Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

SUPERSEDED Decision Notice - 010.2007.00002174.001 [As Published] · 132007.2174

of 15

Text shows just the words. Original shows the document exactly as it was published.

                                                -9-



Building Services
56.   Fencing to the swimming pools must comply with the Queensland Building Act 1975 Part 3 (as
      amended) and Part 5 of Standard Building Regulation 1993 in all respects. Direct access from
      the building to the pool enclosures is not permitted.
Environmental Health
57.   Where the development involves the removal, relocation or demolition of a building, a Waste
      Management Plan (construction and demolition) shall be submitted prior to demolition,
      removal or relocation of any building other than a shed.
      Waste Management Plans (construction and demolition) are required to be submitted in
      accordance with Planning Scheme Policy 11, Waste Management Plans see table below.

      Waste storage areas are to provide for adequate separation of all reusable, recyclable and
      waste materials. These shall be located so that they are convenient and safe to use. (Refer to
      Noosa Council Waste Management Code)

      The Plan shall contain the following information:
    The site area for the storage and separation of waste is to be shown on the plan drawings
      accompanying the application.
    A waste management table as indicated below is to be completed showing how waste material
      is to be segregated - recycled – reused or disposed.


       MATERIALS ON-SITE                                          DESTINATION
                                                     Re-use and Recycling                    Disposal
       Expected waste       Estimated      On-site              Off-site               *specify contractor
       materials            volume(m³)     *specify   proposed *specify contractor     and landfill site or
                                           re-use or on-site and recycling outlet      other disposal site
                                           recycling methods
       Excavation
       material
       Green waste
       Bricks
       Concrete
       Timber-please
       specify
       Plasterboard
       Metals - please
       specify
       Asbestos
       Other - please
       specify

      Note * If a demolition contractor is undertaking works, then the Waste Management table is to
      be completed by the demolition contractor.

      The purpose of the Waste Management Plan is to facilitate the segregation of waste for the
      effective reuse and recycling of such materials. Additionally Council rewards those who
      segregate waste by significantly reducing disposal fees at the landfill some items are free.
      Higher gate fees are charged for loads of mixed waste.




                                                                                         Page 9 of 15

Used in these records

About this file

File size
84 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED Decision Notice - 010.2007.00002174.001 [As Published].pdf · 84 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.