Skip to the record
The gold standard in government transparency.

Council archive · source document

0-Response to Objection Received during Public Notification Period · MCU14/0009

of 28

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

NOOSA SHIRE COUNCIL

PLANS APPROVED

SIGNATURE...

 
 
 

 

 

 

 

 

 

 

 

 

DATE...
in the bio box } "| in the bio box ;
Reconstruct Q Reconstruct Safety and to meet $10 000
staircase to . staircase to balcony | current standards Materials, labour
balcony
General repair and | Not Repair of walls, To prevent building $50 000.
maintenance marked | repaint entire deterioration and improve | Materials, labour
including painting building internally | presentation
and;various and externally,
decoration tasks _Teplace carpet in
foyer, general
decoration, and
other general
maintenance tasks
Asbestos removal | Not Removal of To meet statutory \ $16 000
] marked | asbestosin _—._| obligations .| Specialist consultancy
accordance with :
standards
Total: | $676 000 plus
10% contingency
$743 600

 

 

 

 

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0-Response to Objection Received during Public Notification Period.pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.