REFERENCED DOCUMENT Assessment of Existing Wastewater Infrastructure - MCU13/0064
1st July 2013
Makepeace Island
Assessment of Existing
Wastewater
Our Ref: Infrastructure –
4225 Proposed Change of
Use
Makepeace Island,
Noosa North Shore
Client: Makepeace Island (Operations)
Pty Ltd
Future-Plus Environmental Sunshine Coast (SQ)
PO Box 1250 Buddina QLD
Future-Plus Environmental Gladstone (CQ)
PO Box 1290 South Gladstone QLD
p: 07 5450 2688 e: [email protected] PO Box 1250, Buddina Q 4575
f: 07 5450 2686 www.future-plus.com.au ABN 23 658 506 336
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 8 pages
Page 2
1st July 2013
Our Ref: 4225-130402-1.2
Application No: MCU13/0064
The Chef Executive Officer CC: General Manager
Sunshine Coast Regional Council Makepeace Island (Operations) Pty Ltd
Sunshine Coast Mail Centre PO Box 672
Locked Bag 72, Tewantin Qld 4565
QLD 4560
Attention: Assessment Manager Attention: Nick Jones
MATERIAL CHANGE OF USE – 13/0064
EXISTING WASTEWATER INFRASTRUCTURE
MAKEPEACE ISLAND, NOOSA NORTH SHORE
We refer to the above project and the Information Request from the Sunshine
Coast Regional Council (SCRC) for the proposed Material Change of Use
(MCU13/0064) at Makepeace Island, Noosa North Shore. In accordance with the
Information Request from the SCRC, additional information has been provided to
demonstrate the suitability of the existing wastewater treatment plant and effluent
irrigation area.
An assessment of the existing wastewater infrastructure currently servicing the
accommodation facilities at Makepeace Island was undertaken by Future-Plus
Environmental on the 2nd April 2013. The assessment of the on-site effluent
disposal system was undertaken to determine its suitability to cater for the
proposed change in use from non-publicly available accommodation to ‘letting of
individual rooms of an existing detached house for short term visitor
accommodation’. The number of rooms, guests and facilities remains relatively
unchanged from the original assessment completed by Future-Plus Environmental
(FPE) in 2007.
This report summarises the findings of the site assessment, including an
assessment of the hydraulic loading and effluent irrigation rate associated with the
proposed change in use.
Existing Infrastructure & Sizing
The Makepeace Island accommodation facilities are currently serviced by a
Department of Housing and Public Work (DHPW) approved, Advance Secondary
Novaclear Aerated Waste Treatment System (AWTS) and an associated effluent
disposal area.
p: 07 5450 2688 e: [email protected] PO Box 1250, Buddina Q 4575
f: 07 5450 2686 www.future-plus.com.au ABN 23 658 506 336
Page 3
In accordance with the original Site and Soil Evaluation Report (ref no. 2771-02)
completed by FPE on the 20th June 2007, the AWTS is to have a peak design
capacity of not less than 2,475L/day (13 equivalent persons (EP)). Based on
information supplied by the existing service agent (H2Gold), the AWTS currently
has the peak design capacity of up to 2,700L/day (14 EP) and wet weather storage
capacity of 10,000L. The existing AWTS also has the ability to expand the peak
design capacity of the system through the modification of the internal pump
timing. This is considered to be satisfactory. Photo Plate 1 contained in
Attachment 1 of this correspondence identifies the existing STP.
Treated effluent is currently irrigated via a subsurface irrigation system within
two (2) designated effluent disposal areas. The disposal areas were originally
designed for 495m2 however a total area of 540m2 of raised garden beds was
installed for conservative purposes. The existing raised garden beds have the
capacity to handle a daily irrigation rate of 2,700L based on Table M1 of
AS1547:2012. At the time of the inspection, the effluent disposal areas appeared
to be in good condition, with consistent ground cover. Photo Plate 2 contained in
Attachment 1 of this correspondence identifies the existing land application area.
Wastewater Hydraulic Loading
In accordance with the proposed change in use, the accommodation facilities
located at Makepeace Island will have the capacity to cater for a total of twenty
(20) guests, located in a series of free standing buildings. In addition to the guest
accommodation facilities, a total of five (5) staff members service the island, not
including cleaning staff provided by an external company:
Two (2) staff members (traditionally Chef and Hostess) are permanently
accommodated on-site within the caretaker’s residence.
Two (2) staff members (traditionally Skipper and Maintenance) access the
island between the hours of 7am to 10pm. However, during high
occupancy, the two (2) staff members can also be accommodated onsite.
One (1) additional staff member (traditionally General Manager) accesses
the island between the hours of 7am to 10pm.
Two (2) cleaning staff members are provided by an external company and
access the island for a period of approximately six (6) hours to undertake
pre and post guest cleaning.
The hydraulic loading associated with the guest and staff accommodation
facilities can be most reliably calculated using Chapter 5 Table A of DEHP
(formerly DNR&M) Planning Guidelines for Water Supply and Sewerage, as
follows:
p: 07 5450 2688 e: [email protected] PO Box 1250, Buddina Q 4575
f: 07 5450 2686 www.future-plus.com.au ABN 23 658 506 336
Page 4
Table 1: Calculated Hydraulic Wastewater Flows from DEHP (formerly DNR&M)
Daily Sewage
Rooms per Total Daily Sewage Adopted Total
Item Source Quantity Flow per Room
Structure Flow (L/day) Flow (L/day)
(L/day)
1 Bungalow(s) 3 2 300 – 6001 900 – 1 800 1,350
2 Long House 1 4 225 – 4502 900 – 1 800 900
Onsite
3 Caretaker’s 1 1 225 – 4502 225 – 450 225
Residence (Two
Resident Staff)
Additional Staff
4 Accommodation 1 1 225 – 4502 225 – 450 225
(Two Staff
Members)
Total (L/day) 2,700
Note: 1Flow per person based on two (2) bedroom Apartment/Home Unit with reticulated water supply
2Flow per person based on one (1) bedroom Apartment/Home Unit with reticulated water supply
The hydraulic loading associated with the non-resident staff population can be
most reliably calculated using the DEHP (formerly DNR&M) Determining
Capacity of Sewage Treatment Plants Based on Use Conditions, as follows:
Table 2: Calculated Hydraulic Wastewater Flows from DEHP (formerly DNR&M)
Total Daily Sewage Flow
Item Source Population Flows (L/day/pp)
(L/day)
Non-Resident Staff
1 Member (E.g. General 1 301 30
Manager)
Non-Resident
2 Cleaning Staff 2 15 30
Members
Total (L/day) 60
1Flow per person based on Non-Resident Staff at Hotels/Motels type facility
Based on the above references, a total hydraulic loading of 2,760 litres per day
(14EP) can be estimated for the guest and staff accommodation
facilities/population at the Makepeace Island accommodation facility.
On-Site Wastewater Land Application Area
Effluent irrigation currently occurs via subsurface dripper lines within the existing
raised garden beds, totalling 540m2.
Based on the estimated hydraulic loading of 2,760L/day, the required effluent
irrigation area can be determined using Design Irrigation Rate (DIR) calculation
as set out in Table M1 of AS1547:2012.
p: 07 5450 2688 e: [email protected] PO Box 1250, Buddina Q 4575
f: 07 5450 2686 www.future-plus.com.au ABN 23 658 506 336
Page 5
Table 3: Minimum Required Irrigation Area
Irrigation Area as Determined by Table M1
AS1547:2000 Soil Category
of AS 1547
Soil Category 2 – Sand 552m2
From Table M1 of AS1547:2012 assuming a hydraulic loading of 2,760 litres per
day and a Category 2 soil (DIR of 5mm/day), a minimum application area of
552m2 is required.
Suitability of Existing Wastewater Treatment System and Land Application Area
Based on information supplied by the service agent (H2Gold) the existing
Novaclear AWTS has the capacity to handle a peak hydraulic loading of
2,700L/day. However, based on the relevant guidelines a peak hydraulic loading
of 2,760L/day (14EP) was calculated. Therefore, through the modification of the
Novaclear AWTS pump timing, the peak design capacity of the system is to be
expanded to handling 2,760L/day (14EP).
The accommodation facility is currently serviced by a land application area of
540m2, based on a daily irrigation rate of 2,700L (peak load). However, based on
the calculated hydraulic loading of 2,760L/day a minimum land application area
of 552m2 is required. Therefore, it is proposed to limit the daily irrigation rate to
2,700L through the modification of the irrigation pump system. The additional
60L/day generated during peak occupancy will be retained within the 10,000L
wet weather storage tank for irrigation during off peak times.
The nature of the facility would normally result in fluctuating wastewater flows,
as it is anticipated that it will not operate at 100% occupancy at all times. Given
that the facility has sufficient capacity to treat, manage, irrigate and if necessary
retain effluent at times when required, the impact can be appropriately
accommodated.
The existing Novaclear AWTS and subsurface land application area appear to be
in sound operating condition to accommodate the proposal.
Provided the on-site sewerage facility is maintained in accordance with the
recommendations provided in the Site and Soil Evaluation Report (ref no. 2771-
02) and operation and maintenance manual, there will be minimal risk of impact
to the site and surrounding areas. The system must be operated and maintained in
compliance with the manufacturer’s requirements to ensure this risk is
appropriately managed.
p: 07 5450 2688 e: [email protected] PO Box 1250, Buddina Q 4575
f: 07 5450 2686 www.future-plus.com.au ABN 23 658 506 336
Page 6
We trust that the details set out above are of assistance. Please address all enquires
to Michael Baynes of our office on 07 5450 2688.
Yours faithfully
FUTURE-PLUS ENVIRONMENTAL
Paul Wood
Director
07 54502688
p: 07 5450 2688 e: [email protected] PO Box 1250, Buddina Q 4575
f: 07 5450 2686 www.future-plus.com.au ABN 23 658 506 336
Page 7
Attachment 1
Site Photos from Inspection 2nd April 2013
p: 07 5450 2688 e: [email protected] PO Box 1250, Buddina Q 4575
f: 07 5450 2686 www.future-plus.com.au ABN 23 658 506 336
Page 8
Photo Plate 1: Existing Sewerage Treatment Plant
Photo Plate 2: Existing Land Application Area No.1
p: 07 5450 2688 e: [email protected] PO Box 1250, Buddina Q 4575
f: 07 5450 2686 www.future-plus.com.au ABN 23 658 506 336
Page 9
Photo Plate 3: Existing Land Application Area No.2 p: 07 5450 2688 e: [email protected] PO Box 1250, Buddina Q 4575 f: 07 5450 2686 www.future-plus.com.au ABN 23 658 506 336
Used in these records
REFERENCED DOCUMENT Assessment of Existing Wastewater Infrastructure - MCU13/0064Related documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.