Council archive · source document
081128 - Lots 5 - 8 Soil Tests · OPW18/0155
Attached to the e-mail Operational Works Application - Geotechnical Report.msg.
Very large file (15.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Information contained on this drawing is the copyright of Golder Associates Pty Ltd. Unauthorised use or reproduction of this plan either wholly or in part without written permission infringes copyright . © Golder Associates Pty Ltd.
8m 40 m maximum
minimum
Basement
Wo De
rst ns
C ase e Ve
–A g
ngl eta
eo tio
fR n
epo
se
27º
35º
CLIENT PROJECT
CBD Settlers Cove Pty Ltd Lots 5 to 8, Serenity Close
DRAWN DATE TITLE
DJP 28/11/08 TYPICAL SECTION THROUGH
CHECKED DATE
SAND DUNE FACE
SCALE PROJECT No FIGURE No
1:400 A4 087682058 2
J:\2006\Geotechnical\06682026\TASK_1000\03_FIGURES_DRAWINGS\Fig02.ppt
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
081128 - Lots 5 - 8 Soil Tests.pdfRelated documentApplication case desk ↗
About this file
- File size
- 15.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.