Service Outputs – Detailed Activity Listing
                             Activity                                               Service Level/Standard
Stormwater system maintenance & operations
[Includes inspections and routine maintenance/repairs of culverts, pipes, inlet pits & outlets, subsoil drains,
open channels, retardation basins, retention basins and gross pollutant traps to ensure the stormwater drainage
network is operating effectively]
Cyclic Inspections1                Culvert/pipes inlets & outlets          Six monthly
                                   Major GPTs at Sunshine Beach,           4 times per year (quarterly)
                                   Noosa Junction, Hastings St,
                                   Cooyar St.
                                   Minor GPTs                              3 times per year (tri-annual)

                                                                           Note: Audit done on bio-retention
                                                                           basins and data validated. Program
                                                                           being developed to bring these assets
                                                                           to standard and then operating costs
                                                                           will need to be funded in budget for
                                                                           routine maintenance work. Currently
                                                                           not done – service gap.
                                    Park Road slip area (beginning of
                                    Boardwalk to First Point):
                                    • Subsoil drainpipe camera check       Annually
                                    • Dipping points checked/cleaned       Quarterly
                                    • During intense rainfall              Weekly

Scheduled Work                      As identified from inspections (defects & proactive interventions) to maintain
                                    free flow of stormwater with specific requirements as follows:

                                    GPTs (major)                           4 times per year (quarterly)
                                                                           Note: Audit done on bio-retention
                                                                           basin and data validated. Program
                                                                           being developed to bring these assets
                                                                           to standard and then operating costs
                                                                           funded in budget for routine
                                                                           maintenance work.
                                    GPTs(minor)                            3 times per year (tri-annual)
                                    De-silting of stormwater lines         As required

Reactive work 2                     All requests                           20 business days (target days for
                                                                           completion)
                                    Stormwater “as constructed” search     2 business days

Flood alert & mitigation maintenance and operations
[Works to maintain, repair and operate the flood alert system and flood mitigation infrastructure]
Cyclic inspections                Flood alert towers/structures                 Annual

                                   Flood alert stations (telemetry)             Annual (with BOM technician)

                                   Flood maximum height gauges (static          Annual
                                   measuring tool in event of telemetry
                                   failure)

                                   Daintree Estate3 flood mitigation &
                                   drainage inspections check:
                                   • Concrete and earth levee (qualified        Annual (September)
                                       professional)
                                   • Level of debris/blockages along            Annual pre-wet season + as
                                       levee wall                               required
                                   • culverts and ensure clear of debris
                                       blockage                                 Annual pre-wet season + as
                                                                                required

                                                                                                             143 of 173
                                                                                                           Page 347 of 392

Log in to download the original (190f110f82.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.