Original source · versioned page text
Meeting papers
Item Issue Term
29. Liability and YEF to indemnify Council against loss or damage Council incurs, with a carve out for loss or damage caused or contributed to
indemnity by Council
Each party’s liability will be limited to an agreed limit.
None of the Parties will be liable for specified consequential losses.
Limit of liability and exclusion of consequential loss will be subject to certain standard carve outs
30. Insurances During the Construction Period, [YEF] to effect and maintain the following insurances:
• Insurance of the Works
• Public liability
• Professional indemnity
• Workcover
• (possibly) industrial special risks
During the O&M Period, [YEF] to effect and maintain the following insurances:
• Public liability
• Professional indemnity
• Workcover
• (possibly) industrial special risks
Evidence of insurance to be provided prior to accessing the site and otherwise as requested by Council.
Failure to insure will allow Council to effect insurances and deduct premiums from payments to Contractor
Page | 18
Page 26 of 67
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.