Council archive · source document
wastewater design · MCU22/0192
Very large file (15.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.
During the excavation processes we recommend separation of the dark grey/brown topsoil (to be spread over the top of the entire installation to facilitate grass growth) from the orange/brown subsoil which is used to backfill the trench/bed. Noosa Council may require an inspection for certification to be carried out before final approval can be issued. Unearthed Geotechnical P/L recommends an inspection for certification to be carried out by the designer prior to commissioning, and preferably during construction, to ensure code compliance and that ‘best practice’ principles have been utilised. Unearthed Geotechnical P/L. 15 Design Report 022-164
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
wastewater design.pdfRelated documentApplication case desk ↗
About this file
- File size
- 15.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.