{Sunshine Coast Checklist - Applications Involving Land
Regional Council Development & Land Use Sections

 

 

IDAS APPLICATION

This checklist should be used for any !DAS application. Please check each of the following items before accepting an
application at the counter.

1. APPLICATION FORMS) Phat oS TR Et
1.1. Form1 PartA . ,

1.1.1 Ensure that the form is fully completed and is a current version.

 

 

 

 

 

1.1.2 In the case of an MCU or Op Works below the. high-water mark, owner’s consent is required.
4.1.2.1 If there are multiple owners, the consent of each owner is required.

4.1.2.2 If the owner of the land is a company, either ACN No, Company name clearly indicated by
signatory) or Company Seal required.

4.2. Form1 Part B-R Supporting Information
4.4.2 Ensure that for each box checked on Form A, the relevant additional Forms 8-R are attached.
1.1.2.1. Ensure that each of Forms B-R which are attached are fully completed. LA

IDA SESSMENT: CHECKLIST? Ree wre are :
2.1 Ensure that relevant sections have been checked and/or completed with regard to referrals © [71

    

2.2 Ensure correct parts of Form 4 are provided where required (ie most common are Part J for
Clearing Vegetation, Part N for Contaminated land and Part P for Prescribed Tidal Works)

   

“ENVIRONMENTALLY REEEVANT-ACTIVITIES oe
3.1. Ensure that Part G is completed if EPA referral is required.

 

 

 

3.2. Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is > paid a and recorded on the application. (Refer Environmental Health for fees)

 

 

 

 

 

 

41 " Ensure that relevant items have been checked and/or completed including information regarding
applicant details along with owners consent if not current owner of land as shown on Council records.
If over multiple properties on one or more sites, consent of Body Corporate is required.
5." oy pe ESF [email protected] Ensure that generally at least 6 sets of the Plan of Development (5 for Reconfi iguration and Operational Le
Works) accompany the application. In addition ensure that each set is complete.

5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is . : 4
unbound.

 

 

 

 

 

6.1 Ensure that t generally at least 6 copies of any y report accompanies the application (5 for Reconfi iguration ~
and Operational Works). If the application is accompanied by a covering letter, ensure that it is
capable of reproduction.

6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. -
6.3 Additionally an electronic version is preferred where possible for ease of electronic record keeping -

 

 

 

 

 

 

7.4. Ensure that the application fee, as determined from the Council’s adopted scale of fees,
accompanies the application or has been paid.

 

 

 

 

 

 

 

« Land Use MCU applications; MCU applications including a Lot reconfiguration; Prescribed Tidal Works; Operational
Work if Jetty or if including Landscaping.

e Land Development Lot Reconfiguration applications and Operational Work not including Landscaping

Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.

 

 

 

NSC g:\landuse\administrative processes\application checklist.doc
Full text of the other 26 pages

Page 2

 

 

YES

- COMMENT:

 

Please tick *
v

 

 

Department of Main Roads (Concurrence or r Advice)

State Controlled Road

 

Dept Natural Resources & Water

Acid sulphate soils (Advice)
Clearing of native vegetation on freehold land (Concurrence)

 

Environmental Protection Agency (Concurrence)

Environmentally Relevant Activity (for non-devolved Council as EPA)
Contaminated land

« Environmental Management/Contaminated Land Register

= UXO

= Land recently used as a ‘notifiable activity’

= Industrial land changed to sensitive uses (eg school)
Coastal related development.
Koala habitat
Wetlands (Advice only)

 

Queensland Transport (Concurrence)

° Railway
. Public Passenger Transport

 

Energex or other responsible entity (Advice)

. Electricity Easements/Substations

 

DIP (Concurrence)

° SEQ Regional plan

 

VARIOUS

. Conservation estate (Advice)

 

  

STATE: AGENCIES + TRIGGERS “= = Se

 

 

 

 

 

EPA

 

Leaner of Natural Resources and Mines

 

 

 

For further clarification refer to [DAS Guides prepared by Department of Infrastructure & Planning.

NSC g:\landuse\administrative processes\application checklist.doc

 

Page 3

B 4
, J

INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008

    

   

ae

Common details

  
   
    

iNppheantdetallscrearp
ae ;
[ceesdla ine appl

 

 

 

  

 

 

et tas econ barat

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Conipany/organisation name {if applicable) [Pite-tt Pty Ltd Noosa Jetty Builders
Individual applicant/(Contact person (if there is more than one applicant, provide additional applicant details on an attachment to this form}

Postal address [Po Box 299 Noosaville QLD 4566
| Contact telephone number Mobite phone number

Facsimile number 07 5474 3480 e-mail address [email protected] |

 

 

 

 

 

 

 

       

  
 

 

Cbinertis pl 3
ai z fis a Me

ion is given to identify the premises)

1. Identify the premises by completing Table A, or Table B andlor Table C (ensure adequate informati
Table A If the application is for a mobile and temporary Environmentally Relevant Activity (ERA), complete Table A only. Then go to Q2.

 

 

 

pag Namie ofeach Gea cavemen area iwhich helmobie andtemp ctary ERA. proposed fe ope
a _—_ .
OR :

TableB ‘Street address for the premises (tick applicable box/es below and insert property description in the table. Identify each lot in a separate row.)
(i) §Q Street address / lot on plan for the premises (Appropriate for most applications including building applications); OF

@ (ii) [[] Street address /lot on plan for the land adjoining or adjacent to the premises (Appropriate for development in watene.g. jetty,
pontoon etc): (Note: Loton plan details may be obtained from title documents, a ‘Rate’ notice, or from the local government} ~ .

HS ORs Street Addie 2

   
   
 
   

 

 

 

 

 

 

 

1
AND/ OR

Table C Coordinates and/or a map of the premises (Appropriate for development in remote areas, ov
Bay) etc.) : ‘ . .

 

   

 

 

 

 

 

 

 

 

2. _ Identify if any of the following apply to the premises by completing Tables D, E, or F. (Note: in most instances, the premises will not involve any of
the following characteristics, however some applications may involve one or more of these characteristics - complete only if applicable)

Page 4

 

INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Table D Complete if the premises are adjacent to or associated with a water body, watercourse or aquifer eg. fiver, creek, lake, canal}

a Mee Creek

 

 

 

 

 

 

 

 

sae ee) re oipo sunowy Si ne ales ED

geiieag.

 

 

3. Indicate the total area of the premises on which the development is proposed: (Note: The total area may include land both above and below water)

 

 

 

Hi ¥
4. Current use/s of the premises: eq vacant land, house, townhouses, apartment building, shop, service station, school, sugar cane farming etc.)

[1 | House

5. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water etc.)?

 

bd Ne No O Yes -- Ensure the pe. location and dimensions of each easement are included in plans, submitted wih the application

 

6. Brief description of the proposal (e.g. 6 unit apartment building, 30 lot residential subdivision, a bore, aquaculture)

 

New Timber Jetty

 

 

 

7. Does the poposal include new buildings or operational work (including any services) on the premises?
QO No x Yes - Ensure the nature, location and dimensions of the proposed w works are included in plans, submitted with the application

 

8. Does the application involve taking or interfering witha State 1 fesource and therefore require a resource entitement? (e.g. the application
involves State land (leased and freehold), declared Fish Habitat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.)

&] No -Goto.Q9 O Yes - Complete Table G - provide details for each evidence required on a separate row, if applicable. Evidence of resource
allocation or entitlement must be submitted with the application. You do not need to answer QQ - go to the next section.

 

9. Complete Table H for applications involving a material change of use; reconfiguration of a lot work on land below high- -water mark and
not within a canal as defined under the Coastal Protection and Management Act 1995, or work on rail corridor land defined under the
Transport Infrastructure Act 1994 - provide details for each owner on a separate row, or on an attachment to this form if applicable.

 

 

 

wel. Mess an, a
MICHELLE G7Sm 00TH i
2 PO. XK (IY YO Srnrsoy
NoosAvilce &C ie

esU0e
* Owner's signature cannot be provided on the form if you intend to submit the application electronically. Owner's consent must be provided to the assessment manager on an
attachment containing appropriate written documentation of the owner's consent. if the owner is a company, $127 of the Corporations Act 2001 (Cwealth) details how a
company may sign as owner. Templates for the provision of owner's consent are available on the 1PA website .

 

 

 

 

 

 

 

 

 

Page 5

Part A, Version 3.1, 3 March 2008

 

    

wolalw|[ am! als] wl rm] =

10. The Portable Long Service Leave Levy (PLsi)i is not applicable to this application if any of the following apply: ( Tick box if applicable)

@ J the application seeks a preliminary approval only;

(C1 the application is not for building and construction work under the Building and Construction Industry (Portable Long Service
Leave) Act 1991, section 3AA (e.g. the application is only for a change of use, or for the following types of work carried out solely for
farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of
regrowth, thinning vegetation or controlling weeds or pests);

{X all costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or
(1 the work is being carried out under an owner-builder permit issued under the Queensland Building Services Authority Act 1991 -

Complete and submit a QLeave Notification and Payment Form (no payment required if owner-builder permit number stated). The receipted form must be
sighted by the assessment manager before a development permit can be given.

11. ls payment of a PLSL levy applicable to this application? (Refer to Q10 and the Advice below for more information)?
BX] No - End of Panta
[Yes - Answer Q12 below

 

OFFICE USE ONLY (For use by the Assessment Manager / Private Certifier} (Optional)

@ fesfi9y 3] convenes] caper PMC py Lu  | Mee] on/ #1
7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 6

 

INTEGRATED. PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008

 

Privacy Statement

The information collected on Form 1 will be used by the Department of infrastructure and Planning (DIP} in accordance with the processing and assessment of your Application,
Your personal details will not be disclosed for a purpose outside of the IDAS process, except where required by legislation (including the Freedom of information Act 1992) or as
retake by Parliament. This information may be stored in a DIP database. The information collected will be retained as required by the Public Records Act 2002.

 

 

Advice for completing Part A

General advice

. Part A of IDAS Development Application Form 1 must be completed and accompany all development applications. The applicant is responsible
for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question. The
Assessment Manger may refuse to receive an application that is not properly made.

D The DAS Assessment Checklist must also be completed for all development applications, other than those requiring assessment against the
Building Act 1975 only, i. those applications requiring the completion of Parts A and B only.

 

 

Applicant details

 

> If the applicant is a company or organisation, a contact person must be nominated. The applicant's signature is not required to be provided

under the IPA.
‘Details of the premises

° The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether or not a building or other
structure is situated on the land). The term ‘land’ is also defined to include the estate in, on, over or under the fand.

le Details of the land are not required if the application involves a mobile and temporary Environmentally Relevant Activity only. Instead complete
Table A.

le The premises may be identified in a number of ways —

« Street address and lot on plan are most common and will apply to most applications.

Coordinates may provide the best means of accurately identifying the location of development proposed in waters, or on a relatively small
development site distant from property boundaries on a large lot. Sufficient coordinates need to be provided to identify the boundary of the
premises the subject of the application. Eastings and northings using GDA94 datum is preferred, but longitude and tatitude and other
(specified) datum such as Zone Reference or GS84 may be provided.

° The definition of ‘water body and ‘watercourse’ can vary from Act to Act.

. StrategicPortLandis within a local government area but a local government's planning scheme does not apply onStrategicPortLand,
StratégicPortLandis declared under the Transport Infrastructure Act 1994. For further information go to IDAS Guide 11 (Development on
strategic port land) and the Queensland Transport (Ports) website.

le ‘Tidal water is defined in the Coastal Protection and Management Act 1995 (Schedule) and ‘tidal area’ for a local government and for strategic
port land is defined in the IPA (schedule 10). Generally, the area below ‘high-water mark’ (defined by the Coastal Act in relation to high water
mark at spring tides) establishes the boundary of a tidal area. Land below high water mark is not within a local government's area unless
provided for under the Loca! Govemment Act 1993. Unless otherwise provided for by legislation, a local government has no jurisdiction below
high water mark. A tidal area for strategic port land is within the jurisdiction of the relevant port authority, while the Environmental Protection

Agency generally. has jurisdiction for a local government tidal area. However, the IPA gives local governments jurisdiction for assessing and

deciding applications for prescribed tidal works within the local govemment tidal area, and the planning scheme may be applied to that

 

 

assessment (to the extent provided for in the code for pres ibed tidal work).
Resource entitlement
° Section 3.2.1(5) of the !PA requires evidence of resource entitiement be given for applications if they involve taking or interfering with a

prescribed State resource. Schedule 10 of the Integrated Planning Regulation 1998 (IPR) prescribes the State resources, including State-
owned land, where evidence is required to be given, and the evidence required to support the application. Link to Integrated Planning
Regulation. Section 3.2.1(10){a)(ii) states an application cannot be taken to be properly made without the required evidence.

le For applications involving the taking or interfering with water under the Water Act, the development application may be made at the same
time as the request for resource entitlement, and the Department of Natural Resources and Water will accept the application as properly made.

e For State-controlied roads, a resource entitlement is not required for an activity that is exempt ancillary works or encroachment (identified by
gazette notice under the Transport Infrastructure Act 1994, section 50), or if the activity requires referral to the Department of Main Roads.

je Evidence may be required from more than one Department responsible for a State-owned resource, e.g. from the Environmental Protection
Agency for quarry material below high water mark, and the Department of Natural Resources and Water in relation to the State-owned land
above high water mark.

 

Owner's consent

> Section 3.2.1(3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the land ownerls,’ if the
application involves: a material change of use; reconfiguration of a lot; work on land below high-water mark and not within a canal as defined
under the Coastal Protection and Management Act 1995, or work on rail corridor land defined under the Transport Infrastructure, Act'1994.

 

 

 

je Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment Manager, during
the processes of the application or in the event of an appeal about the outcome of the application.

le “Owner for the purpose of a lodging an IDAS development application means the person at the time of lodging the application. entitled to
receive the rent for the land (or would be entitled to receive the rent for it if it were let to a tenant at a rent).

le Templates are available from the IPA website for the provision of owner's consent as an attachment to this form. However other documentation
may be used for providing owner's consent provided it is clear the documentation relates to the development application for the p premises.

f° Owner's consent, if required, must be provided even if the applicant is the owner. Owner's consent is not required for a mobile and temporary
ERA. a "

é a

 

Page 7

 

Fong
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008

 

 

Portable Long Service Leave (PLSL) Levy

The Building and Construction Industry Portable Long Service Leave Scheme provides long service leave entitlements to workers in the building
‘and construction industry who would be unlikely to accrue enough service with one employer to qualify for tong service teave. To fund the
Scheme, a Portable Long Service Leave Levy (PLSL levy) is collected on certain building and construction work carried out inQueenstand.

The PLSL levy amount and other prescribed percentages and rates for calculating the levy are stated in the Building and Construction Industry
(Portable Long Service Leave) Regulation 2002. Included in the amount collected by QLeave is the Workplace Health and Safety Fee and the
Building and Construction IndustryTrainingLevy.

The Building and Construction industry (Portable Long Service Leave) Act 1991 (PLSL Act) defines the building and construction work subject to
the PLSL levy and includes renovating, relocating, constructing, altering, demolishing, maintaining or repairing buildings, pools, roads, jetties,
pipelines, fences or earthworks, and works for subdividing, irrigating or draining land.

The PLSL levy need not be paid when the application is made, but the PLSL Act requires the levy to be paid before a development permit may
be issued.

The Assessment Manager must sight an approved form issued by QLeave advising of the status of the payment of the PLSL levy. Building and
Construction Industry Notification and Payment Forms are available from anyQueenstandpost office or agency, on request from QLeave, or can
be completed on the QLeave website at www. gleave,qld.gov.au. For further information contact QLeave (Tel: 1800 803 481 Web:

www. qleave.qld.gov,au )

 

 

 

Page 8

y
INTEGRATED PLANNING ACT 1997

Part P

Prescribed tidal work

Part P, Version 2.1, 3 March 2008

 

 

 

 

 

 

 

[X] Development Permit

 

Preliminary approval

 

 

 

 

 

 

 

 

 

 

P (Tick applicable box)
(Private use
i Jetty, pier or wharf . $15,000.00
Bo ty. Pl {J Non-private use
| (Private use
(} Boat or spillwa'
O fi) oat ramp Or Spliway (I Non-private use
a . (7 Private use
it Mooring pile
CO) i SP (Non-private use
. (Private use
Deck or boardwalk
Cw) ook or boarewal [1 Non-private use
(Private use
Pontoon
Ow LJ Non-private use
. . (Private use
vi Revetment, sea wall or retaining wall .
CJ Wi 9 {1 Non-private use
oO (vii) Other (e.g. abutment, basin, bridge, breakwater, dam,
dock, dockyard, embankment, grayne, pipeline or other |[~] Private use
underground service etc.) - Provide details below
(CZ) Non-private use

 

 

 

2. Is the application within a cul-de-sac, a bend in a waterway or other location where the side boundaries of the lot connected to the
@ work and neighbouring lots are not at right angles to the waterway?

[K] No

CL) Yes - Submit, with the application, photos of any constructed neighbouring structures, or information about approved but unconstructed

neighbouring structures.

  

 

  

—

ing property vidence ob sui

3. __{s the application supported by evidence that the proposed work will not prejudice the access rights of adjoining property owners?

(No Yes. - Complete Q3(a)

3{a) Whatis the nature of the evidence?

    

(Letters of support from adjoining property owner - Submit, with the application, the letters of support.
[<) Plans illustrating a water allocation area - Submit, with the application, the plans illustrating the water allocation area.

Page 9

s

INTEGRATED PLANNING ACT 1997

 
   

ee

Part P, Version 2.1, 3 March 2008

a

4. Has a Registered Professional Engineer of Queensland (RPEQ) or interstate equivalent certified that the works comply with the design
and safety provisions of the State IDAS code for Prescribed Tidal Works contained in the Coastal Protection and Management
Regulation 20037

(No

{X] Yes - Provide details below

Norden

Box 205, Tewantin. QLD 4565
7 5449 7137
7 5449 7172

 

sat

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

roposed tidal work to the lot/s abutting the propos Ba Confirm d
work and the tidal tand on which the work is proposed to be located e
(i) Altother structures on the waterfront and within 20 metres of the proposed works & Confirmed
(ii) The current tocation of Lowest Astronomical Tide (LAT), Highest Astronomical Tide (HAT) and I Confirmed
Mean High Water Springs (MHWS)
iv) — The sfope angles of the beds and banks of the tidat area X Confirmed
{v) Details of the proposed work in accordance with the IDAS code for prescribed tidal work in the
Coastal Protection and Management Regulation 2003, schedule 4A (e.g. physical appearance, lighting, {X] Confirmed
signage, earthworks, public access, infrastructure, structural components, engineering design standards)
(vi) The finished levels of the proposed works & Confirmed
[Xj Confirmed
(vii) Details of the targest vessel, if any, to be moored at the structure
[[] Not epplicable
(vi) Evidence that the proposed work will not prejudice the access rights of adjoining property Confirmed
owners [_] Not applicable
OFFICE USE ONLY
Date Received Reference Numbers CT EPA cost code | 433061

 

 

 

 

 

 

 

Page 10

.

 

INTEGRATED PLANNING ACT 1997 Part P, Version 2.1, 3 March 2008

Advice for completing Part P

 

le

General advice

Part A must also be completed for all IDAS development applications.

The applicant is responsible for answering afl questions fully and correctly, untess following a response there is a statement to go directly to another
question.

When paying fees to the Environmental Protection Agency by electronic funds transfer (EFT) use the process from the information sheet Electronically
paying fees to the Environmental Protection Agency (EPA) and attach the form Electronic Funds Transfer (EFT) payment notification to the application.
For further information about completing this form go to:

 

 

 

. IDAS Guide 24 (Prescribed tidal work)
. Ecoaccess website
. ideli ra
Qi A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise
development to occur.
Q4 A Registered Professional Engineer of Queensland (RPEQ), or the interstate equivalent, may certify that the proposed work complies with the

design and safety provisions of the IDAS code for prescribed tidal work in the Coastal Protection and Management Regulation 2003, schedule
4A. The provision of the certification may reduce the applicable fee for assessment of the work by the local government.

 

 

Page 11

>

IDAS Assessment Checktist, Version 22

     

 

Answering th
unsure, phone or visit your local government or log onto the DIP website www.dip.gid.gov.au for help

 

For ail IDAS development applications (except those for buikding work requiring assessment agains! the Building Act 1975 only) - complete Section 1 of this
checklist

 

Does the application seek approval to make a material change of use of the premises? Yes

ifyes - complete Section 2 of this checklist RINo

 

Does the application seek approval to reconfigure a lof?
if' yes - complete Section 3 of this checklist and Part F of IDAS Application Form 1. if the premises are completely within a single Yes |INo
local government area assessment is by the focal government.

Does the application seek approval to carry out operational work?

 

 

 

if yes - complete Section 4 of this checklist byes |[JNo
Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994? Ces {pao
if yes - complete Section 5 of this checklist

Have you received a referral agency response under section 3.3.2.of the IPA, in relation to this development application?

if yes - complete Section 6 of this checklist L1Yes |KNo

 

Does the application seek approval to carry out building work requiring assessment against a local government planning
scheme? CYes |KINo
If yes - complete Form 1 Part E of DAS Application Form 1. Assessment is by the local government.

Does the application seek approval to carry out building work requiring assessment against the Building Act 1975?
if yes - go to Appendix 1 of this checklist for advice on building referrals. Complete Part B of IDAS Application Form 1. DYes |&INo
Assessment is by a building certifier

Do you wish the application to be assessed against a superseded planning scheme? .
ifyes - complete Form 1 Attachment 7 (Yes |BNo

 

 

 

ls the application for development completely or partly on Caims and Mackay airport land under the Airport Assets
(Restructuring and Disposal) Act 2008?

if'yes - Assessment is by the Department of Infrastructure and Planning. Complete Form 7 Part D of IDAS Application Form 7 ifthe |) Yes |K)No
application is for a material change of use, and Part E if for building or operational work. Also, the application must be referred to the
local government as Advice Agency.

 

 

 

 

 

Page 12

     

IDAS Assessment Checklist, Version 22

BY No-Gotor1s {J Yes

IPA, schedule 8, part 1, lable 5, item 2 IP Regutatinn, schedule 2, lable 2 dein 18.

1.18 Does the proposal involve development intended to be carried out on a place entered in a local heritage register under part 11 of
the Queensland Heritage Act 1992, other than if the place is on Caims or Mackay airport land?

No-Gotoar2  [(] Yes

IPA, schedule &, part 7, lable 5, item 2A, IF Regulation, schedule 1, patt 2, table $, tem 2.

 
   

aah aunts

12 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
[XJ No-Gotoar3 [} Yes

IPA, schedule 8 part 1, table 5, tem 1; IP Regulation, schedule 2, table 2, item 11; IP Regulation, schedule 1, table 5, item 2 (wild river area); Waler Act 2000,
section 966C; Wild Rivers Act 2008, section 43A

  
     

ESR sebitaicnattea ts ud A aka

1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
[XJ No-Gotoaz4 (_] Yes

IPA, schedule 8, part 1, table 2, item 1; IPA, schedule 8, part 1, table 5, items 3 and 4; IP Reguiation, schedule 2, table 2, tems 1 and 23; Environinental Protection Act 1994, section
73AA (wikt river area); Wild Rivers Act 2005, section 43A; relevant wold river declaration; Wild Rivers Code.

 
   

14 {s any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
BX] No - Goto ais

(Yes

IP Regulation, schedule 2, table 2, items 15 and 16

 

[IX] No - Goto.a7.6

O Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
@ 8, this application requires assessment by the Department of Primary industries and Fisheries (DPI&F). If DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.

IP Requiation, schedule 2, table 2, tem 26

  
   

 

eas zis

16 Is any part of the premises designated for community infrastructure?

[X] No - Gotoq.7

(J Yes
JP Regulation, schedule 2, table 3, item 7

merce

  
   

 

 

V7 Does the proposal involve the establishment or expansion of a waste water disposal system?

[J No - Endor Section? [_] Yes
iP Requiation, schedule 2, table 3, item 5

Page 13

i

   
   

 

41

     
 

4.2

FIELAWHTEERECONEIGUR

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22

aie

is the proposed operational work assessable under any State planning regulatory provisions?

fINo [J Yes
{f no, is the proposed operational work assessabie under the planning scheme?
[I No - Goto Q4.2 (71 Yes - complete Farm 1, Part E and answer Q4.1.1- 4.1.7 below

- SESDEMINE COMMERCE OR TOUSTRO

   

Is any of the proposed operational work associated with reconfiguring a fot and the reconfiguration is also assessable?

(K] No -Gotoas3 [_] Yes

IPA, schedule 8, part 1, table 4, item 2; IP Reguiation, schedule 1, part 2, table 5, item Ue}
Wild Rivers code (Note: the code does not currently contain applicable provisions for residential, industrial or commercial development inside a designated urban
area)

 

 
 

4.3B

ts any of the proposed operational work for the clearing

[X] No -Gotoa43B [_} Yes
IP Regulation, schedule 2, table 2, item 34A

   

NCES. f Hh
of native vegetation to which the Vegetation Management Act 1999
applies?

[4] No -Gotoasa ([] Yes

IPA, schedule 8, part 1, table 4, items 1A-1G; IP Regulation. schedule 2, table 2, item 5 (vegetation clearing), IP Regulation, schedule 2, table 2, item 34 {koala
conservation); IP Regulation, schedule 1, part 3, table 4, item (vegetation clearing/wild river area); Vegetation Management Act 1999, section 22A (vegetation
clearing/wikt river area); Wild Rivers Act 2005, sections 31F and 43A

 

45

Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and other than under
the Water Act 2000, section 20(2), (3) or (5), or from a dam constructed on a watercourse or lake?

(J No -Got0a45 [[] Yes - Answer (a) and (0) below -

IPA, schedule 8, pait 1, table 4, items 3a); IP Regulation, schedule 2, wble 2, item 8; IP Regulation, schedule 1, part 3, table 4, items 3 and 3A; Walter Act 2000, section 966A (wild tivet
area); Wild Rivers Act 2008, section 434; relevant val river declaration; Wild Rivers Code

{ls any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or

interfering with artesian water (other than using a water truck to pump water)?

46

47

48

Ri No Goto Q4.6 oO Yes - (Complete Form 1, Part K,) This application requires assessment by the Department of Natural Resources and Water
(NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

IPA, schedule 8, part 7, table 4, item 3(b); IP Regulation, schedule 2, table 2, itesn 8; IP Regulation, schedule 1, pant 3, table 4, item 3

Wikl Rivers code (Nate: the code does not currenily contain applicable provisions for taking or interfering with artesian water)

is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water)?
[J] No -Gotoas7 [[] Yes - Answer (a) and (b) below
IPA, schedule 8, pavt 1, table 4, item 3{c}{i); IP Requiation, schedule 2, table 2, itent 8: IP Reguiation, schedule 1, part 3, lable 4, item 3; Water Act 2000, section 966A (wild river area):
Wild Rivers Act 2008, section 43A; relevant wild river declaration; Wild Rivers Code,

Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water}?
RR) No -Gotoasa [[] Yes

IPA, schedule 8, part 1, table 4, item 3(c}(ii): IP Regulation, schedule 2, table 2, item 8; IP Regulation, schedule 1, part 3, table 4, item 3
Water Act 2000, section 966A (wild river area}(Note: no current Wild River declaration identifies taking or interfering with subartesian water as assessable)
Wild River code (Note: the code does not cisrently contain applicable provisions for sub artesian water)

Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck fo pump water}?

[1 No -Gotoas9 [7] Yes - Answer both (a) and (b) below

Page 14

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklisi, Version 22
IPA, scherhile 8, par i, lable 4, tems 2{¢}§) and 3{G): IP Reqution, sche:tile 2, table 2. tem 9 IP Regulation, schedule 1, part 3, table 4, kem 3A; Weler Act 2600, seaion 9668 (wild
river afea); relevant wit! iver declaration; Wild Rivers Code.

49 ts the proposed operational work for the following?

() For the construction of a referable dam as defined under the Water Supply (Safety and Reliability)
{No (J Yes

Act 2008
(i) To increase the storage capacity of a referable dam by more than 10% & No (4 Yes

If yes to either or both (i) or (ii) above - (Complete Form 1, Part K,) This application requires assessment by ihe Department of Natural Resources and
Water (NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as
Cancurrence Agency.

IPA, schedule 8, part 1, table 4, tem 4; IP Regulation, schedule 2, table 2. item 10

 

4.10 ls any of the proposed operational work tidal work, other than excluded work defined under the !PA?
[No -Gotoas11 xj Yes - Answer (a) and (b) below

(a) 's any of the proposed tidal work prescribed tidal work?
Yes [_} No
If yes, is any of the proposed prescribed tidal work to be carried out in a wild river area declared under the Wild
Rivers Act 2005?
KJ No (Yes
lino, is the work proposed in a canal?
XJNo (J Yes
If no, is any of the proposed tidal work for a marina with more than 6 vessel berths?
—X No- (Complete Form 1, Part P). if the Environmental Protection Agency (EPA) is not the Assessment

Manager for the application, the agency has jurisdiction as Concurrence Agency. The application
also requires assessment by Queensland Transport (Maritime Safety Qid) as Concurrence Agency.

(1 Yes - (Complete Form 1, Part P). if the Environmental Protection Agency (EPA) is not the Assessment
Manager for the application, the agency has jurisdiction as Concurrence Agency. The application
also requires assessment by Queensland Transport (Maritime Safety Qld) as Concurrence Agency
and Qid Fire and Rescue Service as Advice Agency.

(b) Is any of the proposed tidal work to be carried out in one or more of the following tidal areas?

(0 One only local government tidal area [ No [Yes
(ii) Starting in one local government tidal area and extending into another local No Cl Yes
government tidal area (but in no strategic port tidal area)
(ii) in two or more local government tidal areas but not starting in either tocal
government fidal area BX] No C] Yes
(iv) One only strategic port tidal area i] No LC] Yes
{v) Ane area that is not a strategic port tidal area or a local government tidal BI No Cl Yes

Note: The answers you provide in (i) - (v) above may affect who the Assessment Manager is for the application.

IPA, schedule 8, part 1, table 4, item 5; iP Regulation, schedule 2, table 2, items 12, 14 and 17; IP Regulation, schedule 1, part 3, table 4, items 4A and 5
Coastal Protection and Management Act 1995, section 104A (wild river area)

 
   

441 Is any of the operational work proposed to be carried out within a coastal management district?
EX] No -cotoasiz [_] Yes

IPA, schedule 8 part 1, table 4, item 5; IP Regulation, schedule 2, table 2, items 12 and 14; IP Regulation, schedule 1, part 3. table 4, items 4A and &
Coastal Protection and Management Act 1995 Act 1995, section 104A {wild river area); Wild Rivers Act 2008, section 43A

 
   

Bus pr a et ay Re
4.12 Is any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?

BR No -Gotoos73 [Yes

IPA, schedule 8, pat |, table 4, item 6; IPA, schedule 8, part 2. table 4, dem 2: Fisheries Regudation 1995 51130 {seif-assessable codes}: iP Reguiation, schedule 2, iable 2, ite 26: IP
Regulation, schedule 1, part 3, table 4, item 6; Fisheries Act 1994, section 76D {wild river area); Witd Rivers Act 2005, section 434,

 

Page 15

Yon

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22

 
  

 
 
   

TSH, x
4.13 fs any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 1994?
[K] No - Goto 04.74
Yes

IPA, schedule 8 part 1. lable 4, lem /: IPA, schedule 8, part 2, table 4, item 3: Fishories Reguiation 1995 $173A (sell-assessable codes): IP Requialion, schectuie 2, lable 2, tem 25:1P
Reguttion, schedule 1, part 3, table 4, items 7; Witt Rivers Act 2005, sections 43A; Fisheries Aci, section 760C (wild river area).

   
  

 

   

ies PEERS

414 {s any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?

{XJ No -Gotoasis {"] Yes

IPA, scheditle 8, part 1, table 4, tam 8; IPA, schedule 8 part 2, table 4, kem 4; Fisheries Regulation 1995 s713A (sef-assessable codes): IP Regulation, schedule 2, table 2, tem 29;1P
Regulation, schedule 1, part 3, tale 4, item 8; Fisheries Act 1994, section 76DB {vdld river area}; Wid Rivers Act 200: ion 434; relevant wild river deciaration; Wiki Rivers Code.

 

 

4.15 \s any of the operational work proposed to be carried out in a wild river area deciared under the Wild River Act 2005?

DX] No -Gotoasi6 [[] Yes
IPA, schedule 8, part 1, table 4, item 10; IP Regulation, schedule 2, table 2, item 37; Wild Rivers Act 2005, sections 42, 434

 

4.16 {s any part of the premises located in part of a future State-contralled road, or within 100m of a State-contralled road?
{K] No -Endofsections {_] Yes

IP Regulation, schedule 2, table 2, item 3

 

Disclaimer:
While the Department of Infrastructure and Planning (DIP) believes that this information contained on this form and provided as part of
this process will be of assistance to you, it is provided on the basis that you wiil not rely on the Information without first making your own
enquiries regarding the interpretation and application of the applicable legislation to your circumstances.

To the full extent permitted by law DIP expressly disclaims ali liability (including but not limited to liability for negligence) for errors or
omissions of any kind or for any loss {including direct and indirect losses), damage or other consequence which may arise from your
reliance on this process and the information contained on this form.

 

 

 

 

Page 16

_Queensland
Government

 

Maritime Safety
Queensland

23 March 2009

Noosa Jetty Builders : : Queensland Transport
PO Box 229

Noosaville QId 4566

“Dear Sir

 
  

“Operational Work, Prescribed i Tidal Worl rks — = “Request for comments
* "Jetty — N & C Smoothy, 59 Wyuna Drive, Noosa Heads (Lot 29)

Sets Sie etenecitte,

 

’ Thank you for youir letter of 14 March 2009 about your proposal to construct a jetty at the location
mentioried above.

 

Asa concitrrencé’ agency, Maritime Safety Queensland has no objection to the proposal provided the

following navigation and marine safety conditions are complied with.

1. The contractor must build the jetty according to John Norden & Associates, Drawing No 09/09-1,
attached to your I letter dated 14 March 2009.

|

a

2. No part of the structure or any ship berthed at this structure is to come closer than 1.5metres from
the side boundaries of the allocated water space as shown on the submitted water allocation plan.

3. In the absence of a designated quayline, the structure and any part thereof must not extend beyond
that of neighbouring approved structures.

 

4. The jetty, and all freestanding piles must be lit and clearly visible to > approaching vessels. The
contractor must position all lighting so it it does not cause a risk to the safe n navigation of other |
vessels,

eee era,

5. The applicant or his agent is responsible for the removal of any existing structure above or below
the waterline, and must contain and remove any debris. Any pile that needs to be removed must
be totally extracted.

6. The ship moored at this jetty must follow the most direct course from this structure to open waters
anda similar direct course when returning to this pontoon.

Maritime Safety Queenstand . Our ref 710/01649(1) Pagess £30774 F15

Marine Operations (Brisbane) - Your ref
MacArthur Avenue East , : Enquiries James 0" Cotinor. op 6
Pinkenba Queensland 4008 . Telephone +617 3860. 3604
. Facsimile +61 7. ‘3860 3574
ABN 13 200 330 620 * Website. wow, 84 qid gov.au -
Email r@miq. qld.gov.au

  

See

Page 17

7. The owner is to ensure that the ship berthed at this structure must maintain sufficient under keel
clearance at all stages of tide. The ship must comply with any local restrictions placed on channel
depths and draft restrictions.

8. Any ships and equipment you or your agent use must comply with the Transport Operations
(Marine Safety) Act 1994, the Transport Operations (Marine Safety) Regulation 2004 and the
Transport Operations (Marine Pollution) Act 1995.

9. Any ships using this structure must comply with the Transport Operations (Marine Safety) Act
1994 and the Transport Operations (Marine Safety) Regulation 2004.

10. Any ship moored at this jetty must not impede the safe navigation of other ships or restrict safe
access to or from neighbouring structures.

a TIAiiy shiprdry-berth-o device (ineluding’Air Lifting Pontoons) berthed, moored or attached fo the
; pontoon/structure must not exceed the following sizes: ‘

Wet Berth : Dry Berth
Length Overall- 5 metres NIA
Beam - 2 ~=metres

12. The contractor must construct the jetty within two years from the date of approval. If
construction is not completed, you will need additional or amended comments from the Regional
Harbour Master.

Maritime Safety Queensland does not need to be further consulted if all of the above conditions are
met.

The above conditions must be included in your application to the assessment manager.
This agency will also forward a copy of this letter to the Assessment Manager.

Yours sincerely

Captain Richard C Johnson
Regional Harbour Master (Brisbane)

Maritime Safety Queensiand . Page 2 of 2

4

wl

f,

ie

d

Page 18

 

Notice

Coastal development

Notice of decision — Provision of evidence of resource entitlement

This notice is issued by the Department of Environment and Resource Management pursuant to section 3.24 of the

integrated Planning Act 1997 fo provide resource entitlement as delegated under the Land Act (Tidal works and prescribed
tidal work) Delegation (No. 1) 2008.

who?

Mr and Mrs Nev Smoothy , CC: Queensland Primary Industries and Fisheries”
Clo Noosa Jetty Builders ‘ . Planning and Assessment (South)
PO Box 299 PO Box 76

cal

NOOSAVILLE QLD 4566 DECEPTION BAY QLD 4508

Our reference: HiM2.1 3367; MCY2128
Attention: Ms Emma Reed ‘ * : TO
Re: Request for evidence of resource entitlement for the prescribed tidal works application for a new
timber jetty in Weyba Creek at 59 Wyuna Drive, Noosaville, otherwise known as Lot 29 on

N10575 , pursuant to section 3.2.1 of the Integrated Planning Act 1997, by Nev and Michelle
* Smoothy , ,

Dear Ms Reed

crys “ . ye . ‘
The Department of Environment and Resource Management, under the Land Act (Tidal works and prescribed
tidal work) Delegation (No. 1) 2008, has considered your request received on 31 March 2009 and wishes to
advise you of the decision as specified below: :

 

 

 

Property owner: _ | Nev and Michelle Smoothy
Activity: - | Prescribed tidal work
Activity description: Construction of a new timber jetty

say >

 

Drawing no. 09/09—-1 dated February 2009, showing the water allocation plan _
"and framing layout A

 

Pian / Drawing number:

Drawing no. 09/09-2 dated February 2009, showing the side elevation, front
‘| elevation and section details. :

 

 

 

 

 

Page 1 of 2+ 080131

Department of Environment and Resource Management

., Www.derm.qid.gov.au ABN 87 221 168786

 

Page 19

ecoaccess

environmental licences and permits

Notice
Notice of decision — Provision of evidence of resource entitlement

 

59 Wyuna Drive, NOOSAVILLE
Description of subject land:

 

Lot 29 Plan N10575

 

Decision: . Evidence of resource entitlement is granted.

 

Decision Number: CSRE00427009

 

This decision is current for 6 | The evidence of resource entitlement can be used to support a development
months appliction for six (6) months from the date of this notice.

 

 

 

 

You are advised that all applications involving disturbance of marine plants require a development approval
from the Department of Employment, Economic Development and Innovation (IDAS Form 1 Part ©,). e

It is important to note that the provision of evidence of resource entitlement over State land means that the State
has no objection to the lodgement of the application for development approval. It does not:

¢ imply approval of the development application; or
* affect functions the agency may exercise as the assessment manager or a referral agency; or

* authorise a right to use and occupy land.

You may need to comply with the cultural heritage duty of care guidelines under the Aboriginal Cultural Heritage
Act 2003 and the Torres Strait islander Cultural Heritage | Act 2003, refer to the guidelines on
www.derm.qid.gov.au.

{f you require more information, please contact Louise Pinn, the Project Manager, on the telephone number listed
below.

woh

Yours sincerely

| @
Sehr. br leer. a

 

Signature , Date
Ben Sale Enquiries:
Delegate ES - Reg Serv - Bne North - Sunshine Coast
Environmental Services p oan 168
i Ox
Department of Environment and Resource Management COTTON TREE QLD 4558

Phone: (07) 5459 6132
Fax: (07) 5443 9927

 

Page 2 of 2 + 080134 Department of Environment and Resource Management

Page 20

  

Notice

Integrated Planning Act 1997

Early Concurrence Agency Response

This notice is issued by the Department of Environment and Resource Management pursuant to Sections 3.3.2, 3.3.16
and 3.3.18 of the Integrated Planning Act 1997 to.advise of a decision or action.

Mr and Mrs Nev Smoothy CC:

Clo Noosa Jetty Builders
PO Box 299
NOOSAVILLE QLD 4566

Attention: Mrs Emma Reed

Re: Request for earty concurrence response

Dear Mrs Reed ©

Chief Executive Officer
Sunshine Coast Regional Council

Locked Bag 72

SCMC QLD 4560

Our reference: HM2.1.3367;-MCY2128

The Department of Environment and Resource Management (DERM), wishes to advise that the request for
early concurrence agency response, received on 31 March 2009, has been assessed, and on 22 June 2009
a decision was made to issue a response for consideration of the assessment manager when the application

wos eos : .
becomés properly made.
SORE. : 2m

"4. | Property/Location: -

 

 

Street Address 59 Wyuna Drive
. ..| NOOSAVILLE QLD 4566
"| Lot/Plan ‘Lot 29 Plan N10575

 

 

2. Detaiis of the recommendation

 

 

 

timber jetty Operational Work

 

 

 

Activity (Referral Tri Aspect of Recommendation DERM Decision
ctivity (Referral Triggers) Development Number

Prescribed Tidal Work being Early Concurrence . . - .
for construction of.a new Response for Granted in full with IPCC01443709

conditions

 

 

 

 

Page 1 of 2 * AF080109 tot oGs

Department of Environment and Resource Management
www.derm.qid.gov.au ABN 87 221 158 786

 

Page 21

ecoaccess 7 oe

environmental licences and permits
Notice
Early Concurrence Agency Response

3. . Currency period

This approval will lapse unless substantially started within the currency period/s set by the Assessment
Manager OR the standard currency periods stated in section 3.5.21 of the integrated Planning Act
1997 applying to each aspect of development in this approval AND/OR the following currency periods
applying to aspects of development in this approval.

This approval will lapse unless substantially started within two years.

4. The approved plans

The approved plans and/or documents for this approval are:

 

 

 

Plan/Document No. Plan/Document Name Date
Drawing 09/09-1 WATER ALLOCATION PLAN AND February 2009

FRAMING LAYOUT @
Orawing 09/09-2 FRONT ELEVATION, SIDE ELEVATION February 2009

AND SECTION DETAILS

 

 

 

 

 

5. Codes for self-assessable development

Any self-assessable development for an environmentally relevant activity conducted in conjunction
with this approval, must comply with the relevant code of environmental compliance.

6. Assessment Manager Responsibilities

Please note that it is a requirement under Sections 3.5.15 and 3.5.17 of the Integrated Planning Act 1997
that a copy of the final Decision Notice (which includes DERM’s concurrence response) for this application
issued by the Sunshine Coast Regional Council, be forwarded to each referral agency. Therefore could you
please send a signed hardcopy to DERM's Ecoaccess Customer Service Unit, PO Box 15155 CITY EAST
4002 and an electronic copy to [email protected] addition, the State’s Native Title Work Procedures indicate that responsibility for assessment of native “>
issues for an IDAS application rest with the Assessment Manager. Therefore in this instance, DERM has n
provided a notification to native title parties.

If you require more information, please contact Louise Pinn, the Project Manager, on the telephone number
listed below.

Yours sincerely

Enquiries:
ES - Reg Serv - Bne North - Sunshine Coast -
DERM

Ben Sale PO Box 168

Delegate COTTON TREE QLD 4558

Environmental Services Phone: (07) 5459 6132

Department of Environment and Resource Management Fax: (07) 5443 9927

Page 2 of 2 » AF080109 Department of Environment and Resource Management

Page 22

  
 
   
  
     
   

18 Integrated Planning Act 1997

be
meas ee OAS

DERM Permit!

ase

number: IPCC01443709

 

 

DERM Permit’ number: IPCC01443709
Assessment Manager reference: N/A
Applicant: Nev and Michelle Smoothy

Date application received by DERM: 31 March 2009

Permit! Type: Early Concurrence Response for Operational Work
_ | Date of Decision: 22 June 2009 .
© Decision: Granted in full with conditions
Relevant Laws and Policies: Coastal Protection and Management Act 1995 and any

subordinate legislation

Jurisdiction: Item 9 in Table 2 of Schedule 2 of the Integrated Planning
Regulation 1998

 

 

Development Description

 

Property iLot/Plan Aspect of Development

 

59 Wyuna Drive
NOOSAVILLE QLD 4566

Prescribed Tidal Work being for construction of a

Lot 29 Plan N10575 new timber jetty

 

 

 

 

 

Reasons for inclusion of development conditions

In accordance with section 3.3.18(8) of the integrated Planning Act 1997 and section 278 of the Acts
@ interpretation Act 1954, the reasons for the inclusion of development conditions are:

The Department of Environment and Resource Management (DERM) is a concurrence agency under the
Integrated Planning Regulation 1998 for coastal management under the Coastal Protection and Management
Act 1995, excluding amenity or aesthetic significance or value.

Additional information for applicants

The standard currency periods stated in section 3.5.21 of the integrated Planning Act 1997 or the nominated
currency period, apply to each aspect of development in this permit’. For information on when this permit takes
effect and the relevant currency periods, please see point 3 in the Early Concurrence Agency Response Notice.

ee
1 Permit includes licences, approvals, permits, authorisations, certificates, sanctions or equivalent/similar as
required by legislation administered by the Department of Environment and Resource Management.

 

Page 1 of 4

Department of Environment and Resource Management
www.derm.qid.gov.au ABN 87 221 158 786

  

Page 23

a

Contaminated Land

It is a requirement of the Environmental Protection Act 1994 that if an owner or occupier of land becomes aware
a Notifiable Activity (as defined by Schedule 2 of the Environmental Protection Act 1994) is being carried out on
the land or that the land has been affected by a hazardous contaminant, they must, within 30 days after
becoming so aware, give notice to the Department of Environment and Resource Management.

Gute,

Ben Sale
Delegate
Environmental Services .
Department of Environment and Resource Management

 

Page 2 of 4 Department of Environment and Resource Management

-

DERM Permit number: IPCC01443709 ~’

Page 24

oO DERM Permit number: IPCC01443709

 

CONDITIONS OF APPROVAL

General Permit Condition

Agency Interest: Coastal

1

All works are to be constructed in accordance with the attached approved drawings and specifications
listed in the approved plans section in the notice attached to this permit.

The chief executive administering the Coastal Protection and Management Act 1995 may order the
works to be removed or modified, within a reasonable time, if the works have or are likely to have a
significant effect on coastal management because the works:

(a) create a navigation hazard or other danger to the public; or
(b) cause erosion or land degradation; or
(c) are unstable or have not been constructed according to the approved plans.

All reasonable and practicable measures must be taken to prevent pollution of watercourses or
stormwater systems as a result of silt run-off, oit and grease spills from machinery, concrete truck
washout and alike. Concrete agitator wash out must only be conducted in a specified area to facilitate
the removal of waste concrete from the area to landfill. Wastewater from cleaning equipment must not
be discharged directly or in-directly to any watercourses or stormwater systems.

"

Agency Interest: Water

4

There is to be no visible sediment plume greater than 30 metres from.the proposed structure. If a
visible plume exists 30 metres from the proposed structure, works must immediately cease and a
sediment net must be positioned around the plume until it has settled and is no longer visible.

 

Page 3 of 4

Department of Environment and Resource Management

 

let Baten,

Page 25

DERM Permit number: IPCC01443709 |*

DEFINITIONS

Words and phrases used throughout this permit! are defined below. Where a definition for a term used in this
permit’ is sought and the term is not defined within this permit’ the definitions provided in the relevant legistation
shall be used.

“approval” means ‘notice of development application decision’ or ‘notice of concurrence agency response’
under the integrated Planning Act 1997.

“approved plans” means the plans and documents listed in the approved plans section in the notice attached
to this development approval.

"Department of Environment and Resource Management” means the department or agency (whatever
called) administering the Coastal Protection and Management Act 1995 or the Environmental Protection Act
1994. °

"land" in the "land schedule" of this document means land excluding-waters and the atmosphere.

“site" means jand or tidal waters on or in which it is proposed to carry out the development approved under this
development approval.

“watercourse” means’4 river, creek or stream in which water flows permanently or intermittently-

«ina natural channel, whether artificially improved or not; or ‘ e@
= in an artificial channel that has changed the course of the watercourse.

‘ “waters" includes river, stream, lake, lagoon, pond, swamp, wetland, unconfined surface water, unconfined
{ water natural or artificial watercourse, bed and bank of any waters, dams, non-tidal or tidal waters (including the
'sea), stormwater channel, stormwater drain, roadside gutter, stormwater run-off, and groundwater and any part-
thereof.

 

"works" or "operation" means the development approved under this development approval.

"you" means the holder of this development approval or owner / occupier of the land which is the subject of
this development approval.

END OF CONDITIONS

 

Page 4 of 4 Department of Environment and Resource Management

Page 26

18/12 2008 09:46 FAX. oo2/004

CURRENT TITLE SEARCH

NATURAL RESOURCES AND WATER, QUEENSLAND
Request No: $562863 :
Search Date: 18/12/2008 09:20 Title Reference: 15962113
Date Created: 02/04/1980
REGISTERED OWNER
Dealing No: 709600975 17/05/2006

NEVILLE MARK SMOOTHY
MICHELLE GABRIELLE SMOOTHY > JOINT TENANTS

ESTATE AND LAND

Estate in Fee Simple

LOT 29 CROWN PLAN N20575
@ County of MARCH Parish of WEYBA
Local Government: SUNSHINE COAST

EASEMENTS, ENCUMBRANCES AND INTERESTS

1. Rights and interests reserved to the Crown by
Deed of Grant No. 15962113 (ALLOT 29 SEC 2)

ADMINISTRATIVE ADVICES - NIL

UNREGISTERED DEALINGS - NIL

CERTIFICATE OF TITLE ISSUED - Yes 24/05/2006 709600978 Certificate No. 2
** End of Current Title Search **

COPYRIGHT THE STATE OF QUEENSLAND (NATURAL RESOURCES AND WATER) (2008)
Requested By: SMIS

 

 

Page 1/1

Page 27

“pergsed tou ov9 swouipuoWe J LorENpordal PeTOUNEU “0A fa pesopuo Ov70q spun ot eoTAId wsB KO

PUSS TSOIN [orne feo marzven] Gapaaeae awAeS WORD FF

 

 

 

 

 

 

 

 

 
  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

See gid Jo WEIS WT [exe mel mare Tse coum 8R0e @F

se yam fo 4umo> | - “ooatr “wvl8 @ | copay

"AFM SO HSiavd . ‘weet Asad | woe | aseourw
2295 2 OG WIS RO get BF NTT F : y garni | 2
<P ISP OOTMUESTE OUT) A 4 | > ere

FTIUAVSOON JO WHOL

 

 

 

 

 

 

 

SHOWN FONIUILIY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

96006 ;

JIS OL TON 2501 OBSy OASLSOIN

Used in these records

About this file

File size
1.8 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_0871 - Operational Works - Prescribed Tidal Works - Jetty [As Published].pdf · 1.8 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.