2025/26 Budget Statements 10 YEAR CAPITAL PROGRAM
Financial Year ended 30 June 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
Shire Wide - Heavy Patching 1,576,000 1,615,400 1,655,800 1,697,200 1,739,700 1,783,200 1,827,800 1,873,500 1,920,400 1,968,500
Shire Wide - Sealing of Unsealed Roads 1,500,000 1,537,500 1,576,000 1,615,400
Cooroy Mountain, Cooroy Mountain Road - Carriageway Widening 185,000 1,665,000
Hinterland - Road Section Upgrades - (Design & Construct) 461,200 696,000 713,400 731,300 749,600
Peregian Beach D&C New Roundabout David Low Way/ Lowry St/Peregian Esplanade 110,000 220,000 770,000
Sealed Roads Network Total 7,384,800 8,500,100 9,611,400 12,750,500 9,938,046 10,692,000 11,474,500 11,761,600 12,056,000 12,666,500
Sports Ground and Facilities
Cooroy Sports Complex - Gymnastics Upgrade & Multi-purpose area 1,261,433 840,955
Cooroy - Sports Complex - Detailed Design & Delivery 150,000 1,894,800
Shire Sporting Facilities Infrastructure Upgrades 100,000 100,000 100,000 100,000 100,000 100,000 100,000
Kin Kin Sportsground Upgrade to Oval Facilities & Amenities 307,800
Sports Ground and Facilities Total 1,261,433 990,955 2,202,600 100,000 100,000 100,000 100,000 100,000 100,000 100,000
Stormwater Drainage
Cooroy - Six Mile Creek - Catchment Management Plan 560,000
Noosa Heads - Cooyar Street - Stormwater Bio-basin Upgrade 436,896
Noosa Heads Cooyar Street (Elanora Terrace to Safari Street) Bio-Retention Basin 193,381
Noosa Heads Cooyar Street (Opposite Wyandra) Upgrade Bio-Retention System 500,000
Noosaville - Hilton Esplanade Stormwater Upgrades 1,124,900
Noosaville - Wylah Street - Stormwater Culvert Renewal 100,000 1,000,000 1,000,000
Shire Bio-Retention Basin Renewals Program 52,600 54,000 55,400 56,800 58,300 59,800 61,300 62,900 64,500 66,200
Shire Pipe Relining / Rehabilitation Renewal Program 220,700 226,300 232,000 237,800 243,800 249,900 256,200 262,700 269,300 276,100
Shire Pit Structure Renewal Program 120,900 124,000 127,100 130,300 133,600 137,000 140,500 144,100 147,800 151,500
Shire Stormwater Drainage Trunk Network Upgrade - LGIP 500,000 500,000 500,000 500,000 500,000 500,000 500,000
Shire Stormwater Renewal Program 1,000,000 1,020,000 1,040,400 1,061,200 1,082,400 1,104,000
Sunrise Beach Dame Patti Drive Stormwater Outlet Upgrade 106,149
Sunshine Beach - Bicentennial Drive - Bio-basin Renewal 288,000
Sunshine Beach - Ross Crescent - Slope Stabilisation Construction 3,166,981
Tewantin - Hilton Precinct - Stormwater Drainage Alignment Design 36,000
Stormwater Drainage Total 4,134,077 2,358,449 2,732,781 1,424,900 1,935,700 1,966,700 1,998,400 2,030,900 2,064,000 2,097,800
Strategic Planning
Cooroy - Lake Macdonald Drive - Residential Subdivision 1,900,000
Cooran - Sports and Rec - Precinct Master Planning 153,400
Noosa Heads - Arrivals Precinct - Master Plan 635,000 560,800
Noosaville - Wallace Park Precinct - Master Plan 146,400
Cooroy - Cooroy East Local Centre - Infrastructure Master Plan 150,000 176,300
Tewantin - Noosa Regional Gallery - Master Plan 265,135 113,629
Riverine - Noosa River Recreational Boat Facilities Study 60,000
Noosaville - Leisure Centre - Master Plan 492,600
Doonan - Eumundi Landfill - Masterplan & Feasibility Study 400,000 315,000 315,000
Shire Wide Precinct & Master Planning 300,000 307,500 323,100 323,100 323,100 323,100 323,100 323,100
Tewantin Foreshore Parkland and Public Realm - Master Plan 200,000 500,000
23
Page 148 of 392
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (190f110f82.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.