Council archive · source document
Operational Works Application DA Form 1 OPW20-0033 · OPW20/0033
From Subject Date: 10 December 2019 at 12:44 pm To: Sean @ SCG Consulting Engineers en Cc: Tom [email protected] Robilliard steven [email protected] Thank you for recently updating the hydraulics plans with unity water to site their underground sewer line within the Park Rd road reserve and to specify requirements for any building over. Andrew St Baker rocinoosa.com, Frank Macchia Studio stud: kmacchia com, Don Grehan We have decided not to build over and to adopt a landscaping solution for the NW embankment running out along the upper driveway. This drive way is to be closed off and landscaped, with the kerb replace with standard kerb in line with profile above and below drive entry. Additionally the driveway surface water drainage pipe from the above property is to be discharged to the new section of kerb. As part of our application council has asked us to obtain an. r the following: Draft Plan attached. Please undertake this work as an extension to your current project brief asap. Regards Andrew St Baker
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Operational Works Application DA Form 1 OPW20-0033.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.