                                             Officer:          Daniel Smith
                                             Direct Telephone: (07) 5449 5106
                                             Response Address: PO Box 141, Tewantin QLD 4565
                                             Email:            [email protected]
                                             Our Reference:    2007/2174
                                             Your Reference:   00868 LO2 NG
15 May 2008

Oak Investment Holdings Pty Ltd
CARE Martoo Consulting Pty Ltd
PO Box 1684
NOOSA HEADS QLD 4567




Dear Sir/Madam

                                      Decision Notice
                                  Integrated Planning Act 1997

I refer to your application and advise that on 15 May 2008 Council decided to approve the application
in full subject to conditions.
Details of the decision are as follows:

1     APPLICATION DETAILS

 Application No:                     2007/2174
 Street address:                     43 & 45 Elanda Street, Sunshine Beach
 Real property description:          Lot 399 RP 48112 & Lot 400 RP 48112
 Planning Scheme:                    The Noosa Plan

2     DECISION DETAILS
The following type of approval has been issued:
    Development Permit for Material Change of Use - Multiple Housing Type 4 - Conventional (5
      Units)

3     RELEVANT PERIOD OF APPROVAL

The relevant period for this Development Permit is 4 years from the date that this development
approval takes effect.

4     ASSESSMENT MANAGER CONDITIONS

Land Use
1.    Development undertaken in accordance with this approval must generally comply with the
      approved plans of development. The approved plans are:
       Plan         /      Rev.    Plan / Document Name                         Date
       Document No.
       0710SD.01           A       Roof Plan – Ian Gorton Design                Aug 2007


                                                                                                Page 1 of 15
Full text of the other 14 pages

Page 2

                                                -2-



     0710SD.02           A       Level 3 Floor Plan – Ian Gorton Design      Aug 2007
     0710SD.03           A       Level 2 Floor Plan – Ian Gorton Design      Aug 2007
     0710SD.04           A       Level 1 Floor Plan – Ian Gorton Design      Aug 2007
     0710SD.05           A       Sub Floor Plan – Ian Gorton Design          Aug 2007
     0710SD.06           A       Elevations Sheet 1 – Ian Gorton Design      Aug 2007
     0710SD.07           A       Cross Sections – Ian Gorton Design          Aug 2007

     and as may be amended by these conditions.
2.   The development must be undertaken and operated in a manner that causes no detrimental
     effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
     lighting nuisance or other emissions.
3.   The building shall not exceed 12m in height above natural and finished ground level.
4.   All fencing shall be setback at least 1 metre from the front property boundary, with at least half
     of the fencing setback 2 metres. The area of land between the fence and the front property
     boundary shall be densely landscaped to screen any fencing from the street.
5.   The open space and setback areas are to be landscaped in accordance with Council’s Policy
     on Landscaping Guidelines and a properly prepared landscape plan prepared by a suitably
     qualified Landscape Architect or Horticulturalist. Such landscaping is to be completed prior to
     the premises being occupied and maintained at all times thereafter.
6.   Existing trees on the site and within road reserves are to be retained, except where required to
     be removed due to building operations or the conduct of the approved use. These landscape
     plans required to be submitted are to denote areas of existing vegetation or existing trees
     proposed or required to be retained.
7.   Cleared vegetation is to be suitably processed by one of the following methods and removed
     from the site:-
     7.1.   Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
            loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a
            minimum of 10 metres between edges of heaps.
     7.2.   Disposal for firewood.
     7.3.   Disposal for landscaping purposes.
     7.4.   Transport to alternative site for breaking down materials provided that all necessary
            permits have been obtained to allow the alternate site to be used for this purpose.
     7.5.   The disposal method for clearing works is to be submitted in conjunction with an
            application for a Development Permit for Operational Work. The Applicant is advised
            that other methods may be considered provided full details of the method are
            submitted.
     7.6.   The Applicant is advised that burning off is an unacceptable method of disposal.
8.   All hot water systems installed shall be either solar systems; electric heat pump systems; or
     gas systems (LPG or natural).
9.   Any deck or balcony areas are not to be enclosed with shutters, glass panelling or the like,
     thus remaining as open structures.




                                                                                            Page 2 of 15

Page 3

                                                 -3-



10.   The proposed development shall have all kitchen, laundry and bathroom fittings that comply
      with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water
      Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and
      Drainage Standard Part 1.2), with toilets to comply with the AAAA Water Conservation Rating
      System. All tap ware and shower roses shall not exceed a maximum flow of 9 litres per min.
      Dishwashers and washing machines are excluded from this requirement.
11.   Security in the form of a cash bond or trading bank guarantee to the sum of $10 000 must be
      submitted, to secure performance of all conditions of this approval, prior to the issue of a
      Development Permit for operational works. The cash bond or trading bank guarantee will be
      returned on performance of the conditions of approval less any costs incurred by Council in
      respect of enforcing performance of this permit.
12.   The requirements of this development approval are to be effected, prior to the use of the
      premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
      this approval to effect compliance with conditions.
13.   The developer must obtain all of the other Development Permits referred to in the Decision
      Notice, prior to obtaining a Development Permit for Building Works.
Land Development

Lot Amalgamation
14.   All separate, adjoining lots that form part of this application shall be amalgamated into one
      undivided allotment in accordance with Section 3.7.3 of the Integrated Planning Act and the
      Plan of Survey submitted for registration at the Land Titles Office. Proof of title being issued
      for the amalgamated lot shall be submitted to Council prior to the issue of the Development
      Permit for Operational Works.
Vehicle Access
15.   A vehicular access driveway to serve the proposed building shall be constructed from the
      Elanda Street frontage of the site with a width of 5.5m for the first 6 metres from the kerb line.
16.   The driveway shall be designed and constructed to Council’s design standards and to grades
      that prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians
      movements along the footpath without any step or level difference. Should any driveways be
      constructed to grades that do not comply with AS/NZS 2890.1-2004, Council will require that
      the driveway be removed and reconstructed to levels that do comply.
      Please note, a step between the driveway and the footpath shall be avoided, as it is preferred
      to have the footpath continue at a constant grade to minimise the potential for pedestrians to
      trip or fall.
17.   To ensure pedestrian safety between vehicles exiting the site and pedestrians on the footpath,
      the driveway and any associated fencing or vegetation near the driveway shall comply with the
      minimum sight line requirements as defined in AS 2890.1, section 3.2.4. The applicant shall
      demonstrate compliance by illustrating these sight lines on the plans submitted for both
      Operational Works approval and Building Works approval.
Car Parking
18.   Carparking shall be provided within the site generally as shown on drawing number
      0710SD.04 (A) dated August 2007 by Ian Gorton Design, except as modified herein.
19.   A minimum of 8 car park spaces shall be provided on site.
20.   A turning area shall be provided, in lieu of the uncovered visitor carpark space, or by
      lengthening the uncovered visitor car park, to provide additional area for car turning to allow
      vehicles to turn around and leave the site in a forward gear when the carpark is full.


                                                                                             Page 3 of 15

Page 4

                                                -4-



21.   The carparking area shall be designed to comply with the provisions of AS/NZS 2890.1-2004
      for user class 1A with allowance for vehicles to enter and leave the site in a forward gear and
      with a minimum head clearance (headroom) at any point of 2.2m.
Vegetation Protection & Preservation
22.   Where retained trees are located in areas proposed to be filled on site (or are located on
      neighbouring allotments to the actual site to be filled), there will be a need to prevent fill
      material from being placed on the trees root system. To this end the design of the filling works
      will need to incorporate terracing around the tree or a similar means of ensuring that the
      natural ground level around the trees remains generally the same as existing. These
      measures shall clearly be shown on the plans submitted for Operational Works approval and
      any drainage required to drain these areas shall also be shown on the plans.
Roadworks Widening
23.   The full length of the Elanda Street frontage of the development site shall be upgraded by
      providing kerb & channel to be consistent with and match smoothly with the adjoining sections
      of kerb and channel, bitumen road widening and landscaping improvements to the footpath.
      All associated and ancillary work including any pavement correction to the existing pavement,
      drainage works, modification of the footpath, and adjustments to the existing infrastructure
      shall be undertaken to complete the roadworks widening.
      In this regard a schedule of works, specifications and plans detailing this work shall be
      prepared and submitted to Council for approval prior to obtaining a Development Permit for
      Operational Works.

Frontage Works
24.   Footpath improvements such as topsoiling, grassing, and tree planting are required to the
      Elanda Street frontage of the site in accordance with Planning Scheme Policy PSP03
      Landscaping Plants & Guidelines. Grass shall be couch, free of weeds.
25.   A new 1.5m wide concrete path shall be constructed along the frontage of the site in
      accordance with Council’s design standards and with an alignment that protects any
      significant vegetation or any underground services and match smoothly with adjoining paths. A
      Development Permit for Operational Works shall be required.
26.   All paths, driveways and parking areas shall be designed and constructed to ensure
      pedestrian safety using non-slip materials, to produce an evenly graded surface finish, and to
      be in accordance with the Disability Discrimination Act 1992 and Australian Standard 1428.1
      Design for Access & Mobility.
Roof Water & Stormwater Drainage
27.   The stormwater disposal from the site shall be generally in accordance with the Stormwater
      Quantity Management Plan dated January 2008 reference AA07731SMP by Duke
      Environmental.
28.   Roof runoff from any new building shall be directed to a rainwater storage system or tank
      (minimum storage 3000 litres per attached dwelling unit) that is installed to ensure water from
      the tank is used for external uses (such as watering gardens, irrigation, ornamental ponds,
      water features, topping-up swimming pools, outdoor cleaning, etc) and for use in flushing of
      toilets internal to the building.   All rainwater tanks are to be designed and installed in
      accordance with the Queensland Development Code (QDC), and shall be part of the plumbing
      application in conjunction with the building approval. The location and capacity of the tanks
      shall be clearly shown on the plans submitted for Building Works and Operational Works
      approval and any overflow shall be directed to the onsite detention and infiltration system.




                                                                                           Page 4 of 15

Page 5

                                               -5-



29.   All stormwater drainage (including roof water overflow from the rainwater storage system)
      shall be collected and discharged so there is no net increase in stormwater runoff or intensity
      from the site. Stormwater drainage permitted to drain from the site shall be discharged into a
      detention and infiltration system designed and certified by a suitably qualified Registered
      Professional Civil Engineer or/and be discharged to the kerb & channel street drainage system
      in Elanda Street. Development Permit for Operational Works is required.
      The maximum discharge of stormwater drainage allowable to Council’s kerb & channel street
      drainage system at any one location is 25 litres/second.
30.   Any stormwater detention and/or infiltration systems shall not obstruct maintenance access to
      any sewer main on the site and shall be located away from the zone of influence of Council’s
      sewer system.
      A detailed maintenance plan shall be prepared for any proposed stormwater detention and
      filtration systems, which shall be submitted to the Council for approval prior to obtaining a
      Development Permit for Operational Works.
      The approved maintenance plan shall be incorporated in the Community Management
      Scheme for the development and a copy of this shall be provided for Council’s records prior to
      commencement of the approved Use.

      A Development Permit for Building Works shall not be granted until a Development Permit for
      Operational Works has been issued in regard to the drainage scheme.
31.   To ensure that polluted run-off does not enter Council’s stormwater drainage system,
      stormwater run-off from the carparking areas and the driveways shall have the first flush (the
      first 12 mm of rainfall or hose-down) collected in a grease/oil arrestor/gross pollutant trap
      provided on site prior to being permitted to discharge into stormwater detention system.
      All other clean stormwater, such as roof water and overflows from stormwater tanks, can be
      collected on site and discharged through a single underground drain line directly into the
      proposed drainage disposal system, bypassing the grease/oil arrestor/gross pollutant trap.
      To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil
      arrestors/gross pollutant trap, which shall be submitted to the Council for approval prior to
      obtaining a Development Permit for Operational Works.

      The approved maintenance plan shall be incorporated in the Community Management
      Scheme for the development and a copy of this shall be provided for Council’s records prior to
      commencement of the approved Use.

      A Development Permit for Building Works shall not be granted until a Development Permit for
      Operational Works has been issued in regard to the drainage scheme.
32.   All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
33.   The site shall be connected to Council’s existing sewerage reticulation systems and be
      constructed in accordance with Council’s standards and requirements at no cost to Council.
34.   Given that the existing lots are to be amalgamated, the existing sewer main along the rear of
      the site shall be shortened to 1.5 metres north of the existing sewer manhole at the north east
      corner of the site.
35.   The ‘zone of influence’ (taken as the area within a 45-degree angle measured from the invert
      of the sewer main to the finished surface level) of the retained sewer main and manhole shall
      be accurately located and determined by a licensed Surveyor and shown on all plans
      submitted for Operational Works approval.



                                                                                          Page 5 of 15

Page 6

                                                 -6-



      To ensure Council’s sewer main is accessible for maintenance purposes and is protected from
      risk of damage no structures including stormwater detention or infiltration system, swimming
      pools, retaining walls exceeding 1m in height, raised terraces shall be constructed within this
      ‘zone of influence’ or within 1.5m of the centreline of the sewer main, whichever is the greater.
      As such the applicant shall amend Operational Works plans including Building plans to ensure
      compliance.

Service Easements (Sewer)
36.   A registered easement shall be created over the zone of influence of any retained sewer main
      and manhole on the site. The easements shall generally be parallel to and centred over the
      sewer main and be equivalent in width to twice the depth to invert level of the sewer at the
      deepest point within the allotment (measured from the finished surface) and be no less than
      3.0m wide overall. In this regard a licensed surveyor shall accurately locate all sewer mains
      and determine the necessary width of the easement, which shall be shown on any plans
      submitted for Operational Works / Building Works approval. To this extent the surveyor shall
      certify that the sewer and the zone of influence is wholly contained within the easement to be
      created.
      In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate
      undertaking in writing that the Title Deed and the easement documents will be lodged at the
      Land Titles Office and any additional Titles Office forms or requisitions requiring the consent of
      Council will be attended to promptly.

      A duly executed copy of the easement shall be submitted to Council for perusal prior to the
      use commencing.

      Any changes required by Council’s Solicitor must be corrected immediately.
37.   No building or other structure shall be constructed or encroach over an easement.
      Any building or structure within proximity of an easement or any other public utility’s
      underground must have its foundations designed so that no surcharge loads are imposed
      upon such underground infrastructure. Foundations must be taken down a minimum of 1.0m
      below a line of influence measured 1.0m in the direction of the foundation from the centreline
      of the closest underground service and along the natural angle of repose of the foundation soil
      type(s).

Town Water Supply
38.   The site shall be connected to Council’s existing town water supply and be constructed in
      accordance with Council’s standards and requirements at no cost to Council.
39.   Each individual water connection to the water reticulation system shall extend to the property
      boundary and be metered. All fees for the supply of water meters shall be paid to the Council.
40.   All water meters must be located outside the property boundary and in an easily assessable
      location to facilitate unhindered reading by Council and/or Council’s contracted water meter
      readers, and not behind fences or locked gates. In this regard approval of the water meter
      configuration and location must be obtained from Council’s Water & Sewerage Capital Works
      Manager prior to lodgement and approval of hydraulic drawings.
41.   For Multiple Uses (including Building Format Plans, Group Title Plans, etc) the development
      shall be served by:
      41.1.   A single Body Corporate water meter to measure the total water consumption
              (including fire hose reels, but excluding fire hydrants and fire sprinkler systems), and
      41.2.   Individual water meters to each tenement capable of being separately rated, and


                                                                                             Page 6 of 15

Page 7

                                                  -7-



      41.3.      A fire service (fully testable single detector check with metered bypass), where
                 applicable, for flows to fire hydrants and fire sprinkler systems (excluding fire hose
                 reels).
42.   Fire hydrants are to be provided by the applicant in accordance with Council Engineering
      Design Standards and in accordance with Queensland Fire Service Standards and
      requirements.
Earthworks
43.   Any earthworks required on site shall be carried out in accordance with Council’s Planning
      Scheme Policy PSP5 – Engineering Design Standards.
44.   Earthworks carried out on site shall not affect the structural integrity of any of the existing
      fences or structures that border the development site. Fences that are affected shall be
      replaced prior to the Building Certifier issuing the Certificate of Classification. In this regard
      any fences to be replaced shall be clearly shown on the plans submitted for Operational
      Works approval.
Site Stability
45.   Prior to obtaining a Development Permit for Operational Works, a Geotechnical Engineer or
      similar qualified expert shall assess the soil condition on site, determine the soil classification,
      establish whether any measures are required to protect the stability of adjoining buildings
      and/or structures and/or land, and make recommendations on the type of foundation
      system(s) and soil retention methods best suited for the proposed development. The
      recommendations of this report shall be incorporated into the design and construction of the
      proposed development.
46.   An existing conditions survey of the adjoining properties shall be carried out and submitted to
      Council 10 days prior to the commencement of the operational works for records purpose only.
Erosion and Sediment Control
47.   Any person acting on this permit shall prevent erosion and sediment export from leaving the
      site. Site control measures such as silt fencing, controlled gravel access to the site and
      controlled disposal of waste, will be necessary.
      In this regard plans detailing the methods of controlling erosion and sediment are required to
      be submitted to the Council for approval prior to obtaining a Development Permit for
      Operational Works.

Contributions Towards Council Infrastructure
48.   Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or
      upgrading various infrastructure at the rates applicable at the time of payment. An estimate
      only of the contribution amounts under the current Council policies and requirements is
      outlined in the table below:

       Contribution Required For:                                                       Amount:
       PSP12 – Public Open Space Contributions (Park)                                   $9,101
       PSP16 – Sewerage Headworks Contributions                                         $10,106
       PSP17 – Water Supply Headworks Contributions                                     $14,786
       PSP20 – Pathway Trunk Network Contributions                                      $2,046
       TOTAL Contribution Amount =                                                      $ 36,039
       Please note, that these amounts are all subject to variations in the Consumer Price Index, All
       Groups Brisbane from December 2007 until the date of payment.

                                                                                               Page 7 of 15

Page 8

                                                -8-




      All contributions must be paid prior to the issue of a Development Permit for Operational
      Works.

      Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
      contributions not be paid at the due time, Council shall call upon the trading bank guarantee in
      full.

      Processing of bonds for security where specific Council approval has been given for the
      bonding of contributions will incur an administration fee in accordance with Council’s Land
      Development Commercial & Regulatory Fees at the time of lodgement.

      In the event that the Development Permit for Material Change of Use of Premises lapses or is
      cancelled, the paid contributions and/or the trading bank guarantee will be returned.

General
49.   Engineering drawings and specifications for all engineering works that will become Council
      infrastructure shall be submitted in conjunction with an application for a Development Permit
      for Operational Works. In this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed
      cadastre layout is to be submitted in conjunction with any application for Operational Works.
50.   Digital detailed designs including drawings, calculations, specifications and a schedule of
      works, shall be submitted with any application for a Development Permit for Operational
      Works in respect of roadworks and stormwater drainage works. The design shall be in
      accordance with Council’s Planning Scheme Policy PSP05 – Engineering Design Standards –
      Roads, Drainage and Earthworks. To avoid conflict with underground pipes or services, all
      existing and proposed services required by the development shall be shown on the plans.
51.   To facilitate production of As Constructed drawings it is suggested that all design drawings are
      submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the
      use of ADAC are available at www.adac.com.au).
52.   Any damage caused to any public utility during the course of construction shall be repaired to
      Council’s standards and at no cost to Council.
53.   Any alteration of any public utility or other facilities necessitated by the development of the
      land or associated construction works external to the site shall be at no cost to Council.
54.   The transportation of all materials to and from the site shall be undertaken in a manner such
      that no particle matter escapes onto a public road. All vehicles carrying materials either to or
      from the site shall be covered to prevent materials including dust being windblown from the
      vehicle.
55.   As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
      for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and
      type of all services and structures. All of which shall be submitted to Council for checking and
      for Council’s records.
      The data must fully detail levels for all engineering works including but not limited to drainage
      structures, finished ground levels and pavement surface levels. The data shall be submitted in
      the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC
      are available at www.adac.com.au).

      Approval of works shall not be granted until all As Constructed information has been supplied
      and accepted by Council.




                                                                                            Page 8 of 15

Page 9

                                                -9-



Building Services
56.   Fencing to the swimming pools must comply with the Queensland Building Act 1975 Part 3 (as
      amended) and Part 5 of Standard Building Regulation 1993 in all respects. Direct access from
      the building to the pool enclosures is not permitted.
Environmental Health
57.   Where the development involves the removal, relocation or demolition of a building, a Waste
      Management Plan (construction and demolition) shall be submitted prior to demolition,
      removal or relocation of any building other than a shed.
      Waste Management Plans (construction and demolition) are required to be submitted in
      accordance with Planning Scheme Policy 11, Waste Management Plans see table below.

      Waste storage areas are to provide for adequate separation of all reusable, recyclable and
      waste materials. These shall be located so that they are convenient and safe to use. (Refer to
      Noosa Council Waste Management Code)

      The Plan shall contain the following information:
    The site area for the storage and separation of waste is to be shown on the plan drawings
      accompanying the application.
    A waste management table as indicated below is to be completed showing how waste material
      is to be segregated - recycled – reused or disposed.


       MATERIALS ON-SITE                                          DESTINATION
                                                     Re-use and Recycling                    Disposal
       Expected waste       Estimated      On-site              Off-site               *specify contractor
       materials            volume(m³)     *specify   proposed *specify contractor     and landfill site or
                                           re-use or on-site and recycling outlet      other disposal site
                                           recycling methods
       Excavation
       material
       Green waste
       Bricks
       Concrete
       Timber-please
       specify
       Plasterboard
       Metals - please
       specify
       Asbestos
       Other - please
       specify

      Note * If a demolition contractor is undertaking works, then the Waste Management table is to
      be completed by the demolition contractor.

      The purpose of the Waste Management Plan is to facilitate the segregation of waste for the
      effective reuse and recycling of such materials. Additionally Council rewards those who
      segregate waste by significantly reducing disposal fees at the landfill some items are free.
      Higher gate fees are charged for loads of mixed waste.




                                                                                         Page 9 of 15

Page 10

                                                     - 10 -



58.    The developer must provide waste storage and disposal facilities in accordance with Planning
       Scheme Policy “Waste Management Multi-Dwellings and Commercial and Industrial
       Premises”, including an external imperviously paved area correctly sized for all refuse and
       recycling containers and suitably screened from public places and neighbouring properties.
59.    Noise emission from mechanical equipment (air conditioners, refrigeration equipment or pool
       pumps etc) shall comply with the following requirements:
       59.1.   The equipment shall be installed and located in a manner that prevents excessive
               noise in accordance with Council’s Local Law No. 12 - Control of Nuisances.
               Infringement Notices (on-the-spot fines) may apply for offences.
       59.2.   A person must not use equipment on any day if it makes or causes noise to be made:
               59.2.1. From 10pm to 7am: More than the lower of either –
                          40 dB(A)
                          3 dB(A) above the background noise level
               59.2.2. From 7am to 7pm: More than the lower of either –
                          50 dB(A)
                          5 dB(A) above the background noise level
               59.2.3.       From 7pm to 10pm: More than 3 dB(A) above the background noise level.
               59.2.4.       Pool pumps must not be audible at an effected premises between 10pm-7am
60.    Noise from residential building works shall comply with the following –
       60.1.   Limited to between 7:00am to 6:30pm Monday to Saturday.
       60.2.   All reasonable measures are taken to minimise noise emissions.
       60.3. Not permitted on Sunday or public holidays.
5      REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:

 Referral Trigger                  Referral Status   Referral Agency         Referral Address

 Nil

6      APPROVED PLANS/DOCUMENTS

The approved plans and / or documents for this development approval are listed in the following
table:
 Plan / Document No.           Rev.     Plan / Document Name                      Date
 0710SD.01                     A        Roof Plan – Ian Gorton Design             Aug 2007
 0710SD.02                     A        Level 3 Floor Plan – Ian Gorton Design    Aug 2007
 0710SD.03                     A        Level 2 Floor Plan – Ian Gorton Design    Aug 2007
 0710SD.04                     A        Level 1 Floor Plan – Ian Gorton Design    Aug 2007
 0710SD.05                     A        Sub Floor Plan – Ian Gorton Design        Aug 2007
 0710SD.06                     A        Elevations Sheet 1 – Ian Gorton Design    Aug 2007
 0710SD.07                     A        Cross Sections – Ian Gorton Design        Aug 2007



                                                                                                Page 10 of 15

Page 11

                                              - 11 -



7    ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1.   The applicant is advised that development contributions and infrastructure charges applicable
     to this development approval have been based on the following Uses Class/ Uses and
     applicable quantities:-

                 Existing Development                            Approved Development
       Existing Use Class                              Approved Use Class
                               Existing Quantity                                Approved Quantity
              / Use                                          / Use
                                                       Multiple Housing -
                              1 Dwelling & a
       Detached House                                  Type 4 –                5x 3 Bedroom Units
                              Vacant Land (2 Lots)
                                                       Conventional

2.   The applicant is informed that approval of this development application will trigger an
     Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure
     Charges Plan for the estimated amount of $4,051 and is subject to variations in the Consumer
     Price Index, All Groups Brisbane from December 2007 until the date of payment. An
     Infrastructure Charge Notice will be issued in accordance with Chapter 5 of the Integrated
     Planning Act 1997.
3.   The applicant is informed that payment via credit card transaction will not be an acceptable
     method of payment for development contributions conditioned in this permit or for
     infrastructure charge notices issued separately.
4.   The applicant is advised that a Compliance Permit for all plumbing and drainage works within
     the boundaries of the development site shall be obtained from Council’s Plumbing Services
     Section prior to obtaining a Development Permit for Building Works.
5.   Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if
     the cost of operational works exceeds $80,000, then a portable long service leave levy is
     required to be paid. In accordance with Section 77.(1) of the Act, Council is required to sight
     the approved form issued by the Building and Construction Industry (Portable Long Service
     Leave) Authority that confirms that the requirements of the Act have been satisfied. A statutory
     declaration outlining the cost of the operational works must be submitted to Council with the
     lodgement of any application for operational works over the site.
6.   The development should be undertaken in a manner that causes no detrimental effect upon
     the amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-
     borne hazards, atmospheric pollutants (including dust or odours) nuisance or any other
     emissions in accordance with the nuisance provisions of the Environmental Protection
     Regulation 1998 or Council’s Local Law No. 12 – Control of Nuisances.
7.   In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint,
     cement, concrete, builder’s waste or rubbish should not be permitted to enter or be placed
     where it could reasonably be expected to move into a roadside gutter, storm water drain or a
     watercourse. On the spot fines apply for such offences.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003.




                                                                                         Page 11 of 15

Page 12

                                                  - 12 -



The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can
also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or
the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.

8     PROPERTY NOTES

Not applicable
9     PRELIMINARY APPROVAL OVERRIDING SCHEME

Not applicable

10    FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required            Subject of the required Development Permit
 Development Permit for Building Works          All Building Works

 Development      Permit   for   Operational    Landscaping, Carparking & Access, Frontage Works,
 Works                                          Stormwater Drainage & Detention and Infiltration
                                                System, Road Widening & Kerb & Channel and
                                                Erosion & Sediment Control

11    SELF ASSESSABLE CODES
Not applicable

12    SUBMISSIONS

There were no properly made submissions about the application.

13    REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable

14    RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. If Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice”
may be given. Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the Integrated Planning Act 1997).

15    OTHER DETAILS

Please note that an Infrastructure Charge in accordance with the Coastal Major Road Network
Infrastructure Charges Plan has been triggered by the approval of this development application. An
Infrastructure Charge Notice is attached in compliance with Chapter 5 of the Integrated Planning Act
1997.

                                                                                               Page 12 of 15

Page 13

                                             - 13 -



Should you wish to obtain more information about Council’s decision electronic copies of Council’s
decision are available on line at www.sunshinecoast.qld.gov.au, or at Council Offices.

Yours faithfully,




Shane Adamson
MANAGER - LAND USE




                                                                                       Page 13 of 15

Page 14

                                                        - 14 -




                                              Appeal Rights
                                             INTEGRATED PLANNING ACT 1997 & 1998 REGULATION


                                                                     (5) If an application is processed under section
The following is an extract from the Integrated                  6.1.28(2), appeal rights for submitters for the
Planning Act (Chapter 4).                                        application are available only for the aspects of the
                                                                 development that would have required public
Division 8 - Appeals to court relating to
                                                                 notification under the repealed Act.
development applications
Appeals by applicants                                                (6) If an application involves assessment
4.1.27.(1) An applicant for a development                        against a concurrence agency code, appeal rights
application may appeal to the court against any of               for submitters for the application are not available
the following-                                                   against the part of the approval that represents the
(a) the refusal, or the refusal in part, of a                    concurrence agency’s response for the code.
    development application;                                     Appeals by advice agency submitters
(b) a matter stated in a development approval,                   4.1.29.(1) An advice agency may, within the limits
    including any condition applying to the                      of its jurisdiction, appeal to the court about the
    development, and the identification of a code                giving of a development approval for a
                         1
    under section 3.1.6;                                         development application if-
(c) the decision to give a preliminary approval                  (a) the development application involves impact
    when a development permit was applied for;                       assessment; and
(d) the length of a currency period;                             (b) the advice agency told the applicant and the
(e) a deemed refusal.                                                assessment manager to treat its response to
                                                                     the application as a submission for an appeal.
    (2) An appeal under subsection (1)(a) to (d)
must be started within 20 business days (the                         (2) The appeal must be started within 20
“applicant’s appeal period”) after the day the                   business days after the day the decision notice or
decision notice or negotiated decision notice is                 negotiated decision notice is given to the advice
given to the applicant.                                          agency as a submitter.
    (3) An appeal under subsection (1)(e) may be                 Appeals for matters arising after approval given
started at any time after the last day a decision on             (co-respondents)
the matter should have been made.                                4.1.30.(1) For a development approval given for a
Appeals by submitters                                            development application, a person to whom any of
                                                                 the following notices have been given may appeal
4.1.28.(1) A submitter for a development
                                                                 to the court against the decision in the notice-
application may appeal to the court about-
                                                                 (a) a notice giving a decision on a request for
(a) the giving of a development approval, including
                                                                     extension of the currency period for an
    any conditions (or lack of conditions) or other
                                                                     approval;
    provisions of the approval; or
                                                                 (b) a notice giving a decision on a request to make
(b) the length of a currency period for the approval.
                                                                     a minor change to an approval.
    (2) The appeal must be started within 20
                                                                     (2) The appeal must be started within 20
business days (the “submitters appeal period”)
                                                                         business days after the day the notice of the
after the day the decision notice or negotiated
                                                                         decision is given to the person.
decision notice is given to the submitter.
                                                                     (3) Subsection (1)(a) does not apply if the
    (3) If a person withdraws a submission before
                                                                         approval resulted from a development
the application is decided, the person may not
                                                                         application (superseded planning scheme)
appeal the decision.
                                                                         that was assessed as if it were an
    (4) If an application involves both impact                           application under a superseded planning
assessment and code assessment, appeal rights                            scheme.
for submitters are available only for the part of the
                                                                     (4) Also, a person who has made a request
application involving impact assessment.
                                                                         mentioned in subsection (1) may appeal to
                                                                         the court against a deemed refusal of the
                                                                         request.
1
     Section 3.1.6 (Preliminary approval may override
    local planning instrument)
                                                                                                         Page 14 of 15

Page 15

                                                        - 15 -



    (5) An appeal under subsection (4) may be                        (2) The appeal must be started within 20
        started at any time after the last day the               business days after the day notice of the decision
        decision on the matter should have been                  is given to the applicant.
        made.                                                    For Building Works Only
Division 9 - Appeals to court about other                        Rights of appeal conferred by Section 4.2.9 of the
matters                                                          Integrated Planning Act 1997 as follows:
Appeals for matters arising after approval given                 Division 3 – Appeals to tribunals relating to
(no co-respondents)                                              development applications
4.1.31.(1) A person to whom any of the following                 Appeals by applicants
notices have been given may appeal to the court
                                                                 4.2.9(1) An applicant for a development application
against the decision in the notice-
                                                                 may appeal to the Building and Development
(a) a notice giving a decision on a request to                   Tribunal against any of the following-
    change or cancel a condition of a development
    approval.                                                    (a) the refusal, or the refusal in part, of a
                                    2                                development application;
(b) a notice under section 6.1.44 giving a decision
    to change or cancel a condition of a                         (b) a matter stated in a development approval,
    development approval.                                            including any condition applying to the
                                                                     development, and the identification of a code
    (2) The appeal must be started within 20                         under section 3.1.6;
                                                                                           3
        business days after the day the notice of the
        decision is given to the person.                         (c) the decision to give a preliminary approval when a
                                                                       development permit was applied for;
    (3) Also, a person who has made a request
                                                                 (d) the length of a period mentioned in section 3.5.21
        mentioned in subsection (1)(a) may appeal
                                                                       currency period;
        to the court against a deemed refusal of the
        request.                                                 (e) a deemed refusal.
    (4) An appeal under subsection (3) may be                       (2) An appeal under subsection (1)(a) to (d) must
        started at any time after the last day the               be started within 20 business days (the “applicant’s
                                                                 appeal period”) after the day the decision notice or
        decision on the matter should have been
                                                                 negotiated decision notice is given to the applicant.
        made.
                                                                     (3) An appeal under subsection (1)(e) may be
Appeals against decisions to change approval                     started at any time after the last day a decision on the
conditions under the repealed Act                                matter should have been made.
4.1.33A.(1) A person who is dissatisfied with a                  The Registrar for the Building and Development
decision made on an application to change the                    Tribunal may be contacted at the website
conditions attached to an approval given under                   http://www.localgovernment.qld.gov.au/
section 2.19(3)or section 4.4 of the repealed Act
may appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
    (2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice
of the decision is to be given to the person.
    (3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on
the matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to
the court against the decision or the conditions
applied.




2
     Section 6.1.44 (Conditions may be changed or
                                                                 3
    cancelled by assessment manager or concurrence                    Section 3.1.6 (Preliminary approval may override
    agency in certain circumstances)                                 local planning instrument)
                                                                                                             Page 15 of 15

Used in these records

About this file

File size
84 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED Decision Notice - 010.2007.00002174.001 [As Published].pdf · 84 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.