Original source · versioned page text
Meeting papers
SERVICE AREA – ROAD NETWORK (SEALED ROADS)
Summary
Objective: Provision and maintenance of an integrated, safe and serviceable road transport network comprising
roads, bridges and car parking.
Activities: The activities include repairs to the road surface, shoulders and table drains as well as maintenance of
allied road furniture such as guardrails, barriers and other structures, streetscape furniture & fittings, providing and
maintaining signage and line-marking and street sweeping/cleaning.
Delivery Framework Details
Corporate Plan Theme
Responsibility Civil Operations & Asset
(Branch Level)
Legislative Responsibility Local Government Act 2009
Land Act 1994.
Service Delivery Model There is a mix of in-house and external contractors to deliver this service.
Service Inputs Details
(Resources to Deliver Service)
Physical Assets/Infrastructure Kilometres of Sealed Roads (612km)
Software & Systems TechnologyOne; RACAS
Budget Cost Centres Sealed Roads (2001)
Signs & Lines (2003)
Road Furniture (2006)
Vegetation (2008)
Traffic Operations (2012)
Management Civil Operations (2000)
Works Operations Coordination (2021)
Works Operations (2704)
FTE 21.5
Other Key Metrics
Service Outputs - Performance Measures
Type Measure Target Methodology / Calculation
Efficiency Cost per sealed kilometre tbc Calculated annually
Effectiveness Road Condition Index tbc Average for the shire
Community satisfaction Optimum rating: 5 Benchmark: Community
survey Improvement from satisfaction mean
previous rating performance rating
Theme: Basic Services &
Infrastructure 2019 4.45
Function: Road 2021 3.22
Maintenance
125 of 173
Page 329 of 392
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (190f110f82.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.