Skip to the record
Every meeting, every word.

Original source · versioned page text

Meeting papers

of 67

Page text shows just the words. Original shows the document exactly as it was published.

Item   Issue        Term

                    (b)       operate and maintain the community battery (Equipment) for an initial suggest 5 years

                    (c)     connect the Equipment into the National Energy Grid to generate a revenue source in accordance with the relevant
                    rules and conditions of the Australian Energy Market Operator (AEMO) and Energex as the Distributed Network Service
                    Provider (DNSP)

                    (d)    YEF will develop Project Plans for the manufacture, installation and commissioning of the community battery in
                    Noosaville in accordance with the Milestones stated in the Grant Agreement. This will include all relevant approvals required
                    from Energex, Council and other relevant authorities

                    (e)    YEF will procure the stated technology for the battery, in consultation with Council, in accordance with the proposal
                    and budget set out in the Grant Agreement.

                    (f)    YEF will develop a Community Engagement Plan to be implemented by ZEN to ensure community understanding and
                    acceptance of the community battery in the proposed location

                    (g)      YEF will develop a Management Plan for the operation and maintenance of the Works to achieve the greatest benefit
                    to the community in terms of emission reduction and return on investment. This will include the establishment of a community
                    benefit fund to use any profit from operation of the Works for further emission reduction initiatives in the Noosa Local
                    Government Area.

15.    Warranties   The Agreement will include appropriate warranties in respect of:

                    •     YEF’s design obligations;

                    •     YEF’s obligations to carry out the work under the Contract and to engineer, supply, install, test and commission the Works
                          (including the Equipment);

                    •     the documents provided by YEF (such as management plans, O&M manuals etc)

                    •     the Works when completed, including in relation to:

                              o   design life and rate of deterioration;

                              o   the works being structurally and mechanically sound and complying with legislative requirements;



                                                                                                                                             Page | 14



                                                                                                                                               Page 22 of 67
Log in to download the original file

6f99fbbbc4.pdf · 2.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.