticity
COBBLES 63 to 200 mm 30 Low Sty Modan clay
Coarse 20 to 63 mm = oley clay
4
GRAVEL Medium 6.0 to 20mm 3
- = 20 OH or MH,
Fine 2.0 to 6.0 mm 2 High liquid limit
Coarse 0.6 to 2.0 mm 3 “
SAND Medium 0.2 to0.6mm a 10 | cit
q CLUML Clay/Silt limit sitt
Fine 0.075 to 0.2 mm OL it iow teas mit sitt
SILT 0.002 to 0.075 mm 9
0 10 20 30 40 50 60 70 80
CLAY < 0.002 mm Liquid Limit (%)
MOISTURE CONDITION AS1726 - 1993
Symbol Term Description
D Dry Sands and gravels are free flowing. Clays & Silts may be brittle or friable and powdery.
M Moist Soils are darker than in the dry condition & may feel cool. Sands and gravels tend to cohere.
WwW Wet Soils exude free water. Sands and gravels tend to cohere.
CONSISTENCY AND DENSITY AS1726 - 1993
Symbol Term Undrained Shear Symbol Term Density Index % SPT “N’ #
Strength
vs Very Soft 0 to 12 kPa VL Very Loose Less than 15 Oto4
$s Soft 12 to 25 kPa L Loose 15 to 35 4 to 10
F Firm 25 to 50 kPa MD Medium Dense 35 to 65 10 to 30
St Stiff 50 to 100 kPa D Dense 65 to 85 30 to 50
vst Very Stiff 100 to 200 kPa VD Very Dense Above 85 Above 50
H Hard Above 200 kPa

 

the material.

In the absence of test results, consistency and density may be assessed from correlations with the observed behaviour of

# SPT correlations are not stated in AS1726 — 1993, and may be subject to corrections for overburden pressure and
equipment type.

 

 

 

GAP Form No. 5
RL7

Page 36

                                 LOTS 5 TO 8, SETTLERS COVE, SERENITY CLOSE, NOOSA




APPENDIX B
Limitations




December 2008
Report No. 087682058 002 Rev.1

Page 37

  
 

Golder

L/ Associates

 

LIMITATIONS

This Document has been provided by Golder Associates Pty Ltd (“Golder”) subject to
the following limitations:

This Document has been prepared for the particular purpose outlined in Golder’s
proposal and no responsibility is accepted for the use of this Document, in whole or in
part, in other contexts or for any other purpose.

The scope and the period of Golder’s Services are as described in Golder’s proposal, and
are subject to restrictions and limitations. Golder did not perform a complete
assessment of all possible conditions or circumstances that may exist at the site
referenced in the Document. Ifa service is not expressly indicated, do not assume it has
been provided. If a matter is not addressed, do not assume that any determination has

been made by Golder in regards to it. ‘

Conditions may exist which were undetectable given the limited nature of the enquiry
Golder was retained to undertake with respect to the site. Variations in conditions may
occur between investigatory locations, and there may be special conditions pertaining to
the site which have not been revealed by the investigation and which have not therefore
been taken into account in the Document. Accordingly, additional studies and actions

may be required.

In addition, it is recognised that the passage of time affects the information and
assessment provided in this Document. Golder’s opinions are based upon information
that existed at the time of the production of the Document. It is understood that the
Services provided allowed Golder to form no more than an opinion of the actual
conditions of the site at the time the site was visited’and cannot be used to assess the
effect of any subsequent changes in the quality of the site, or its surroundings, or any

laws or regulations.

Any assessments made in this Document are based on the conditions indicated from
published sources and the investigation described. No warranty is included, either
express or implied, that the actual conditions will conform exactly to the assessments

contained in this Document.

Where data supplied by the client or other external sources, including previous site
investigation data, have been used, it has been assumed that the information is correct
unless otherwise stated. No responsibility is accepted by Golder for incomplete or
inaccurate data supplied by others.

Golder may have retained subconsultants affiliated with Golder to provide Services for
the benefit of Golder. To the maximum extent allowed by law, the Client acknowledges
and agrees it will not have any direct legal recourse to, and waives any claim, demand,
or cause of action against, Golder’s affiliated companies, and their employees, officers

and directors.

This Document is provided for sole use by the Client and is confidential to it and its
professional advisers. No responsibility whatsoever for the contents of this Document
will be accepted to any person other than the Client. Any use which a third party makes
of this Document, or any reliance on or decisions to be made based on it, is the
responsibility of such third parties. Golder accepts no responsibility for damages, if any,
suffered by any third party as a result of decisions made or actions based on this

Document.

Golder Associates GAP Form No, LEGO4
RLI

Page 38

Golder Associates Pty Ltd
55 Kingsford Smith Parade
Maroochydore Queensland 4558
Australia
T: +61 7 5475 5900

Used in these records

About this file

File size
15.5 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

081128 - Lots 5 - 8 Soil Tests.pdf · 15.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.