Skip to the record
For the highest quality transcripts.

Original source · versioned page text

MCU14/0106 & OPW15/0001 Compiled Information Request Response

of 281

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (65.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 155, section 1. The text section number identifies this passage in the reader.

Noosa Civic
Stormwater Management Plan



Table 3-6        Basin Areas

 Treatment Device                                     Area (m2)
 Southern Basin (m2)                                     135
 Roundabout (m2)                                         250
 C1 Carpark Basins (m2)                                  320
 C2 Carpark Basin (m2)                                    54
 C3 Carpark Basins (m2)                                   54
 C4 Carpark Basin (m2)                                    82
 C5 Carpark Basins (m2)                                   61


Table 3-7 presents the results obtained from the MUSIC model.
Table 3-7        Full Site Treatment Basin MUSIC Model Results

            Pollutant          Proposed without    Proposed with          Reduction        Target Reduction
                                  treatment          treatment            Achieved                (%)
                                    (kg/yr)            (kg/yr)               (%)
 Total Suspended Solids             15400                2310                85                   80
 Total Phosphorous                   35.9                14.1                60.8                 60
 Total Nitrogen                      299                 153                 48.7                 45
 Gross Pollutants                   1970                 46.8                97.6                 90


With reference to Table 3-7, it can be concluded that the proposed treatment will be sufficient to satisfy the
water quality objectives applicable to the site. The locations of the treatment devices are shown on Figure 4.




QIC Noosa Civic Pty Ltd                         Version Final                                      11 May 2015
J13041R2_Final SWMP.docx                    Commercial in Confidence                                   Page 10
Log in to download the original file

MCU14_0106 & OPW15_0001 Compiled Information Request Response.pdf · 65.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.