Council archive · source document
0-Response to Objection Received during Public Notification Period · MCU14/0009
NOOSA SHIRE COUNCIL PLANS APPROVED SIGNATURE... DATE... in the bio box } "| in the bio box ; Reconstruct Q Reconstruct Safety and to meet $10 000 staircase to . staircase to balcony | current standards Materials, labour balcony General repair and | Not Repair of walls, To prevent building $50 000. maintenance marked | repaint entire deterioration and improve | Materials, labour including painting building internally | presentation and;various and externally, decoration tasks _Teplace carpet in foyer, general decoration, and other general maintenance tasks Asbestos removal | Not Removal of To meet statutory \ $16 000 ] marked | asbestosin _—._| obligations .| Specialist consultancy accordance with : standards Total: | $676 000 plus 10% contingency $743 600
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0-Response to Objection Received during Public Notification Period.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.