Appendix C - Code Assessment · MCU17/0004

Attached to the e-mail REC17/0002, MCU17/0004 & OPW17/0005 Boundary Realignment, Material Change of Use (2 x duplexes) & Op Works - 46-48 Elizabeth St, Noosaville.

of 53

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Reconfiguring a Lot Code



(including the amenity of the local area) in the        carrying existing high voltage lines; or
short and long term; and                                c) no extensions to the existing reticulation
f) ensures that the existing systems are upgraded       network is necessary; or
or relocated to be capable of supporting the            d) it is necessary to cross a body of water;
proposed development;                                   AND
                                                        S16.3 Street lighting is provided in accordance
                                                        with Section 3.19 of PSP5 Engineering Design
                                                        Standards – Roads, Drainage and Earthworks;
                                                        AND
                                                        S16.4 For lots not within a sewerage service area -
                                                        the lot has sufficient area and other attributes to
                                                        ensure sustainable on-site sewerage disposal

O17 Essential network infrastructure (e.g.              S17.1 Components of the essential network
electricity, water supply, sewerage and                 infrastructure that are likely to fail or may result in
telecommunications) maintains effective function        contamination when inundated by flood water—
during and immediately after flood events.              a) comply with Table 13.12; or
                                                        b) are designed and constructed to exclude
                                                        water inundation or infiltration and resist
                                                        hydrostatic and hydrodynamic forces as a result of
                                                        inundation.



Electricity supply infrastructure                       S18.1 Building footprints are situated clear of any
O18 Uses and works maintain a safe distance             power easements on-site;
from electrical infrastructure including substations,   AND
overhead power lines, power poles and                   S18.2 Building footprints are not less than 50m
transformers.                                           from an existing fenced electricity substation.


14.190 Earthworks and stormwater management
O19 Storm water run-off is managed so as not to         No solution provided                                      O19 – Complies
cause any adverse impacts on the built or natural                                                                 The proposal will manage storm water run-off to
environment including changes in quality, quantity

Used in these records

About this file

File size
844 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

APPENDIX C - CODE ASSESSMENT.pdf · 844 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.