EXPLANATION OF NOTES, ABBREVIATIONS & TERMS

Bicou USED ON BOREHOLE AND TEST PIT REPORTS

DRILLING/EXCAVATION METHOD

 

HQ Diamond Core - 63 mm

AS* Auger Screwing RD Rotary blade or drag bit

AD* Auger Drilling RT Rotary Tricone bit NMLC Diamond Core - 52 mm

"vv V-Bit RAB __ Rotary Air Blast NQ Diamond Core - 47 mm

‘T TC-Bit, e.g. ADT RC Reverse Circulation BH Tractor Mounted Backhoe
HA Hand Auger PT Push Tube EX Tracked Hydraulic Excavator
ADH Hollow Auger CT Cable Tool Rig EE Existing Excavation

DTC Diatube Coring JET Jetting HAND Excavated by Hand Methods
WB Washbore or Bailer NDD  Non-destructive drilling

 

PENETRATION/EXCAVATION RESISTANCE
L Low resistance. Rapid penetration possible with little effort from the equipment used.
M Medium resistance. Excavation/possible at an acceptable rate with moderate effort from the equipment used.
H High resistance to penetration/excavation. Further penetration is possible at a slow rate and requires
significant effort from the equipment.
R Refusal or Practical Refusal. No further progress possible without the risk of damage or unacceptable wear to
the digging implement or machine.

These assessments are subjective and are dependent on many factors including the equipment power, weight, condition
of excavation or drilling tools, and the experience of the operator.

 

WATER
Ww Water level at date shown <J Partial water loss
Cc Water inflow <4 Complete water loss
GROUNDWATER NOT The observation of groundwater, whether present or not, was not possible due to drilling
OBSERVED water, surface seepage or cave in of the borehole/test pit.
GROUNDWATER NOT The borehole/test pit was dry soon after excavation. However, groundwater could be
ENCOUNTERED present in less permeable strata. Inflow may have been observed had the borehole/test pit

been left open for a longer period.

 

SAMPLING AND TESTING

 

 

 

 

 

 

SPT Standard Penetration Test to AS1289.6.3.1-1993

4,7,11 N=18 4,7,11 = Blows per 150mm. _N = Blows per 300mm penetration following 150mm seating

30/80mm Where practical refusal occurs, the blows and penetration for that interval are reported

RW Penetration occurred under the rod weight only

HW Penetration occurred under the hammer and rod weight only

HB Hammer double bouncing on anvil

DS Disturbed sample

BDS Bulk disturbed sample

G Gas Sample

Ww Water Sample

FP Field permeability test over section noted

FV Field vane shear test expressed as uncorrected shear strength (sy = peak value, s, = residual value)

PID Photoionisation Detector reading in ppm

PM Pressuremeter test over section noted

PP Pocket penetrometer test expressed as instrument reading in kPa

U63 Thin walied tube sample - number indicates nominal sample diameter in millimetres

WPT Water pressure tests

Ranking of Visually Observable Contamination and Odour (for specific soil contamination assessment projects)
R=0 No visible evidence of contamination R=A No non-natural odours identified
R=1 Slight evidence of visible contamination R=B Slight non-natural odours identified
R=2 Visible contamination R=C Moderate non-natura! odours identified
R=3 Significant visible contamination R=D Strong non-natural odours identified

ROCK CORE RECOVERY

TCR = Total Core Recovery (%) SCR = Solid Core Recovery (%) RQD = Rock Quality Designation (%)

_ SAxial lengths of core > 100mm «
- Length of core run

_ Length of core recovered «100 - > Length of cylindrical core recovered x 100

Length of core run Length of core run

100

 

 

GAP Form No. 6
RLS

Used in these records

About this file

File size
15.5 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

081128 - Lots 5 - 8 Soil Tests.pdf · 15.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.