MCU14/0106 & OPW15/0001 Compiled Information Request Response
The original of this document is very large (65.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 61, section 1. The text section number identifies this passage in the reader.
MCU14/0106 Issue – Legal Point of Discharge It is unclear how waters treated within proposed bioretention basins will drain to a legal point of discharge or where this discharge point will be. There is concern that the underdrainage pipes will be lower than the invert of the receiving drainage lines. Information Required 53 Provide a preliminary drainage plan for flows into and out of water quality treatment devices. Demonstrate outlets can all be contained within the site. Issue – Environmental Protection Act The scale of the development in terms of roof and hardstand area exceeds that anticipated by current Noosa Plan. In addition to ensuring developments achieve the Water Quality Reduction targets under the State Development Assessment provisions, Council must ensure that any changes inconsistent with the Noosa Plan are consistent with the objectives of the Environmental Protection Act. The Environmental Protection Act and subordinate legislation calls for Planning Schemes (or other stormwater management documents) to ensure that water quality objectives in the receiving environment can achieve ongoing compliance with the document titled “Environmental Protection (Water) Policy 2009 Noosa River environmental values and water quality objectives Basin No. 140 (part), including Kin Kin Creek, Teewah coastal creeks, Lakes Cooroibah, Cootharaba, Doonella and Weyba July 2010.” The development is proposed within a catchment that is already heavily developed and the ecological processes within the receiving waters are expected to have minimal buffering capacity to withstand additional physiochemical changes. eSource Catchment software is able to model the status of a catchment and predict the quality of receiving waters. Information Required 54 Please provide an eSource catchment model for the entire catchment that drains to the receiving waters of Eenie Creek. The eSource Catchment Model must presume a fully developed catchment consistent with the Noosa Plan together with the subject application. The eSource catchment model must demonstrate that the development, including proposed water quality mitigation devices, will not diminish the ability of Eenie Creek to achieve the relevant water quality objectives required by the Environmental Protection (Water) Policy 2009 Noosa River environmental values and water quality objectives Basin No. 140 (part), including Kin Kin Creek, Teewah coastal creeks, Lakes Cooroibah, Cootharaba, Doonella and Weyba July 2010. Issue – Water Quantity The concept of the use of the car parks and bioretention basins is considered acceptable means for providing flood attenuation but the quantum of detention may need to be larger than that allowed for. Information Required 55 Amended WBNM model and proposal plans, and potentially a hydraulic plan, to demonstrate the runoff from the development can achieve the required attenuation Page 12 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.