Council archive · source document
0-Response to Objection Received during Public Notification Period · MCU14/0009
GQ] NOOSA NOOSA COUNCIL IDAS Development Application Decision Notice , 3 of 6 Noosa Council Conditions INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION COUNCIL Land Use 1. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are numbered PDO1 to PD05 (as amended in black pen), prepared by Middap Ditchfield Pty Ltd and dated August 2005; and Part 2 Scope of Works contained within Refurbishment Plan, prepared by the applicant and dated May 2006, and as may be amended by these conditions. The development must be undertaken and operated in a manner that causes no detrimental effect-upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other emissions. , . The disabled access ramp located within the road reserve shall be constructed of materials and colours consistent with the traditional building fagade. The construction timing, transport, access, storage and use of materials adjacent to the building are managed to avoid adversely impacting on the theatre structure, Advertising devices located on the site are designed and sited so as to:- 5.1. Be compatible with the building form, materials and colours of the theatre; 5.2. Do not obscure the appearance or prominence of the site when viewed from Station Street; 5.3. Comply with Council’s policies on advertising. ’ The Development Permit for Reconfiguring a Lot and Building Work assessable against the Planning Scheme lapses if the use has not happened by 26 June 2008 unless an application to extend the currency is approved by Council. Land Development 10. 11. Boundary Realignment For the purpose of these conditions, the following definitions apply: - 7.1. A Plan of Survey means the plan for the reconfiguration of a lot required to be endorsed by : Council pursuant to S3.7.1 of the Integrated Planning Act 1997. 7.2. The person acting on this permit means any person or company who undertakes development pursuant to this permit. The lot reconfiguration shall be generally in accordance with the plan titled “Boundary Realignment’ dated 16/6/2006 as submitted by Shaun Joseph Walsh. In conjunction with the lodgement of the Plan of Survey for Council endorsement, legal documentation shall be presented to Council and shall be submitted in the correct form with the fees prescribed in Council's adopted fee schedule. Pursuant to Section 3.7.3(3)(b) of the Integrated Planning Act, all outstanding rates and charges due and payable to Noosa Council in respect of the lots being reconfigured shall be paid prior to endorsement of the Plan of Survey. Prior to undertaking any excavation, the person acting on this permit shall contact public utility service providers to ascertain the location of their underground services, SEP p:\civica\documenis\da\0 1 0\from1000\0 1 0-2006-00001097-001\0006decnotice.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0-Response to Objection Received during Public Notification Period.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.