Original source · versioned page text
Meeting papers
Original PDF page 253, section 1. The text section number identifies this passage in the reader.
Disaster Recovery
[Activities may include convening the Disaster Recovery Group, conducting needs analysis, operational and
action planning, capturing details of Council asset damage and estimates and planning of reconstruction costs,
dealing with public health and bulk waste disposal requirements, submitting a claim for financial assistance from
other levels of government etc.]
Reactive work Convene Disaster Recovery Group As required
Co-ordinate / implement actions for recovery – As required
Local Recovery co-ordinator
Capture details of asset damage, estimated costs to As required
rectify
DRFA application for funding As required
DRFA acquittal As required
49 of 173
Page 253 of 392
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (190f110f82.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.