Service Outputs – Detailed Activity Listing
Activity Service Level/Standard
Scheduled work Environmental performance reporting (DESI) Return – Annual
Survey – Bi-annual
Data - Quarterly
Monitoring high efficiency sediment basin (SCADA). Daily
Monitor pumpwells, leachate sumps, discharge to
sewer
Groundwater, surface water & gas monitoring, Quarterly and weekly through
testing & reporting (contract) EMS
Aerial photography – airspace consumption Quarterly
Reactive work Enquiries/complaints 5 business days
[customer requests] Groundwater, surface water & gas monitoring, As required during rainfall
testing & reporting (contract)
Disaster clean up / disposal As required – determined by
nature of event (LDMG
requirements).
Enquiries/complaints 5 business days
Groundwater, surface water & gas monitoring, As required during rainfall
testing & reporting (contract)
Landfill Operations
[Includes conduct of the weighbridge, daily waste disposal & separation, stockpiling of recyclable materials and
disposal of waste materials to the landfill, site & stockpile maintenance and methane gas capture]
Availability Location Opening Hours
Eumundi Road Landfill 7am - 5pm, 7 days a week
Closed Christmas Day
On-call 24/7
Cyclic inspections WHS inspections Quarterly
WHS Audit Periodically
Inspection of various pumps (8) Monthly
(contract)
Scheduled Work Compact and Cover landfill waste Daily
(contractor)
Capital project management As required
Soil stockpile maintenance (contractor) Daily
Waste compaction monitoring – 950 Twice yearly
kg/m3 (aerial surveys)
Slashing – former Pomona landfill Every 6 weeks (growing season)
Every 10 weeks (winter season)
Leachate and stormwater pump Quarterly or as required
maintenance (as identified from
inspections)
Cleaning of buildings (contract):
- Landfill Weekly
Transfer Stations Monthly
Cleaning/sweeping of roads and hard
standing areas (contract):
- Landfill Monthly
Transfer Stations Quarterly
Reporting & provision of data for Monthly
account customer invoicing (Wasteman
system)
Debt review/account customer Monthly
management (in conjunction with
Revenue Section)
Capping Ongoing
Methane Gas capture contract and Scheduled meetings
improvements
Reactive work Intermediate cover when cell reaches As required
interim land form profile
Cell capping As required
169 of 173
Page 373 of 392
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (190f110f82.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.