Skip to the record
Every meeting, every word.

Council archive · source document

J Acoustic Report · 132007.2398

Attached to the e-mail 132007.2398.02 Request to change existing approval (3 of 3) - Traffic Impact & Acoustic reports.

of 54

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

FILE: BI4158.W-SKOL.dwg DATE: 29-09-2014 TIME: 14:51
Xref's: X_B16158.W_BASE X_BI4t5 E X_B1MI58.W_AERIALS USR: Jake Wikinson

@4zmE0zmE>

IME: 1651

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PROJECT No.

B14158.W

-

COOROY CONNECTION ROAD) ~

NCEPT PLAN ONI

NOT TO BE USED FOR TOTAL OF 164 LOTS

CONSTRUCTION PURPOSES

“ er
BROWN -—=> FE

‘ANDREW McPHAIL RPEQ 6921 PALM LAKES - COORORY . Brown Consulting (QLD) Pty Lid ey
MATTHEW HILL RPEQ 11578 RETIRMENT VILLAGE Smart Consulting tal She Sah ore HD Anta 1

FOR & ON BEHALF OF BROWN CONSULTING (QLD) PTY LTD. Bashaw Caber Usbomna nin Shopom SemineCoat — Lb64

SITE BOUNDARY

PROPOSED FLOW PATH
WETLAND

GREENSPACE
260m? LOT
(13m x 20m)

270m? LOT
(13.5 x 20m)

LARGE LOT
(13.5m x 26-30m)

VISITOR PARKING

PALM LAKES
CONCEPT LAYOUT PLAN

 

Used in these records

About this file

File size
7.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

J ACOUSTIC REPORT.PDF · 7.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.